2 floors · 2 apartments · 2,048 sq ft · built 1930 · class S2 · owner of record: David Brown
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 45 days | Keep the report on file (not filed with DOB) |
| Annual property registration Check HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Sep 1, 2027 in 289 days | Required only if the owner doesn't live there |
| Gas piping inspection (2027 cycle) Likely applies Local Law 152 · During 2027 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 17 is on the 2027 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2027 in 410 days | Next cycle year 2027 |
None open.
| Issued | Violation | Status |
|---|---|---|
| Nov 14, 2025 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION #12394 | DOB VIOLATION - ACTIVE |
| Sep 23, 2024 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL LOW PRESSURE INSPECTION #11275 | DOB VIOLATION - ACTIVE |
| Jun 30, 2023 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL LOW PRESSURE INSPECTION #36404 | DOB VIOLATION - ACTIVE |
| Jun 30, 2023 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL LOW PRESSURE INSPECTION #16261 | DOB VIOLATION - ACTIVE |
| Jun 20, 2023 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL LOW PRESSURE INSPECTION #17377 | DOB VIOLATION - ACTIVE |
| Jun 20, 2023 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL LOW PRESSURE INSPECTION #37691 | DOB VIOLATION - ACTIVE |
| Apr 25, 2023 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2022 EXTERNAL LOW PRESSURE INSPECTION #18678 | DOB VIOLATION - ACTIVE |
| Nov 8, 2019 | LOW PRESSURE BOILER VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2017 INSPECTION REPORT #11433 | DOB VIOLATION - ACTIVE |
| Apr 6, 2018 | LOW PRESSURE BOILER VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2016 INSPECTION REPORT #13929 | DOB VIOLATION - ACTIVE |
| Oct 1, 2015 | LOW PRESSURE BOILER VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2014 INSPECTION REPORT #10343 | DOB VIOLATION - ACTIVE |
| Mar 1, 2013 | LOW PRESSURE BOILER VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2011 INSPECTION REPORT #09919 | DOB VIOLATION - ACTIVE |
| Dec 13, 2011 | LOW PRESSURE BOILER VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2010 INSPECTION REPORT #13104 | DOB VIOLATION - ACTIVE |
| Dec 31, 2009 | LOW PRESSURE BOILER #15271 | DOB VIOLATION - ACTIVE |
| Jan 31, 2005 | LOCAL LAW 62/91 - BOILERS #19555 | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Nov 14, 2025 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION | Active |
| Sep 23, 2024 | Boiler LBLVIO Violation Issued-Failure To File 2023 External Low Pressure Inspection Report | Active |
| Jun 30, 2023 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL LOW PRESSURE INSPECTION | Active |
| Jun 30, 2023 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL LOW PRESSURE INSPECTION | Active |
| Jun 20, 2023 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL LOW PRESSURE INSPECTION | Active |
| Jun 20, 2023 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL LOW PRESSURE INSPECTION | Active |
| Apr 25, 2023 | Boiler LBLVIO VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2022 INSPECTION REPORT | Active |
| Nov 8, 2019 | Boiler LBLVIO VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2017 INSPECTION REPORT | Active |
| Apr 6, 2018 | Boiler LBLVIO VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2016 INSPECTION REPORT | Active |
| Oct 1, 2015 | Boiler LBLVIO VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2014 INSPECTION REPORT | Active |
| Mar 1, 2013 | Boiler LBLVIO VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2011 INSPECTION REPORT | Active |
