Manhattan · Block 909 · Lot 54 · 10016

411 3 Avenue

3 floors · 5,109 sq ft · built 1925 · class K2 · owner of record: 411 Third Avenue Corp

7open violations
$9,130ECB/OATH penalties owed
0HPD class C (immediately hazardous)
65dto Gas piping inspection (2026 cycle)

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Gas piping inspection (2026 cycle) Likely applies
Local Law 152 · During 2026
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 6 is on the 2026 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2026
in 65 days
Due this year
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 65 days
Keep the report on file (not filed with DOB)

Open violations

ECB / OATH (4) · $9,130 owed
IssuedViolationHearingBalance
Jul 23, 2020Construction CLASS - 2
PEDESTRIAN PROTECTION DOES NOT MEET CODE SPECIFICATION.NOTE AT TIME OF INSPECTION,I OBSERVED SIDE WALK SHED IN PLACE WITH LIGHTING NOT IN OPERATING CONDITION SUN RISE 5:45AM.REM:COMPLY WITH CODE-PROVIDE LIGHTIN
#35481126N
Oct 1, 2020
DEFAULT
$9,130
Jun 10, 2020Construction CLASS - 1
SEC. 3314.1 FAILURE TO MAINTAIN SUPPORTED PIPE SCAFFOLD. NOTE: AT TIMEOF MY OBSERVED THE SUPPORTED PIPE SCAFFOLD INSTALLED ON SIDEWALK PLATFORM GAP MORE THAN 2"INCH WAS NOT FILLING & SCAFFOLD PLATFORM & BLDG
#35491273M
Dec 3, 2020
DEFAULT
$0
Jun 10, 2020Unknown CLASS - 2
SCAFFOLD TRAINING CERTIFICATE CARD NOT READILY AVAILABLE FOR INSPECTION. NOTE: AT TIME OF MY INSPECTION OBSERVED PIPE SCAFFOLD INSTALLED ON SIDEWALK SHED & WORKERS WAS WORKING ON SCAFFOLD W/O TRAINING CERTIFICA
#35491272K
Jan 14, 2021
IN VIOLATION
$0
Apr 20, 2012Construction CLASS - 2
FAILURE TO MAINTAIN BLDG. NOTED: AT SOUTH SIDE OF BLDG ROOF LEVEL MOUNTED ALONGSIDE OF BLDG ALUMINUM FRAMING APPROX 10 X 20 RESTING ALONG ADJOINING ROOF. REMEDY: REMOVE ALL STORAGE FROM ROOF.
#34941696N
Jun 7, 2012
IN VIOLATION
$0
DOB (1)
IssuedViolationStatus
Sep 2, 2020FAIL TO CERTIFY CLASS 1
FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
#00526
DOB VIOLATION - ACTIVE
DOB NOW Safety (2)
IssuedViolationStatus
Oct 31, 2025Gas Piping - LL152 FTF-PL-PER
Cycle 1, Sub-cycle C (premises is in Community District 6)
Active
Sep 2, 2020AEUHAZ FTC-AEU-HAZ
Active
HPD (0)

None open.

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Oct 27, 2026, 5:39 PM ET. BBL 1009090054.

Look up another building