1 floors · 6,885 sq ft · built 1928 · class K1 · owner of record: 232nd Llc
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 63 days | Keep the report on file (not filed with DOB) |
| Gas piping inspection (2027 cycle) Likely applies Local Law 152 · During 2027 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 12 is on the 2027 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2027 in 428 days | Next cycle year 2027 |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Jun 26, 2026 | Construction CLASS - 2 WORK WITHOUT PERMIT. OBSERVED A STOREFRONT SIGN THAT SAYS NORTH BRONX PHARMACY FARMACIA. ERECTED AND INSTALLED, SIGN IS 100% COMPLETE. STOREFRONT SIGN APPROX 57" FT L BY 2" FT WIDE BY 4" FT TALL WITHIN PROPERTY #39194020Z | Sep 4, 2026 ADMIT/IN-VIO | $0 |
| Sep 17, 2025 | Construction CLASS - 1 WORK WITHOUT A PERMIT: ATOI I OBSERVED UNPERMITTED AND UNDOCUMENTED REMOVAL OF A EXITING BEARING WALL INSIDE THE PHARMACY, AT EXPOSURE#4 AND ILLEGAL CONVERTED THE TWO PROPERTY INTO ONE WITHOUT A PERMIT. NEED TO #39160772X | Nov 21, 2025 ADMIT/IN-VIO | $0 |
| Mar 10, 2022 | Construction CLASS - 1 FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER CONTAINED IN SUMMONS/VIOLATION#35562898H ISSUED ON 10/20/2021 AND TO FILE A CERTIFICATE OF CORRECTION PURSUANT TO 28-201.1 AND 1RCNY 102-01.WORK WITHOUT A PERMIT. #35568686N | Dec 16, 2022 DEFAULT | $6,250 |
| Dec 6, 2021 | Construction CLASS - 1 FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER CONTAINED IN SUMMONS/VIOLATION#35562898H ISSUED ON 10/20/2021 AND TO FILE A CERTIFICATE OF CORRECTION PURSUANT TO 28-201.1 AND 1RCNY 102-01.WORK WITHOUT A PERMIT. #35564833X | Apr 1, 2022 DEFAULT | $6,250 |
| Oct 20, 2021 | Construction CLASS - 1 FAILURE TO COMPLY W/COMMISSIONER'S ORDER CONTAINED IN SUMMONS/V39029494L ISSUED 9/3/20 &TO FILE C/C PURSUANT TO28-201.1&1RCNY102-01.COMPLY W/COMMISSIONER'S ORDER &/OR FILE C/C. #35562898H | Feb 18, 2022 DEFAULT | $6,250 |
| Aug 23, 2021 | Construction CLASS - 1 FAILURE TO COMPLY W/THE COMM'S ORDER CONTAINED IN SUMMONS/VIO#39029494L ISSUED ON 09/03/20 & TO FILE A CERT OF CORRECTION PURSUANT TO 28-201.1 & 1RCNY 102-01. FOR: WORK W/O A PERMIT. NOTE: NO RECORD OF PERMIT #35561697R | Feb 11, 2022 DEFAULT | $6,250 |
| Mar 4, 2021 | Construction CLASS - 1 FAILURE TO COMPLY W/THE COMM'S ORDER CONTAINED IN SUMMONS/VIO#39029494L ISSUED ON 09/03/20 & TO FILE A CERT OF CORRECTION PURSUANT TO 28-201.1 & 1RCNY 102-01. WORK W/O PERMIT. AT ROOF INSTALLED SPLIT A/C UNIT. #35525849Z | Jun 18, 2021 IN VIOLATION | $2,500 |
| Oct 26, 2020 | Construction CLASS - 2 FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER CONTAINED IN SUMMONS/VIOLATION#35502209Z ISSUED ON 09/03/20 AND TO FILE A CERTIFICATE OF CORRECTION PURSUANT TO 28-201.1 AND 1RCNY 102-01.FAILURE TO MAINTAIN BUIL #35521400K | Feb 12, 2021 IN VIOLATION | $1,250 |
| Sep 3, 2020 | Construction CLASS - 1 WORK WITHOUT A PERMIT. AT TIME OF INSPECTION OBSERVED, SPLIT A/C UNIT MOUNTED AND INSTALLED AT ROOF LEVEL WITHOUT ANY CONSTRUCTION OR ELECTRICAL PERMIT., OBTAIN PERMIT #39029494L | Jan 15, 2021 IN VIOLATION | $2,500 |
