Brooklyn · Block 7725 · Lot 40 · 11210

4102 Glenwood Road

2 floors · 9,725 sq ft · built 1960 · class E9 · owner of record: Lucky Mcmxcvi Llc

5open violations
$0ECB/OATH penalties owed
0HPD class C (immediately hazardous)
415dto Gas piping inspection (2027 cycle)

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 50 days
Keep the report on file (not filed with DOB)
Gas piping inspection (2027 cycle) Likely applies
Local Law 152 · During 2027
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 17 is on the 2027 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2027
in 415 days
Next cycle year 2027
Annual boiler inspection (1 boiler) Applies
Boiler inspection · By December 31 each year
What this is

Boilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-03-09 (Accepted). Agency page

On file2026 reports accepted

Open violations

ECB / OATH (1)
IssuedViolationHearingBalance
Feb 20, 1996Construction Non-Hazardous
FAILURE TO MAINTAIN EXTERIOR BUILDING WALL. DEFECT IS HOIZONTAL AND VERTICAL CRAKS AT EAST WALL NORTH SECTION. REMEDY: REPAIR DEFECTIVE MASONRY WALL.
#34135554L
May 13, 1996
WRITTEN OFF
$0
DOB (3)
IssuedViolationStatus
Feb 10, 1996CONSTRUCTION

#ST09L(4116)
VIOLATION WORK WITHOUT PERMIT - ACTIVE
Feb 10, 1996CONSTRUCTION

#ST10L
DOB VIOLATION - ACTIVE
Feb 8, 1996CONSTRUCTION

#ST011
VIOLATION WORK WITHOUT PERMIT - ACTIVE
DOB NOW Safety (1)
IssuedViolationStatus
Jan 31, 2025Gas Piping - LL152 FTF-PL-PER
Cycle 1, Sub-cycle D (premises is in Community District 17)
Active
HPD (0)

None open.

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Nov 11, 2026, 3:25 AM ET. BBL 3077250040.

Look up another building