6 floors · 54 apartments · 51,000 sq ft · built 1940 · class D1 · owner of record: 415 Realty Llc
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 47 days | Keep the report on file (not filed with DOB) |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 47 days | Annual |
| Annual boiler inspection (1 boiler) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2024-03-08 (Accepted). Agency page | Dec 31, 2026 in 47 days | 1 of 1 without an accepted 2026 report yet |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 63 days | Annual |
| Energy and water benchmarking Likely applies Local Law 84 · May 1 each year What this isBuildings over 25,000 sq ft (this lot shows 51,000 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page | May 1, 2027 in 168 days | Annual filing |
| Building emissions report Likely applies Local Law 97 · May 1 each year (extensions available) What this isCovered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page | May 1, 2027 in 168 days | Annual filing |
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Sep 1, 2027 in 291 days | Registered through 2027-09-01 |
| Gas piping inspection (2027 cycle) Likely applies Local Law 152 · During 2027 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 14 is on the 2027 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2027 in 412 days | Next cycle year 2027 |
| Energy audit and retro-commissioning (2029) Likely applies Local Law 87 · Calendar year 2029 What this isBuildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 5159). Agency page | Dec 31, 2029 in 1143 days | Next due 2029 |
None open.
| Issued | Violation | Status |
|---|---|---|
| Nov 10, 2020 | ELEVATOR #9028/690835 | DOB VIOLATION - ACTIVE |
| Dec 14, 1998 | ELEVATOR 3P1717 #9011/301093 | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Jan 31, 2025 | Gas Piping - LL152 FTF-PL-PER Cycle 1, Sub-cycle D (premises is in Community District 14) | Active |
| Issued | Class | Violation | Correct by |
|---|---|---|---|
| Feb 12, 2026 | B | Apt A6 · § 27-2045(B)(1)(B) HMC, § 12-06, § 12-07, § 12-09 RCNY REPAIR, REPLACE OR PROVIDE AN APPROVED AND OPERATIONAL CARBON MONOXIDE DETECTING DEVICE, INSTALLED IN ACCORDANCE WITH APPLICABLE LAW AND RULES MISSING IN THE ENTIRE APARTMENT LOCATED AT APT A6, 1st STORY, 3rd APARTMENT FROM SOUTH AT WEST | Mar 19, 2026 |
| Feb 12, 2026 | B | Apt A6 · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD FLOOR TILES, IN THE 3rd ROOM FROM EAST AT SOUTH LOCATED AT APT A6, 1st STORY, 3rd APARTMENT FROM SOUTH AT WEST | Mar 19, 2026 |
| Feb 12, 2026 | B | Apt A6 · § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... LESS THAN 30 SQUARE FEET AT NORTH, SOUTH ,WEST WALLS AND , WINDOW STILE, IN THE BATHROOM LOCATED AT APT A6, 1st STORY, 3rd APARTMENT FROM SOUTH AT WEST | Mar 19, 2026 |
| Feb 12, 2026 | B | Apt A6 · § 27-2005 ADM CODE & 309 M/D LAW ABATE THE NUISANCE CONSISTING OF KEY OPERATED LOCK INSTALLED AT ENTRANCE DOOR AT ROOM WITH EGRESS WINDOW TO STREET, IN THE 3rd ROOM FROM EAST AT SOUTH LOCATED AT APT A6, 1st STORY, 3rd APARTMENT FROM SOUTH AT WEST | Mar 19, 2026 |
| Feb 12, 2026 | B | Apt A6 · § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT THE CEILING, IN THE BATHROOM LOCATED AT APT A6, 1st STORY, 3rd APARTMENT FROM SOUTH AT WEST | Mar 19, 2026 |
| Feb 12, 2026 | B | Apt A6 · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT THE CEILING, IN THE BATHROOM LOCATED AT APT A6, 1st STORY, 3rd APARTMENT FROM SOUTH AT WEST | Mar 19, 2026 |
| Feb 12, 2026 | B | Apt A6 · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CAUKING AT THE GROUTS JOINTS OF THE CERAMIC TILES AT EAST WALL AROUND BATHTUB IN THE BATHROOM LOCATED AT APT A6, 1st STORY, 3rd APARTMENT FROM SOUTH AT WEST | Mar 19, 2026 |
