2 floors · 8,175 sq ft · built 1931 · class K2 · owner of record: Cheney, Nathan/Trustee
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Gas piping inspection (2026 cycle) Likely applies Local Law 152 · During 2026 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 4 is on the 2026 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2026 in 69 days | Due this year |
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 69 days | Keep the report on file (not filed with DOB) |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Sep 22, 2026 | Construction CLASS - 1 FAILURE TO MAINTAIN BUILDING IN A CODE-COMPLIANT MANNER. SUBJECT CONSISTS OF A 2-STORY PORTION ALONG HIMROD ST AND A 1-STORY PORTION ALONG KNICKERBOCKER AVE ON "L" SHAPED LOT WITH EXP 1 ON HIMROD ST AND EXP 2 O #35733245Y | Dec 2, 2026 PENDING | $2,500 |
| Issued | Violation | Status |
|---|---|---|
| Sep 22, 2026 | CONSTRUCTION EMERGENCY WORK ORDER-OBSVD @ EXP1 ABOVE 2FL WINDOW OPENINGS WITH SLIGHT BULGING/MISSING MORTAR/DIAGNOL STEP CRACKING WITH SOME COURSES @ BRICK PROJECTING. OWNER TO IMMED RETAIN DOB REG G.C TO INSTALL S/W SHED AT FULL LENGTH OF EXP1 WITH 5' OVER HANG AT EXP1/2 CORNER #PI30402AG | DOB VIOLATION - ACTIVE |
| Sep 22, 2026 | CONSTRUCTION CORRECTIVE ACTION PLAN REQ'D-OBSVD @ EXP1 ON HIMROS ST BULGING,MISSING MORTAR,DIAGNOL STEP CRACKS & MISSING BRICKS ABOVE 2FL WINDOW OPENINGS OWNER TO IMMED RETAIN A REG DESIGN PROF IN GOOD STANDING WITH DOB & NYS TO EVAL THE ENTIRE BLDG AND SUBMIT A CORRECTIVE ACTION PLAN BY 10/22/2026 #PI30401AG | DOB VIOLATION - ACTIVE |
| Jan 13, 1997 | LOCAL LAW 10/81 - ELEVATOR #03047 | DOB VIOLATION - ACTIVE |
None open.
None open.
| Date | Source | What | Now |
|---|---|---|---|
| Sep 22, 2026 | DOB | CONSTRUCTION: EMERGENCY WORK ORDER-OBSVD @ EXP1 ABOVE 2FL WINDOW OPENINGS WITH SLIGHT BULGING/MISSING MORTAR/DIAGNOL STEP CRACKING WITH SOME COURSES @ BRICK PROJECTING. OWNER TO IMMED RETAIN DOB REG G.C TO INSTALL S/W SHED AT FULL LENGTH OF EXP1 WITH 5' OVER HANG AT EXP1/2 CORNER | Open |
| Sep 22, 2026 | DOB | CONSTRUCTION: CORRECTIVE ACTION PLAN REQ'D-OBSVD @ EXP1 ON HIMROS ST BULGING,MISSING MORTAR,DIAGNOL STEP CRACKS & MISSING BRICKS ABOVE 2FL WINDOW OPENINGS OWNER TO IMMED RETAIN A REG DESIGN PROF IN GOOD STANDING WITH DOB & NYS TO EVAL THE ENTIRE BLDG AND SUBMIT A CORRECTIVE ACTION PLAN BY 10/22/2026 | Open |
| Sep 22, 2026 | ECB | Construction: FAILURE TO MAINTAIN BUILDING IN A CODE-COMPLIANT MANNER. SUBJECT CONSISTS OF A 2-STORY PORTION ALONG HIMROD ST AND A 1-STORY PORTION ALONG KNICKERBOCKER AVE ON "L" SHAPED LOT WITH EXP 1 ON HIMROD ST AND EXP 2 O | Open |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Oct 23, 2026, 7:57 AM ET. BBL 3032780028.