Queens · Block 783 · Lot 36 · 11105

42-13 23 Avenue

3 floors · 6 apartments · 3,780 sq ft · built 1922 · class C2 · owner of record: 4213 23rd Avenue Llc

34open violations
$0ECB/OATH penalties owed
15HPD class C (immediately hazardous)
50dto Bedbug annual filing

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 50 days
Keep the report on file (not filed with DOB)
Bedbug annual filing Applies
Local Law 69 · December 1 to 31 each year
What this is

Owners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page

Dec 31, 2026
in 50 days
Annual
Annual boiler inspection (1 boiler) Applies
Boiler inspection · By December 31 each year
What this is

Boilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2022-03-18 (Accepted). Agency page

Dec 31, 2026
in 50 days
1 of 1 without an accepted 2026 report yet
Annual notice: window guards and lead paint Applies
HPD / Health Code · January 1 to 16 each year
What this is

Deliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page

Jan 16, 2027
in 66 days
Annual
Annual property registration Applies
HPD registration · September 1 each year
What this is

Residential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page

Sep 1, 2027
in 294 days
Registered through 2027-09-01
Gas piping inspection (2028 cycle) Likely applies
Local Law 152 · During 2028
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 1 is on the 2028 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2028
in 781 days
Next cycle year 2028

Open violations

ECB / OATH (0)

None open.

