3 floors · 54 apartments · 44,100 sq ft · built 1950 · class C1 · owner of record: Pandora Realty Llc
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 49 days | Keep the report on file (not filed with DOB) |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 49 days | Annual |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 65 days | Annual |
| Energy and water benchmarking Likely applies Local Law 84 · May 1 each year What this isBuildings over 25,000 sq ft (this lot shows 44,100 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page | May 1, 2027 in 170 days | Annual filing |
| Building emissions report Likely applies Local Law 97 · May 1 each year (extensions available) What this isCovered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page | May 1, 2027 in 170 days | Annual filing |
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Sep 1, 2027 in 293 days | Registered through 2027-09-01 |
| Gas piping inspection (2027 cycle) Likely applies Local Law 152 · During 2027 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 11 is on the 2027 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2027 in 414 days | Next cycle year 2027 |
| Annual boiler inspection (1 boiler) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-02-04 (Accepted). Agency page | On file | 2026 reports accepted |
None open.
None open.
None open.
| Issued | Class | Violation | Correct by |
|---|---|---|---|
| Aug 31, 2026 | B | § 27-2005 ADM CODE FIRE ESCAPE DEFECTIVE. ADJUST THE DROPLADDER SO THAT IT WILL SLIDE EASILY IN THE GUIDE RODS AT NORTH 1 FIRE ESCAPE AT WEST | Oct 5, 2026 |
| Dec 15, 2025 | C | Apt 5G · § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD-PAINT THAT IS XRF TESTED INCONCLUSIVE FOR LEAD CONTENT AT 0.5MG/CM2 AND IS PRESUMED LEAD PAINT AS SET FORTH IN (28 RCNY §11-07(b)) AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE-USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(b)(2) 1st | Jan 8, 2026 |
| Nov 28, 2025 | C | Apt 5G · § 27-2056.7, 27-2056.8, 27-2056.9 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY PERFORMING ACTIVITIES NECESSARY TO ABATE PRESUMED LEAD PAINT THAT IS XRF TESTED INCONCLUSIVE AT 0.5 MG/CM2 (28 RCNY §11-07(B)) FROM REQUIRED WINDOW AND/O | Dec 22, 2025 |
| Nov 28, 2025 | B | Apt 5G · § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... GREATER THEN 10 SQFT AT NORTH WALL, SOUTH WALL, EAST WALL, CEILING IN THE BATHROOM LOCATED AT APT 5G, 2nd STORY, 2nd APARTMENT FROM SOUTH AT WEST | Jan 2, 2026 |
| Date | Source | What | Now |
|---|---|---|---|
| Aug 31, 2026 | HPD B | § 27-2005 ADM CODE FIRE ESCAPE DEFECTIVE. ADJUST THE DROPLADDER SO THAT IT WILL SLIDE EASILY IN THE GUIDE RODS AT NORTH 1 FIRE ESCAPE AT WEST | Open |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)