| Dec 13, 2011 | Boiler LBLVIO VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2010 INSPECTION REPORT | Active |
| Dec 31, 2009 | Boiler LBLVIO | Active |
| Jan 31, 2005 | Boiler LL6291 | Active |
| Issued | Class | Violation | Correct by |
|---|---|---|---|
| Dec 18, 2023 | I | §27-2107 ADM CODE OWNER FAILED TO FILE A VALID REGISTRATION STATEMENT WITH THE DEPARTMENT AS REQUIRED BY ADM CODE §27-2097 AND IS THEREFORE SUBJECT TO CIVIL PENALTIES, PROHIBITED FROM CERTIFYING VIOLATIONS, AND DENIED THE RIGHT TO RECOVER POSSESSION OF PREMISES FOR NONPAYMENT OF RENT UNTIL A VALID R | — |
| Jan 2, 2024 | B | Apt 2 · § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... APPROX 15 SQ.FT AT NORTH WALL IN THE 1st ROOM FROM NORTH AT EAST LOCATED AT APT 2, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH | Feb 6, 2024 |
| Jan 2, 2024 | B | Apt 2 · § 27-2005 ADMIN. CODE: REPAIR THE ROOF SO THAT IT WILL NOT LEAK ABOVE CEILING AND WEST WALL IN THE 1st ROOM FROM NORTH AT EAST LOCATED AT APT 2, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH | Feb 6, 2024 |
| Jan 2, 2024 | A | § 27-2005 ADMIN. CODE: REFIT DOOR FRAME AT VESTIBULE AT PUBLIC HALL, 1st STORY | Apr 6, 2024 |
| Jan 2, 2024 | B | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE LOCK AT DOOR AT PUBLIC HALL, 1st STORY | Feb 6, 2024 |
| Jan 2, 2024 | B | Apt 2 · § 27-2005 ADMIN. CODE: REPAIR THE ROOF SO THAT IT WILL NOT LEAK ABOVE CEILING IN THE BATHROOM LOCATED AT APT 2, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH | Feb 6, 2024 |
| Jan 2, 2024 | B | Apt 2 · § 27-2026 ADMIN. CODE: REPAIR THE LEAKY AND/OR DEFECTIVE FAUCETS AT BATHTUB IN THE BATHROOM LOCATED AT APT 2, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH | Feb 6, 2024 |
| Dec 18, 2023 | B | Apt 2 · § 27-2046.1 HMC: REPAIR OR REPLACE THE CARBON MONOXIDE DETECTING DEVICE(S). DEFECTIVE IN THE ENTIRE APARTMENT LOCATED AT APT 2, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH | Jan 22, 2024 |
| Dec 18, 2023 | C | Apt 2 · § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... APPROX 30 SQ.FT AT WEST WALL IN THE 1st ROOM FROM NORTH AT WEST LOCATED AT APT 2, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH | Jan 13, 2024 |
| Dec 18, 2023 | B | § 27-2005 ADMIN. CODE: PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE FIRE RETARDANT MATERIAL AT CEILING AND NORTH AND WEST WALL AT PUBLIC HALL, 2nd STORY | Jan 22, 2024 |
| Dec 18, 2023 | B | Apt 2 · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 2, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH | Jan 22, 2024 |
| Dec 18, 2023 | B | § 27-2005 ADMIN. CODE: REPAIR THE ROOF SO THAT IT WILL NOT LEAK ABOVE CEILING AND WEST WALL AT PUBLIC HALL, 2nd STORY | Jan 22, 2024 |
| Dec 18, 2023 | B | Apt 2 · § 27-2005 ADMIN. CODE: REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN UNIFORM COLOR SOUTH WALL AND CEILING IN THE KITCHEN LOCATED AT APT 2, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH | Jan 22, 2024 |
| Dec 18, 2023 | B | Apt 2 · § 27-2005 ADMIN. CODE: PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOODEN FLOOR IN THE KITCHEN LOCATED AT APT 2, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH | Jan 22, 2024 |
| Dec 18, 2023 | B | Apt 2 · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOODEN FLOOR IN THE PRIVATE HALLWAY LOCATED AT APT 2, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH | Jan 22, 2024 |
| Dec 18, 2023 | B | Apt 2 · § 27-2005 ADMIN. CODE: REPAIR THE ROOF SO THAT IT WILL NOT LEAK ABOVE CEILING AND NORTH AND WEST WALL IN THE 1st ROOM FROM NORTH AT WEST LOCATED AT APT 2, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH | Jan 22, 2024 |
