2 floors · 1 apartments · 2,200 sq ft · built 1920 · class K4 · owner of record: Pdj Union Properties, Llc
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 66 days | Keep the report on file (not filed with DOB) |
| Annual property registration Check HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Sep 1, 2027 in 310 days | Required only if the owner doesn't live there |
| Gas piping inspection (2029 cycle) Likely applies Local Law 152 · During 2029 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 7 is on the 2029 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2029 in 1162 days | Next cycle year 2029 |
| Annual boiler inspection (1 boiler) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-05-13 (Accepted). Agency page | On file | 2026 reports accepted |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Jun 16, 2006 | Boilers Non-Hazardous 19B/32A/36/38/50A/50E/50B/50F/50C/BQ9/50D PEERLESS L.P. BOILERS 50A EXPOSED WOOD IN CEILING. 50B EXP WOOD IN WALL. 50C WOOD DOORS ON BOILER RM. 50D PIPE SAFETY VALUE DISC DOWN TO A SAFE POINT. #32050132X | Jun 19, 2007 IN VIOLATION | $0 |
| Sep 27, 2005 | Construction Non-Hazardous OCCUPANCY CONTRARY TO THAT ALLOWED BY THE BUILDING DEPT RECORD. ALT 1 DISAPPROVED #400351061 - 8/6/93 STATES CONVERSION OF 2 FAMILY DWELLING TO V.G6 OCCUPANCY AT 1ST & 2ND FLR. FOUND 1ST FLR CLEANERS/TAILORSHOP #34495732Y | May 30, 2006 IN VIOLATION | $0 |
| Sep 2, 2005 | Boilers Non-Hazardous CEASE USE/HAZARDOUS. BQ9/51/50A/50B/36/38. BQ9-PEERLESS LOW PRESSURE BOILER GAS INSTALLED W/O A PERMIT. BOILER ROOM CREATED W/O A PERMIT. 50A-SINGLE WALL EXHAUST PIPE FROM BOILER AND HOT WATER HEATER IN DIRECT #32046972R | Mar 14, 2006 IN VIOLATION | $0 |
| Sep 6, 2000 | Construction Non-Hazardous WORK W/O A PERMIT. WORK NOTED:ERECTED EXTENSION APPROX. 8X20X9 AT 2ND FL. REAR OF PREMISES. REMEDY:OBTAIN PERMIT IF FEASIBLE OR RESTORE PREMISES TO PRIOR LEGAL CONDITIONS.REMEDY:OBTAIN PERMIT IF FEASIBLE OR RES #34241459M | Oct 24, 2000 WRITTEN OFF | $0 |
| Issued | Violation | Status |
|---|---|---|
| Sep 6, 2000 | CONSTRUCTION #407AC03 | VIOLATION WORK WITHOUT PERMIT - ACTIVE |
| May 5, 2000 | CONSTRUCTION #07JM09 | VIOLATION WORK WITHOUT PERMIT - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Dec 15, 2025 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2024 External Inspection Affirmation of Correction for LP Device | Active |
| Sep 18, 2025 | Gas Piping - LL152 FTF-PL-PER Cycle 1, Sub-cycle B (premises is in Community District 7) | Active |
| Oct 25, 2024 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2023 External Inspection Affirmation of Correction for LP Device | Active |
None open.
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Oct 26, 2026, 9:06 PM ET. BBL 4050460001.