1 floors · 4,600 sq ft · built 1930 · class E1 · owner of record: Pell Realty Llc
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 59 days | Keep the report on file (not filed with DOB) |
| Gas piping inspection (2029 cycle) Likely applies Local Law 152 · During 2029 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 2 is on the 2029 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2029 in 1155 days | Next cycle year 2029 |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Jul 24, 2019 | Construction CLASS - 1 FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER CONTAINED IN SUMMONS/VIOLATION#39002899J ISSUED ON 05/13/19 AND TO FILE A CERTIFICATE OF CORRECTION PURSUANT TO 28-201.1 AND 1RCNY 102-01.INSTALLED WOOD BEAMS & #35401465P | Oct 1, 2019 DEFAULT | $12,500 |
| Jul 24, 2019 | Construction CLASS - 2 FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER CONTAINED IN SUMMONS/VIOLATION#39002898H ISSUED ON 05/13/19 AND TO FILE A CERTIFICATE OF CORRECTION PURSUANT TO 28-201.1 AND 1RCNY 102-01.@REAR OF 1 STY BUILDING #35401147J | Oct 1, 2019 DEFAULT | $3,125 |
| May 13, 2019 | Construction CLASS - 1 INSTALLED WOOD BEAMS AND PLYWOOD FOR ROOF WITHOUT PERMIT., OBTAIN PERMIT; PROVIDE LIC. ENGINEER REPORT FOR STRUCTURAL STABILITY #39002899J | Jul 5, 2019 IN VIOLATION | $2,500 |
| May 13, 2019 | Construction CLASS - 1 AT REAR OF 1 STORY BUILDING, SECTION OF ROOF APPROX. 25' X 30' HAS COLLAPSED DUE TO LARGE ACCUMULATION OF WATER FROM BLOCKED DRAINS,, REPAIR AND/REPLACE; REPAIR AND/REPLACE. PROVIDE LIC. ENGINEER REPORT FOR STR #39002898H | Jul 5, 2019 IN VIOLATION | $6,250 |
None open.
| Issued | Violation | Status |
|---|---|---|
| Sep 18, 2025 | Gas Piping - LL152 FTF-PL-PER Cycle 1, Sub-cycle B (premises is in Community District 2) | Active |
None open.
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Nov 2, 2026, 8:56 PM ET. BBL 4004600058.