| Dec 18, 2023 | B | Apt 2 · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 2, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH | Jan 22, 2024 |
| Oct 16, 2023 | B | Apt 2 · § 27-2005 ADMIN. CODE: REPAIR THE ROOF SO THAT IT WILL NOT LEAK OVER CEILING IN THE 1st ROOM FROM NORTH AT EAST LOCATED AT APT 2, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH | Nov 20, 2023 |
| Oct 16, 2023 | B | Apt 2 · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 2, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH | Nov 20, 2023 |
| Oct 16, 2023 | B | Apt 2 · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF VERMIN FLIES IN THE ENTIRE APARTMENT LOCATED AT APT 2, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH | Nov 20, 2023 |
| Oct 16, 2023 | B | Apt 2 · § 27-2005 ADMIN. CODE: REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN UNIFORM COLOR AT CEILING IN THE 1st ROOM FROM NORTH AT EAST LOCATED AT APT 2, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH | Nov 20, 2023 |
| Oct 16, 2023 | B | Apt 2 · § 27-2005 ADMIN. CODE: REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN UNIFORM COLOR AT CEILING IN THE BATHROOM LOCATED AT APT 2, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH | Nov 20, 2023 |
| Oct 16, 2023 | B | Apt 2 · § 27-2005 ADMIN. CODE: REPAIR THE ROOF SO THAT IT WILL NOT LEAK OVER CEILING IN THE BATHROOM LOCATED AT APT 2, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH | Nov 20, 2023 |
| Oct 16, 2023 | B | Apt 2 · § 27-2005 ADMIN. CODE: REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN UNIFORM COLOR AT CEILING IN THE KITCHEN LOCATED AT APT 2, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH | Nov 20, 2023 |
| Oct 16, 2023 | B | Apt 2 · § 27-2005 ADMIN. CODE: REPAIR THE ROOF SO THAT IT WILL NOT LEAK OVER CEILING IN THE KITCHEN LOCATED AT APT 2, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH | Nov 20, 2023 |
| Oct 16, 2023 | B | Apt 2 · § 27-2026 ADMIN. CODE: REPLACE THE BROKEN OR DEFECTIVE RADIATOR AT NORTH WALL IN THE KITCHEN LOCATED AT APT 2, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH | Nov 20, 2023 |
| Oct 28, 2019 | B | § 27-2005 ADMIN. CODE: REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN UNIFORM COLOR THE CEILING AND ALL WALLS AT PUBLIC HALL, 2nd STORY | Dec 2, 2019 |
| Oct 28, 2019 | B | § 27-2037, 2038 HMC: PROVIDE A SAFE AND ADEQUATE SUPPLY OF ELECTRIC SERVICE TO THE FIXTURES AT CEILING AT PUBLIC HALL, 1st STORY | Dec 2, 2019 |
| Oct 28, 2019 | B | § 27-2005 ADMIN. CODE: REPAIR THE ROOF SO THAT IT WILL NOT LEAK OVER CEILING TO SOUTH WALL AT PUBLIC HALL, 2nd STORY | Dec 2, 2019 |
| Oct 28, 2019 | A | § 27-2023 ADMIN. CODE: PROVIDE SUFFICIENT,PROPER AND SEPARATE METAL RECEPTACLES FOR THE DEPOSIT OF GARBAGE, RUBBISH AND OTHER WASTE MATERIAL AND ARRANGE FOR COLLECTION AND DISPOSAL OF SUCH MATERIAL. | Jan 31, 2020 |
| Oct 28, 2019 | B | Apt 2R · § 27-2005 ADMIN. CODE: PROPERLY REPAIR THE BROKEN OR DEFECTIVE BELL AND BUZZER INTERCOM SYSTEM FROM BUILDING FRONT TO ENTIRE APARTMENT LOCATED AT APT 2R, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH | Dec 2, 2019 |
| Oct 28, 2019 | B | Apt 2R · § 27-2005 ADMIN. CODE: PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE SLOPING WOOD FLOOR IN THE PRIVATE HALLWAY LOCATED AT APT 2R, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH | Dec 2, 2019 |
| Nov 13, 2018 | B | § 27-2005 ADMIN. CODE: REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN UNIFORM COLOR CEILING AT VESTIBULE 1ST STORY AT PUBLIC HALL | Dec 18, 2018 |
