2 floors · 3 apartments · 2,475 sq ft · built 1899 · class C0 · owner of record: Miah, M.A. Bashar
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 48 days | Keep the report on file (not filed with DOB) |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 48 days | Annual |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 64 days | Annual |
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Sep 1, 2027 in 292 days | Registered through 2027-09-01 |
| Gas piping inspection (2028 cycle) Likely applies Local Law 152 · During 2028 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 3 is on the 2028 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2028 in 779 days | Next cycle year 2028 |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Oct 3, 2023 | Construction CLASS - 2 WORK W/O PERMIT. NOTED: (1) AT EXTERIOR - EXP:1, AWNING AT BSMT LEVEL REPLACED WITH NEW, DOUBLE IN SIZE APPROX 12'X12'. (2) FRONT YARD WAS PARTIALLY EXCAVATED TO ALTER + ADD STAIRS TO A PRE-EXISTING BILCO-DOOR #35671173N | Dec 16, 2024 IN VIOLATION | $0 |
None open.
None open.
| Issued | Class | Violation | Correct by |
|---|---|---|---|
| Mar 21, 2025 | B | Apt 2 · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE RADIATION AIR VALVE AT NORTH WALL IN THE 1st ROOM FROM NORTH AT EAST LOCATED AT APT 2, 1st STORY, 1st APARTMENT FROM SOUTH AT WEST | Apr 25, 2025 |
| Mar 21, 2025 | A | Apt 2 · § 27-2013 ADMIN. CODE: PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE 1st ROOM FROM NORTH AT WEST, THE KITCHEN , THE 4th ROOM FROM NORTH, THE BATHROOM , THE 1st ROOM FROM NORTH AT EAST LOCATED AT APT 2, 1st STORY, 1st APARTMENT FROM SOUTH AT W | Jun 24, 2025 |
| Mar 21, 2025 | B | Apt 2 · § 27-2046.1 HMC: REPAIR OR REPLACE THE CARBON MONOXIDE DETECTING DEVICE(S). MISSING IN THE ENTIRE APARTMENT LOCATED AT APT 2, 1st STORY, 1st APARTMENT FROM SOUTH AT WEST | Apr 25, 2025 |
| Mar 21, 2025 | B | Apt 2 · § 27-2005 ADMIN. CODE: PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE REGLAZE BATHTUB WITH PORCAILAN PAINT IN THE BATHROOM LOCATED AT APT 2, 1st STORY, 1st APARTMENT FROM SOUTH AT WEST | Apr 25, 2025 |
| Mar 21, 2025 | B | Apt 2 · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE SINK BASE CABINET DOOR AT EAST WALL IN THE KITCHEN LOCATED AT APT 2, 1st STORY, 1st APARTMENT FROM SOUTH AT WEST | Apr 25, 2025 |
| Apr 2, 2009 | A | Apt 3FL · § 27-2005 ADMIN. CODE: REFIT WEST WINDOW IN THE KITCHEN LOCATED AT APT 3FL, 3rd STORY | Jul 6, 2009 |
| Apr 2, 2009 | B | Apt 3FL · § 27-2005 ADMIN. CODE: REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN UNIFORM COLOR CEILING IN THE KITCHEN LOCATED AT APT 3FL, 3rd STORY | May 7, 2009 |
