2 floors · 3 apartments · 2,137 sq ft · built 2003 · class C0 · owner of record: Tli Home Inc
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 67 days | Keep the report on file (not filed with DOB) |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 67 days | Annual |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 83 days | Annual |
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Overdue | No current registration found |
| Gas piping inspection (2027 cycle) Likely applies Local Law 152 · During 2027 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 12 is on the 2027 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2027 in 432 days | Next cycle year 2027 |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Apr 12, 2017 | Construction CLASS - 1 FAILURE TO BLDG IN CODE COMPLIANT MANNER. NOTED: AT EXP#1 CONSTRUCTION FENCE IS MISSING A 4FT X 8FT SECTION OF PLYWOOD,ALLOWING PUBLIC ACCESS & CREATING A HAZARD TO THE PUBLIC. REMEDY: REPAIR &/OR REPLACE. #35235683M | Jun 2, 2017 DEFAULT | $0 |
| Feb 14, 2017 | Construction CLASS - 1 FAILURE TO MAINTAIN BLDG IN CODE-COMPLIANT MANNER;NOTED:AT EXPO#1,CONSTRUCTION FENCE IS IN DISREPAIR,A 4FT.X 8FT.PIECE OF PLYWOOD IS MISSINGALLOWING PUBLIC ACCESS AND CREATING A HAZARD.REM:REPAIR AND/OR REPLACE #35225804K | Apr 7, 2017 DEFAULT | $0 |
| Dec 29, 2016 | Construction CLASS - 2 FAILURE TO COMPLY W/THE COMM'S ORDER CONTAINED IN NOV #35074046P ISSUED ON 09/17/16 & TO FILE A C OF C PURSUANT TO 28-201.1;28-204.4 & 1RCNY102-01. REMEDY: COMPLY W/COMM'S ORDER &/OR FILE A C OF C. #35187538M | Feb 17, 2017 DEFAULT | $0 |
| Sep 17, 2016 | Construction CLASS - 1 SEC. 28-301.1 FAILURE TO MAINTAIN BLDG IN A CODE COMPLIANT MANNER. NOTED: AT EXP#1 & 2 CONSTRUCTION PLYWOOD FENCE IN DISREPAIR SECTION OF PLYWOOD MISSING CREATING AN OPEJING APPROX 4'-0 X 6'-0 ALLOWING THE PUBL #35074046P | Nov 4, 2016 DEFAULT | $0 |
| Sep 17, 2016 | Construction CLASS - 1 WORK W/O A PERMIT EXPIRED PERMIT. NOTED CONST FENCE ERECTED & IS IN DISREPAIR SECTION OF THE PLYWOOD FENCE MISSING AT FRONT OF PROPERTY APPROX 4'-0 X 6'-0 CREATING AN OPENING FOR THE PUBLIC(HAZ)CONDITION. #35074045N | Nov 4, 2016 DEFAULT | $0 |
| Apr 29, 2010 | Construction CLASS - 3 WORK W/O A PERMIT APPROX 8FT HIGH PLYWOOD CONSTRUCTION FENCE ERECTED.REM:OBTAIN PERMIT #34850621P | Jun 18, 2010 WRITTEN OFF | $0 |
| Apr 29, 2010 | Construction CLASS - 2 FAILURE TO SAFEGUARD ALL PERSONS & PROPERTY AFFECTED BY CONSTRUCTION OPERATIONS.APPROX 8'FT HIGH CONSTRUCTION FENCE HAS FALLEN @ THE NORTH SECTION OF THE SITE.ALLOWING UNAUTHORIZED PERSON INTO THE ABANDON CONST #34850620N | Jun 18, 2010 WRITTEN OFF | $0 |
| Aug 14, 2003 | Construction Non-Hazardous FAILURE TO PROTECT PUBLIC & PROPERTY. AFFECTED BY CONSTRUCTION OPERATIONS. AT TIME OF INSPECTION METAL FRAMING (FLOORING) @ FIRST FLOOR WAS IN PROGRESS AND CONSTRUCTION SITE FENCE WAS NOT IN PLACE ON THE RIGHT #34406533Y | Oct 3, 2003 WRITTEN OFF | $0 |
| Issued | Violation | Status |
|---|---|---|
| Jul 12, 2017 | FAIL TO CERTIFY CLASS 1 FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION #00261 | DOB VIOLATION - ACTIVE |
| May 17, 2017 | FAIL TO CERTIFY CLASS 1 FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION #00149 | DOB VIOLATION - ACTIVE |
| Dec 14, 2016 | FAIL TO CERTIFY CLASS 1 FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION #00221 | DOB VIOLATION - ACTIVE |
| Dec 14, 2016 | FAIL TO CERTIFY CLASS 1 FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION #00222 | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Jan 31, 2025 | Gas Piping - LL152 FTF-PL-PER Cycle 1, Sub-cycle D (premises is in Community District 12) | Active |
| Jul 12, 2017 | AEUHAZ FTC-AEU-HAZ | Active |
| May 17, 2017 | AEUHAZ FTC-AEU-HAZ | Active |
| Dec 14, 2016 | AEUHAZ FTC-AEU-HAZ | Active |
| Dec 14, 2016 | AEUHAZ FTC-AEU-HAZ | Active |
None open.
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Oct 25, 2026, 10:14 PM ET. BBL 2050040045.