| Nov 13, 2018 | B | § 27-2005 ADMIN. CODE: REPAIR THE ROOF SO THAT IT WILL NOT LEAK OVER CEILING AT 2ND STORY AT PUBLIC HALL | Dec 18, 2018 |
| Nov 13, 2018 | B | § 27-2005 ADMIN. CODE: REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN UNIFORM COLOR CEILING AT 2ND STORY AT PUBLIC HALL | Dec 18, 2018 |
| Nov 13, 2018 | B | Apt 2 · § 27-2018 ADMIN. CODE: ABATE THE NUISANCE CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 2, 2nd STORY | Dec 18, 2018 |
| Nov 13, 2018 | B | Apt 2 · § 27-2018 ADMIN. CODE: ABATE THE NUISANCE CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 2, 2nd STORY | Dec 18, 2018 |
| Nov 13, 2018 | B | § 27-2038 ADMIN CODE: PROVIDE ADEQUATE LIGHTING FOR 60 WATTS MINIMUM AT PUBLIC HALL, 1st STORY | Dec 18, 2018 |
| Apr 2, 2018 | B | Apt 2 · § 27-2018 ADMIN. CODE: ABATE THE NUISANCE CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 2, 1st STORY, 1st APARTMENT FROM WEST AT NORTH | May 7, 2018 |
| Apr 2, 2018 | B | Apt 2 · § 27-2046.1 HMC: REPAIR OR REPLACE THE CARBON MONOXIDE DETECTING DEVICE(S). DEFECTIVE IN THE ENTIRE APARTMENT LOCATED AT APT 2, 1st STORY, 1st APARTMENT FROM WEST AT NORTH | May 7, 2018 |
| Jan 16, 2018 | B | Apt 2 · § 27-2005 ADMIN. CODE: REPLACE WITH NEW THE BROKEN OR DEFECTIVE GASKET AT REFRIGERATOR DOOR IN THE KITCHEN LOCATED AT APT 2, 2nd STORY | Feb 20, 2018 |
| Jan 16, 2018 | B | § 27-2005 ADMIN. CODE: PROPERLY SECURE THE LOOSE HAND RAIL AT STAIR AT PUBLIC HALL, 1st STORY | Feb 20, 2018 |
| Jan 16, 2018 | B | § 27-2005 ADMIN. CODE: PROPERLY REPAIR THE BROKEN OR DEFECTIVE CEILING LIGHT FIXTURE AT PUBLIC HALL, 1st STORY | Feb 20, 2018 |
| Jan 16, 2018 | B | § 27-2005 ADMIN. CODE: REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN UNIFORM COLOR CEILING AT PUBLIC HALL, 2nd STORY | Feb 20, 2018 |
| Jan 16, 2018 | B | Apt 2 · § 27-2046.1 HMC: REPAIR OR REPLACE THE CARBON MONOXIDE DETECTING DEVICE(S). MISSING IN THE ENTIRE APARTMENT LOCATED AT APT 2, 2nd STORY | Feb 20, 2018 |
| Jan 16, 2018 | A | Apt 2 · § 27-2005 ADMIN. CODE: REFIT DOOR IN THE ENTRANCE LOCATED AT APT 2, 2nd STORY | Apr 21, 2018 |
| Jan 16, 2018 | B | § 27-2038 ADMIN CODE: PROVIDE ADEQUATE LIGHTING FOR 60 WATTS MINIMUM AT PUBLIC HALL, 1st STORY | Feb 20, 2018 |
| Jan 16, 2018 | B | Apt 2 · § 27-2005 ADMIN. CODE: PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD FLOOR IN THE KITCHEN LOCATED AT APT 2, 2nd STORY | Feb 20, 2018 |
| Jan 16, 2018 | B | Apt 2 · § 27-2018 ADMIN. CODE: ABATE THE NUISANCE CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 2, 2nd STORY | Feb 20, 2018 |
| Jan 16, 2018 | B | Apt 2 · § 27-2018 ADMIN. CODE: ABATE THE NUISANCE CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 2, 2nd STORY | Feb 20, 2018 |
| Jan 16, 2018 | B | § 27-2005 ADMIN. CODE: REPAIR THE ROOF SO THAT IT WILL NOT LEAK OVER CEILING AT PUBLIC HALL, 2nd STORY | Feb 20, 2018 |
| Nov 27, 2017 | B | Apt 2FL · § 27-2046.1, 2046.2 HMC: PROVIDE AN APPROVED AND OPERATIONAL CARBON MONOXIDE DETECTING DEVICE, INSTALLED IN ACCORDANCE WITH APPLICABLE LAW AND RULES. IN THE ENTIRE APARTMENT LOCATED AT APT 2FL, 2nd STORY | Jan 1, 2018 |
| Nov 27, 2017 | B | § 27-2038 ADMIN CODE: PROVIDE ADEQUATE LIGHTING FOR 60 WATT IINCADESCENT AT PUBLIC HALL, 1st STORY | Jan 1, 2018 |
| Nov 27, 2017 | B | § 27-2005 ADMIN. CODE: PROPERLY SECURE THE LOOSE NEWEL POST AT PUBLIC HALL STAIRS, 1st STORY | Jan 1, 2018 |
| Nov 27, 2017 | B | § 27-2005 ADMIN. CODE: REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN UNIFORM COLOR THE CEILING AT PUBLIC HALL, 2nd STORY | Jan 1, 2018 |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Nov 16, 2026, 8:23 AM ET. BBL 3048780036.