Queens · Block 701 · Lot 3 · 11103

42-11 28 Avenue

5 floors · 27 apartments · 26,840 sq ft · built 1926 · class C7 · owner of record: Santis Peter

14open violations
$0ECB/OATH penalties owed
0HPD class C (immediately hazardous)
58dto Bedbug annual filing

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 58 days
Keep the report on file (not filed with DOB)
Bedbug annual filing Applies
Local Law 69 · December 1 to 31 each year
What this is

Owners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page

Dec 31, 2026
in 58 days
Annual
Annual notice: window guards and lead paint Applies
HPD / Health Code · January 1 to 16 each year
What this is

Deliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page

Jan 16, 2027
in 74 days
Annual
Energy and water benchmarking Likely applies
Local Law 84 · May 1 each year
What this is

Buildings over 25,000 sq ft (this lot shows 26,840 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page

May 1, 2027
in 179 days
Annual filing
Building emissions report Likely applies
Local Law 97 · May 1 each year (extensions available)
What this is

Covered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page

May 1, 2027
in 179 days
Annual filing
Annual property registration Applies
HPD registration · September 1 each year
What this is

Residential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page

Sep 1, 2027
in 302 days
Registered through 2027-09-01
Gas piping inspection (2028 cycle) Likely applies
Local Law 152 · During 2028
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 1 is on the 2028 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2028
in 789 days
Next cycle year 2028
Annual boiler inspection (1 boiler) Applies
Boiler inspection · By December 31 each year
What this is

Boilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-01-27 (Accepted). Agency page

On file2026 reports accepted

Open violations

ECB / OATH (0)

None open.

DOB (1)
IssuedViolationStatus
Jun 20, 2023LOW PRESSURE BOILER
VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL LOW PRESSURE INSPECTION
#20943
DOB VIOLATION - ACTIVE
DOB NOW Safety (3)
IssuedViolationStatus
Sep 25, 2026Benchmarking - LL84 DQ-EN-BENCH
FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4
Active
Nov 14, 2023Boiler FTC-BE-EXT-LP
Violation Issued-Failure To File 2021 External Inspection Affirmation of Correction for LP Device
Active
Jun 20, 2023Boiler LBLVIO
VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL LOW PRESSURE INSPECTION
Active
HPD (10) · C 0 · B 7 · A 3
IssuedClassViolationCorrect by
Jan 26, 2026BApt C4 · § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... GREATER THEN 10SQ FT AT CEILING IN THE BATHROOM LOCATED AT APT C4, 3rd STORY, 2nd APARTMENT FROM NORTH AT EASTMar 2, 2026
Dec 14, 2023B§ 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK OVER CEILING AT PUBLIC HALL, 5th STORYJan 18, 2024
Dec 14, 2023A§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT CEILING AT PUBLIC HALL, 5th STORYMar 18, 2024
May 15, 2023BApt C4 · § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... AT SOUTH WALL AND CEILING APPROXIMATELY 20 SQUARE FT IN THE BATHROOM LOCATED AT APT C4, 3rd STORY, 2nd APARTMENT FROM EAST AT SOUTHJun 19, 2023
May 8, 2023BApt C4 · § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... AT SOUTH WALL ( APPROX 10 SQ FT ) IN THE BATHROOM LOCATED AT APT C4, 3rd STORY, 2nd APARTMENT FROM EAST AT SOUTHJun 12, 2023
Mar 16, 2015ASECTION 26-1103 ADMIN. CODE: POST AND MAINTAIN A PROPER NOTICE ON WALL OF THE ENTRANCE STORY IN ENGLISH AND SPANISH ON THE AVAILABILITY OF THE AGENCY?S HOUSING INFORMATION GUIDE. A SAMPLE NOTICE CAN BE FOUND AT WWW.NYC.GOV/HPD., 1st STORYJun 19, 2015
Jan 22, 2015BApt D3 · SECTION 27-2026 ADM CODE REPAIR THE BROKEN OR DEFECTIVE CONNECTION WASTE PIPE AT WASH BASIN IN THE BATHROOM LOCATED AT APT D3, 4th STORY, 1st APARTMENT FROM NORTH AT EASTFeb 26, 2015
Jan 22, 2015BApt D3 · SECTION 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK CEILING IN THE BATHROOM LOCATED AT APT D3, 4th STORY, 1st APARTMENT FROM NORTH AT EASTFeb 26, 2015
Jan 22, 2015AApt D3 · SECTION 27-2026 ADM CODE RESET, SO AS TO SECURE A PROPER AND TIGHT CONNECTION, THE WATER CLOSET BOWL ... IN THE BATHROOM LOCATED AT APT D3, 4th STORY, 1st APARTMENT FROM NORTH AT EASTApr 27, 2015
Jan 22, 2015BApt D3 · SECTION 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR WALLS AND CEILING IN THE BATHROOM LOCATED AT APT D3, 4th STORY, 1st APARTMENT FROM NORTH AT EASTFeb 26, 2015

Issued in the last 120 days

DateSourceWhatNow
Sep 25, 2026DOB SafetyBenchmarking - LL84: FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4Open

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Nov 3, 2026, 12:24 PM ET. BBL 4007010003.

Look up another building