DOB (5)
IssuedViolationStatus
Nov 14, 2025LOW PRESSURE BOILER
VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION
#16276
DOB VIOLATION - ACTIVE
Sep 23, 2024LOW PRESSURE BOILER
VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL LOW PRESSURE INSPECTION
#14889
DOB VIOLATION - ACTIVE
Jun 30, 2023LOW PRESSURE BOILER
VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL LOW PRESSURE INSPECTION
#08219
DOB VIOLATION - ACTIVE
Feb 24, 2017LOW PRESSURE BOILER
VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2015 INSPECTION REPORT
#12839
DOB VIOLATION - ACTIVE
May 15, 2014LOW PRESSURE BOILER
VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2012 INSPECTION REPORT
#19293
DOB VIOLATION - ACTIVE
DOB NOW Safety (9)
IssuedViolationStatus
Jan 8, 2026Gas Piping - LL152 FTF-PL-PER
Cycle 2, Sub-cycle A (premises is in Community District 1)
Active
Nov 14, 2025Boiler LBLVIO
VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION
Active
Sep 23, 2024Boiler LBLVIO
Violation Issued-Failure To File 2023 External Low Pressure Inspection Report
Active
Nov 14, 2023Boiler FTC-BE-EXT-LP
Violation Issued-Failure To File 2019 External Inspection Affirmation of Correction for LP Device
Active
Nov 14, 2023Boiler FTC-BE-EXT-LP
Violation Issued-Failure To File 2022 External Inspection Affirmation of Correction for LP Device
Active
Nov 14, 2023Boiler FTC-BE-EXT-LP
Violation Issued-Failure To File 2021 External Inspection Affirmation of Correction for LP Device
Active
Jun 30, 2023Boiler LBLVIO
VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL LOW PRESSURE INSPECTION
Active
Feb 24, 2017Boiler LBLVIO
VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2015 INSPECTION REPORT
Active
May 15, 2014Boiler LBLVIO
VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2012 INSPECTION REPORT
Active
HPD (20) · C 15 · B 2 · A 3
IssuedClassViolationCorrect by
May 6, 2026A(A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPDS WEBSITE, WWW.NYC.GOV\HPD, SEARCH BED BUGS.Aug 9, 2026
Jun 13, 2025C§ 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE HINGES ON BULKHEAD DOOR TO ROOF AT PUBLIC HALL, 3rd STORYJun 27, 2025
Jun 13, 2025C§ 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE HINGES ON DOOR TO CELLAR AT PUBLIC HALL, 1st STORYJun 27, 2025
Jun 13, 2025C§ 27-2005 ADM CODE & 309 M/D LAW ABATE THE NUISANCE CONSISTING OF UNCAPPED GAS LINE AT WEST WALL AT BASEMENTJun 19, 2025
Jun 13, 2025C§ 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE LATCH ON VESTIBULE DOOR AT PUBLIC HALL, 1st STORYJun 27, 2025
Jun 13, 2025B§ 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE LATCH ASSEMBLY ON VESTIBULE DOOR AT PUBLIC HALL, 1st STORYJul 18, 2025
Jun 13, 2025B§ 27-2005 ADM CODE & 309 M/D LAW ABATE THE NUISANCE CONSISTING OF THREE PIECES BATHROOM WITH WASH BASIN, WATER CLOSET, BATHTUB AND PLUMBING LINES FOR RESIDENTIAL SINK, DISCONNECT THE FIXTURES AND PROPERLY SEAL THE PIPE CONNECTIONS AT BASEMENTJul 18, 2025
Jun 13, 2025C§ 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE HINGES ON DOOR TO REAR YARD AT BASEMENTJun 27, 2025
Jun 13, 2025C§ 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE HINGES ON DOOR TO FRONT YARD AT BASEMENTJun 27, 2025
Jun 13, 2025C§ 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE HINGES ON DOOR TO SECURITY ROOM AT BASEMENTJun 27, 2025
Jun 13, 2025C§ 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE HINGES ON DOOR TO METER ROOM AT BASEMENTJun 27, 2025
Jun 12, 2025CApt 2F · § 27-2005 ADM CODE & 309 M/D LAW ABATE THE NUISANCE CONSISTING OF KEY OPERATED LOCK INSTALLED ON DOOR TO ROOM WITH FIRE ESCAPE WINDOW IN THE 4th ROOM FROM NORTH AT WEST LOCATED AT APT 2F, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTHJun 18, 2025
Jun 12, 2025CApt 2R · § 27-2005 ADM CODE & 309 M/D LAW ABATE THE NUISANCE CONSISTING OF KEY OPERATED LOCK INSTALLED ON DOOR TO ROOM WITH FIRE ESCAPE WINDOW IN THE 1st ROOM FROM NORTH AT WEST LOCATED AT APT 2R, 2nd STORY, 1st APARTMENT FROM WEST AT NORTHJun 18, 2025
Jun 12, 2025CApt 3F · § 27-2005 ADM CODE & 309 M/D LAW ABATE THE NUISANCE CONSISTING OF KEY OPERATED LOCK INSTALLED ON DOOR TO ROOM WITH FIRE ESCAPE WINDOW IN THE 4th ROOM FROM NORTH AT WEST LOCATED AT APT 3F, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTHJun 18, 2025
Jun 12, 2025CApt 3R · § 27-2005 ADM CODE & 309 M/D LAW ABATE THE NUISANCE CONSISTING OF KEY OPERATED LOCK INSTALLED ON DOOR TO ROOM WITH FIRE ESCAPE WINDOW IN THE 1st ROOM FROM NORTH AT WEST LOCATED AT APT 3R, 3rd STORY, 1st APARTMENT FROM WEST AT NORTHJun 18, 2025
Apr 27, 2023C§ 27-2009.2 FAILURE TO DISTRIBUTE AND POST SAFE CONSTRUCTION BILL OF RIGHTS AND/OR NOTICE OF THE TENANT PROTECTION PLAN. SUCH NOTICES SHALL REMAIN POSTED UNTIL THE COMPLETION OF THE DESCRIBED PERMITTED WORK.May 3, 2023
Nov 25, 2019CApt 1R · § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... AT CEILING ( APPROX 65 SQ.FT ) IN THE BATHROOM LOCATED AT APT 1R, 1st STORY, 1st APARTMENT FROM WEST AT NORTHDec 30, 2019
Nov 25, 2019CApt 1R · § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... AT NORTH WALL ( APPROX 30 SQ.FT ) AND EAST WALL ( APPROX 30 SQ.FT ) IN THE 1st ROOM FROM NORTH AT EAST LOCATED AT APT 1R, 1st STORY, 1st APARTMENT FROM WEST AT NORTHDec 30, 2019
Jan 28, 2019A§ 26-1103 ADMIN. CODE: POST AND MAINTAIN A PROPER NOTICE ON WALL OF THE ENTRANCE STORY IN ENGLISH AND SPANISH ON THE AVAILABILITY OF THE AGENCYS HOUSING INFORMATION GUIDE. A SAMPLE NOTICE CAN BE FOUND AT WWW.NYC.GOV/HPD. AT PUBLIC HALL, 1st STORYMay 3, 2019
Jan 28, 2019A§ 27-2046.1 HMC: POST A PROPER NOTICE OF CARBON MONOXIDE DETECTING DEVICE REQUIREMENTS, IN A FORM APPROVED BY THE COMMISSIONER, IN A COMMON AREA OF A CLASS A MULTIPLE DWELLING NEAR INSPECTION CERTIFICATE OR PROVIDE NOTICE TO TENANTS IN A PRIVATE DWELLING. AT PUBLIC HALL, 1st STORYMay 3, 2019

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Nov 11, 2026, 4:22 PM ET. BBL 4007830036.

Look up another building