1 floors · built 1989 · class Z9 · owner of record: Smarton Developmentco, Ltd
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 65 days | Keep the report on file (not filed with DOB) |
| Gas piping inspection (2029 cycle) Likely applies Local Law 152 · During 2029 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 7 is on the 2029 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2029 in 1161 days | Next cycle year 2029 |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Aug 19, 2008 | Construction CLASS - 2 FAILURE TO MAINTAIN BUILDING WALLS OR APPURTENANCES. AT FRONT 8' HIGH WOOD CONSTRUCTION FENCE IS DEFECTIVE WITH NAILS STICKING OUT IN VARIOUS LOCATIONS AND AD SIGN POSTED. EXISTING PLYWOOD FENCE IS DETERIORATIN #34696904M | Oct 14, 2008 IN VIOLATION | $0 |
None open.
None open.
None open.
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Oct 27, 2026, 11:57 AM ET. BBL 4050630022.