Queens · Block 5045 · Lot 1 · 11355

41-61 Kissena Boulevard

2 floors · 363,663 sq ft · built 1973 · class O5 · owner of record: Flushing Plaza Commercial Llc

5open violations
$3,750ECB/OATH penalties owed
0HPD class C (immediately hazardous)
46dto Annual boiler inspection (1 boiler)

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 46 days
Keep the report on file (not filed with DOB)
Annual boiler inspection (1 boiler) Applies
Boiler inspection · By December 31 each year
What this is

Boilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2024-05-22 (Accepted). Agency page

Dec 31, 2026
in 46 days
1 of 1 without an accepted 2026 report yet
Energy and water benchmarking Likely applies
Local Law 84 · May 1 each year
What this is

Buildings over 25,000 sq ft (this lot shows 363,663 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page

May 1, 2027
in 167 days
Annual filing
Building emissions report Likely applies
Local Law 97 · May 1 each year (extensions available)
What this is

Covered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page

May 1, 2027
in 167 days
Annual filing
Gas piping inspection (2029 cycle) Likely applies
Local Law 152 · During 2029
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 7 is on the 2029 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2029
in 1142 days
Next cycle year 2029
Energy audit and retro-commissioning (2035) Likely applies
Local Law 87 · Calendar year 2035
What this is

Buildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 5045). Agency page

Dec 31, 2035
in 3333 days
Next due 2035

Open violations

ECB / OATH (2) · $3,750 owed
IssuedViolationHearingBalance
May 22, 2026Unknown CLASS - 1
FAILURE TO MAINTAIN PARKING STRUCTURE IN SAFE CONDITION AS NOTED. AT TIME OF INSPECTION ON AN ACTIVEPS CONSISTING OF 3 LEVELS UNDER GRADE LEVEL OBSERVED DAMAGED, DETERIORATED, CRACKED AND LOOSE MATERIALS AND CO
#35726944H
Jan 15, 2027
$2,500
May 21, 2026Unknown CLASS - 2
ATOI OBSERVED TWO SPLIT A/C UNITS INSTALLED WITHIN THE GROUND FLOOR COMMERCIAL SPACE (DUNKIN' DONUTS), INCLUDING ASSOCIATED ELECTRICAL CONNECTIONS. WORK APPEARS 100% COMPLETE. NO PERMIT FOUND IN DOB RECORDS. VI
#39189489J
Jan 15, 2027
PENDING
$1,250
DOB (1)
IssuedViolationStatus
Dec 23, 2025CONSTRUCTION
EMERGENCY WORK ORDER OCCUPIED PARKING STRUCTURE,3 LVLS BELOW 2 STORIES CRACKED,SPALLED CONCRETE,EXPOSED REBARS, CRACKED CONCRETE WALL,RUSTED CORROSION DEFLECTED SHEET METAL OF CEILING VAR LOC,SPALLED CEILING METAL. REMEDY: OWNER TO RETAIN NYS RDP TO DIRECT,SUPERVISE INSTALLATIO OF SAFE MEAS. IMPLEME
#LL0701NI
DOB VIOLATION - ACTIVE
DOB NOW Safety (3)
IssuedViolationStatus
Oct 11, 2024Elevators FTC-VT-PER-CO
Violation Issued-Failure To File 2023 Periodic Inspection Affirmation of Correction
Active
Oct 11, 2024Elevators FTC-VT-PER-CO
Violation Issued-Failure To File 2023 Periodic Inspection Affirmation of Correction
Active
Oct 11, 2024Elevators FTC-VT-PER-CO
Violation Issued-Failure To File 2023 Periodic Inspection Affirmation of Correction
Active
HPD (0)

None open.

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Nov 15, 2026, 8:56 AM ET. BBL 4050450001.

Look up another building