| Sep 3, 2020 | Construction CLASS - 1 FAILURE TO MAINTAIN BLDG WALLS OR APPURTENANCES. NOTED: OBSERVED AT THE NORTH EAST ELEVATION OF 4168 WHITE PLAINS ROADS;RETAINING WALL W/CHAIN LINK FENCE ON TOP IS MISSING A 3FT BY 12 INCH SECTION OF CONCRETE. #35502209Z | Nov 6, 2020 IN VIOLATION | $5,379 |
| Apr 5, 2019 | Construction CLASS - 1 WORK W/O A PERMIT: OBSERVED NEWLY EXCAVATION WORK APPROXIMATLEY 6' BY 30 LINEAR FEET OF EARTH. ALSO ERECTED A CMU WALL APPROX 6'*30 LINEAR FT @EXP#3 DEPT OF BUILDING RECORDS INDICATE NO PERMIT HAS BEEN OBTAINED #35356321X | Jun 14, 2019 IN VIOLATION | $0 |
| Issued | Violation | Status |
|---|---|---|
| Nov 14, 2025 | HIGH PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2024 INTERNAL HGH PRESSURE INSPECTION #01076 | DOB VIOLATION - ACTIVE |
| Nov 14, 2025 | HIGH PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL HGH PRESSURE INSPECTION #00275 | DOB VIOLATION - ACTIVE |
| Sep 23, 2024 | HIGH PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL HGH PRESSURE INSPECTION #00287 | DOB VIOLATION - ACTIVE |
| Sep 23, 2024 | HIGH PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2023 INTERNAL HGH PRESSURE INSPECTION #01141 | DOB VIOLATION - ACTIVE |
| Jun 30, 2023 | HIGH PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2020 INTERNAL HGH PRESSURE INSPECTION #01894 | DOB VIOLATION - ACTIVE |
| Jun 30, 2023 | HIGH PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2021 INTERNAL HGH PRESSURE INSPECTION #04230 | DOB VIOLATION - ACTIVE |
| Jun 30, 2023 | HIGH PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL HGH PRESSURE INSPECTION #03099 | DOB VIOLATION - ACTIVE |
| Jun 30, 2023 | HIGH PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL HGH PRESSURE INSPECTION #00741 | DOB VIOLATION - ACTIVE |
| Jun 20, 2023 | HIGH PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2018 INTERNAL HGH PRESSURE INSPECTION #02016 | DOB VIOLATION - ACTIVE |
| Jun 20, 2023 | HIGH PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL HGH PRESSURE INSPECTION #00806 | DOB VIOLATION - ACTIVE |
| Jun 20, 2023 | HIGH PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL HGH PRESSURE INSPECTION #03218 | DOB VIOLATION - ACTIVE |
| Jun 20, 2023 | HIGH PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2019 INTERNAL HGH PRESSURE INSPECTION #04361 | DOB VIOLATION - ACTIVE |
| Apr 25, 2023 | HIGH PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2022 INTERNAL HIGH PRESSURE INSPECTION #00340 | DOB VIOLATION - ACTIVE |
| Apr 25, 2023 | HIGH PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2022 EXTERNAL HIGH PRESSURE INSPECTION #01488 | DOB VIOLATION - ACTIVE |
| Dec 23, 2020 | FAIL TO CERTIFY CLASS 1 FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION #00287 | DOB VIOLATION - ACTIVE |
| Nov 25, 2020 | FAIL TO CERTIFY CLASS 1 FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION #00304 | DOB VIOLATION - ACTIVE |
| Mar 16, 2020 | HIGH PRESSURE BOILER VIOLATION ISSUED - FAILURE TO FILE 2017 INTERNAL HIGH PRESSURE BOILER INSPECTION #00372 | DOB VIOLATION - ACTIVE |