| Apr 2, 2009 | B | Apt 3FL · § 27-2005 ADMIN. CODE: REPAIR THE ROOF SO THAT IT WILL NOT LEAK OVER CEILING IN THE KITCHEN LOCATED AT APT 3FL, 3rd STORY | May 7, 2009 |
| Apr 2, 2009 | B | Apt 3FL · § 27-2005 HMC:TRACE AND REPAIR THE SOURCE AND ABATE THE NUISANCE CONSISTING OF MOLD ... AT CEILING AND WEST WALL IN THE KITCHEN LOCATED AT APT 3FL, 3rd STORY | May 7, 2009 |
| Apr 2, 2009 | B | § 27-2005 ADMIN. CODE: REPAIR THE ROOF SO THAT IT WILL NOT LEAK OVER CEILING AT PUBLIC HALL, 3rd STORY | May 7, 2009 |
| Jul 3, 2006 | B | Apt 2 · § 27-2026 ADMIN. CODE: REPAIR THE LEAKY AND/OR DEFECTIVE FAUCETS AT SINK IN THE KITCHEN LOCATED AT APT 2, 2nd STORY | Aug 19, 2006 |
| Jul 3, 2006 | B | § 27-2010, 2011, 2012 ADM CODE CLEANSE AND DISINFECT TO THE SATISFACTION OF THIS DEPARTMENT AFTER REMOVING THE FECAL MATTER AT CELLAR | Aug 19, 2006 |
| Jul 3, 2006 | C | § 27-2005 ADMIN. CODE: ABATE THE NUISANCE CONSISTING OF NO ELECTRICITY AT CELLAR | Jul 21, 2006 |
| Jul 3, 2006 | B | Apt 2 · § 27-2005 ADMIN. CODE: REPLACE WITH NEW THE MISSING RADIATOR SHUTFOFF HANDLE IN THE 1st BEDROOM FROM NORTH LOCATED AT APT 2, 2nd STORY | Aug 19, 2006 |
| Jul 3, 2006 | B | Apt 2FL · § 27-2005 ADMIN. CODE: REPLACE WITH NEW THE BROKEN OR DEFECTIVE AIR VALVE AT STEAM RISER IN THE BATHROOM LOCATED AT APT 2FL, 2nd STORY | Aug 19, 2006 |
| Jul 3, 2006 | C | Apt 2FL · § 27-2031 ADMIN. CODE: PROVIDE HOT WATER AT ALL HOT WATER FIXTURES AT BATHROOM AND IN THE KITCHEN LOCATED AT APT 2FL, 2nd STORY | Jul 21, 2006 |
| Jul 3, 2006 | B | § 27-2005 ADM CODE & 309 M/D LAW ABATE THE NUISANCE CONSISTING OF NO LIGHTS AT CELLAR | Aug 19, 2006 |
| Jul 3, 2006 | C | § 27-2005 ADMIN. CODE: REPAIR THE ROOF SO THAT IT WILL NOT LEAK OVER KITCHEN BATHROOM, FRONT ROOM AND PRIVATE HALL 2ND STY. APT. 2 | Jul 21, 2006 |
| Jul 3, 2006 | B | Apt 2FL · § 27-2026 ADMIN. CODE: REPAIR THE LEAKY AND/OR DEFECTIVE FAUCETS WASHBASIN IN THE BATHROOM LOCATED AT APT 2FL, 2nd STORY | Aug 19, 2006 |
| Jul 3, 2006 | C | § 27-2005 ADMIN. CODE: REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN UNIFORM COLOR CEILING BATHROOM 2ND STY APT. 2 | Jul 21, 2006 |
| Jul 3, 2006 | A | § 27-2005 ADMIN. CODE: PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CERAMIC TILES AND SUB FLOORING AT TUB BATHROOM 2ND STY. APT. 2 | Oct 18, 2006 |
| Jul 3, 2006 | B | Apt 2 · § 27-2026 ADMIN. CODE: REPAIR THE LEAKY AND/OR DEFECTIVE FAUCETS AT SINK IN THE KITCHEN LOCATED AT APT 2, 2nd STORY | Aug 19, 2006 |
| Jul 3, 2006 | B | Apt 2 · § 27-2005 ADMIN. CODE: PROPERLY REPAIR THE BROKEN OR DEFECTIVE DOORBELL IN THE ENTRANCE LOCATED AT APT 2, 2nd STORY | Aug 19, 2006 |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Nov 12, 2026, 7:13 PM ET. BBL 3016010046.