| Feb 12, 2026 | B | Apt A6 · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD FLOOR TILES, IN THE 3rd ROOM FROM EAST AT NORTH LOCATED AT APT A6, 1st STORY, 3rd APARTMENT FROM SOUTH AT WEST | Mar 19, 2026 |
| Feb 12, 2026 | B | Apt A6 · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD SUB FLOOR IN THE 3rd ROOM FROM EAST AT NORTH LOCATED AT APT A6, 1st STORY, 3rd APARTMENT FROM SOUTH AT WEST | Mar 19, 2026 |
| Feb 12, 2026 | B | Apt A6 · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE PLYWOOD SUB FLOOR IN THE 3rd ROOM FROM EAST AT SOUTH LOCATED AT APT A6, 1st STORY, 3rd APARTMENT FROM SOUTH AT WEST | Mar 19, 2026 |
| Feb 12, 2026 | C | Apt A6 · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT A6, 1st STORY, 3rd APARTMENT FROM SOUTH AT WEST | Mar 10, 2026 |
| Jul 14, 2025 | B | Apt A6 · § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... GREATER THAN 10SQ FEET AT WEST WALL, SOUTH WALL, EAST WALL AND CEILING IN THE BATHROOM LOCATED AT APT A6, 1st STORY, 3rd APARTMENT FROM SOUTH AT WEST | Aug 18, 2025 |
| Jan 22, 2025 | B | Apt E6 · § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... LESS THAN 10 SQ FT AT THE CLOSET FROM NORTH AT EAST WALL IN THE PRIVATE HALLWAY LOCATED AT APT E6, 5th STORY, 4th APARTMENT FROM SOUTH AT WEST ORIGINAL VIOLATION 17294895 ISSUED 23-SEP-24 HAS BEEN UPGRADED TO CLASS | Feb 26, 2025 |
| Jan 22, 2025 | B | Apt E6 · § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... LESS THAN 10 SQ FT AT THE CLOSET FROM NORTH AT EAST WALL IN THE PRIVATE HALLWAY LOCATED AT APT E6, 5th STORY, 4th APARTMENT FROM SOUTH AT WEST ORIGINAL VIOLATION 17294894 ISSUED 23-SEP-24 HAS BEEN UPGRADED TO CLASS | Feb 26, 2025 |
| Nov 17, 2022 | C | Apt A1 · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT A1, 1st STORY, 3rd APARTMENT FROM NORTH AT EAST | Dec 13, 2022 |
| Sep 6, 2022 | B | Apt A1 · § 27-2026 ADM CODE REPAIR THE LEAKY AND/OR DEFECTIVE FAUCETS AT SINK IN THE KITCHEN LOCATED AT APT A1, 1st STORY, 3rd APARTMENT FROM NORTH AT EAST | Oct 11, 2022 |
| Sep 6, 2022 | B | Apt A1 · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE VINYL TILES AT FLOOR IN THE KITCHEN LOCATED AT APT A1, 1st STORY, 3rd APARTMENT FROM NORTH AT EAST | Oct 11, 2022 |
| Sep 6, 2022 | B | Apt A1 · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE MARBLE SADDLE AT DOOR IN THE BATHROOM LOCATED AT APT A1, 1st STORY, 3rd APARTMENT FROM NORTH AT EAST | Oct 11, 2022 |
| Jun 10, 2022 | C | Apt C2 · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT C2, 3rd STORY, 2nd APARTMENT FROM NORTH AT EAST | Jul 6, 2022 |
| Nov 4, 2019 | C | Apt B1 · SECTION 27-2056.7 ADM CODE: Correct failure to provide to the department within 45 days of demand all records required to be maintained by owner pursuant to Local Law 1 of 2004 related to lead-based paint notices, inspections and remediation/abatement activities. | Nov 10, 2019 |
| Oct 4, 2019 | C | Apt C2 · § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... AT CEILING 10 SQ.FT, WEST WALL 10 SQ.FT, SOUTH WALL 10 SQ.FT, AND NORTH WALL 8 SQ.FT IN THE BATHROOM LOCATED AT APT C2, 3rd STORY, 4th APARTMENT FROM NORTH AT EAST | Oct 25, 2019 |
| Jun 4, 2018 | C | Apt C6 · § 27-2043.1 HMC INSTALL THE MISSING OR REPAIR/REPLACE THE DEFECTIVE WINDOW GUARD(S) THROUGHOUT THE PUBLIC AREAS IN ACCORDANCE WITH THE SPECIFICATIONS OF THE NEW YORK CITY HEALTH CODE SECTION 24 RCNY CHAPTER 12. IN THE ENTIRE APARTMENT LOCATED AT APT C6, 3rd STORY, 2nd APARTMENT FROM SOUTH AT WEST , | Jul 2, 2018 |
| May 17, 2006 | C | Apt 3B · SECTION 27-2056.7 ADM CODE -CORRECT FAILURE TO PROVIDE TO THE DEPARTMENT WITHIN 45 DAYS OF DEMAND ALL RECORDS REQUIRED TO BE MAINTAINED BY OWNER | Jun 12, 2006 |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Nov 14, 2026, 6:10 PM ET. BBL 3051590047.