| Mar 16, 2020 | HIGH PRESSURE BOILER VIOLATION ISSUED - FAILURE TO FILE 2017 EXTERNAL HIGH PRESSURE BOILER INSPECTION #00347 | DOB VIOLATION - ACTIVE |
| Jun 26, 2019 | FAIL TO CERTIFY CLASS 1 FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION #00585 | DOB VIOLATION - ACTIVE |
| Jun 22, 2018 | HIGH PRESSURE BOILER VIOLATION ISSUED FOR FAILURE TO FILE 2016 ANNUAL HIGH PRESSURE BOILER INSPECTION #00097 | DOB VIOLATION - ACTIVE |
| Apr 6, 2018 | LOW PRESSURE BOILER VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2016 INSPECTION REPORT #06896 | DOB VIOLATION - ACTIVE |
| Jun 23, 2017 | HIGH PRESSURE BOILER VIOLATION ISSUED FOR FAILURE TO FILE 2015 ANNUAL HIGH PRESSURE BOILER INSPECTION #00126 | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Nov 14, 2025 | Boiler HBLVIO VIOLATION ISSUED-FAILURE TO FILE 2024 INTERNAL HGH PRESSURE INSPECTION | Active |
| Nov 14, 2025 | Boiler HBLVIO VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL HGH PRESSURE INSPECTION | Active |
| Sep 23, 2024 | Boiler HBLVIO VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL HGH PRESSURE INSPECTION | Active |
| Sep 23, 2024 | Boiler HBLVIO VIOLATION ISSUED-FAILURE TO FILE 2023 INTERNAL HGH PRESSURE INSPECTION | Active |
| Jun 30, 2023 | Boiler HBLVIO VIOLATION ISSUED-FAILURE TO FILE 2020 INTERNAL HGH PRESSURE INSPECTION | Active |
| Jun 30, 2023 | Boiler HBLVIO VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL HGH PRESSURE INSPECTION | Active |
| Jun 30, 2023 | Boiler HBLVIO VIOLATION ISSUED-FAILURE TO FILE 2021 INTERNAL HGH PRESSURE INSPECTION | Active |
| Jun 30, 2023 | Boiler HBLVIO VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL HGH PRESSURE INSPECTION | Active |
| Jun 20, 2023 | Boiler HBLVIO VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL HGH PRESSURE INSPECTION | Active |
| Jun 20, 2023 | Boiler HBLVIO VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL HGH PRESSURE INSPECTION | Active |
| Jun 20, 2023 | Boiler HBLVIO VIOLATION ISSUED-FAILURE TO FILE 2018 INTERNAL HGH PRESSURE INSPECTION | Active |
| Jun 20, 2023 | Boiler HBLVIO VIOLATION ISSUED-FAILURE TO FILE 2019 INTERNAL HGH PRESSURE INSPECTION | Active |
| Apr 25, 2023 | Boiler HBLVIO VIOLATION ISSUED - FAILURE TO FILE 2022 INTERNAL HIGH PRESSURE BOILER INSPECTION | Active |
| Apr 25, 2023 | Boiler HBLVIO VIOLATION ISSUED - FAILURE TO FILE 2022 EXTERNAL HIGH PRESSURE BOILER INSPECTION | Active |
| Dec 23, 2020 | AEUHAZ FTC-AEU-HAZ | Active |
| Nov 25, 2020 | AEUHAZ FTC-AEU-HAZ | Active |
| Mar 16, 2020 | Boiler HBLVIO VIOLATION ISSUED - FAILURE TO FILE 2017 EXTERNAL HIGH PRESSURE BOILER INSPECTION | Active |
| Mar 16, 2020 | Boiler HBLVIO VIOLATION ISSUED - FAILURE TO FILE 2017 INTERNAL HIGH PRESSURE BOILER INSPECTION | Active |
| Jun 26, 2019 | AEUHAZ FTC-AEU-HAZ | Active |
| Jun 22, 2018 | Boiler HBLVIO VIOLATION ISSUED FOR FAILURE TO FILE 2016 ANNUAL HIGH PRESSURE BOILER INSPECTION | Active |
| Apr 6, 2018 | Boiler LBLVIO VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2016 INSPECTION REPORT | Active |
| Jun 23, 2017 | Boiler HBLVIO VIOLATION ISSUED FOR FAILURE TO FILE 2015 ANNUAL HIGH PRESSURE BOILER INSPECTION | Active |
None open.