5 floors · 4 apartments · 5,354 sq ft · built 2015 · class S4 · owner of record: 4115 Haight St Inc.
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Overdue | Registration expired 2026-09-01 |
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 65 days | Keep the report on file (not filed with DOB) |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 65 days | Annual |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 81 days | Annual |
| Gas piping inspection (2029 cycle) Likely applies Local Law 152 · During 2029 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 7 is on the 2029 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2029 in 1161 days | Next cycle year 2029 |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Dec 31, 2024 | Construction CLASS - 1 WORK DOES NOT CONFORM TO APPROVED CONSTRUCTION DOCUMENTS/AMENDMENTS. NOTED: AT CELLAR, FIRST AND SECOND FLOOR REAR HAVING INSTALLED A MECHANICAL LIFT CREATED SHAFT FOR LIFT. AT CELLAR FLOOR FLOOR REAR CREATED F #35684383Y | Feb 2, 2026 IN VIOLATION | $2,500 |
| Dec 31, 2024 | Construction CLASS - 1 WORK WITHOUT PERMIT. WORK NOTED ON CELLAR, FIRST AND SECOND FLOOR REARHAVING INSTALLED A MECHANICAL LIFT. ON 1ST AND 2ND FLOOR REAR CREATED PENETRATIONS IN CONCRETE SLAB AND DECLINING FOR MECHANICAL LIFT SHAFT #35684381K | Feb 2, 2026 IN VIOLATION | $2,500 |
| Dec 31, 2024 | Construction CLASS - 1 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. USE OF PROHIBITED HARDWARE PER BC 1008.1(2014 CODE); 27-371; B. C. 1008.1.9(2014 CODE); BC 1010.8(2022 CODE); BC 1010.1.0(2022 CODE). NOTED AT 1ST FLOOR RE #35684382M | Feb 2, 2026 IN VIOLATION | $1,250 |
| Oct 24, 2024 | Construction CLASS - 1 REMOVED OR DEFACED A WRITTEN POSTED VACATE ORDER.NOTED:AT THE TIME OF INSPECTION A WRITTEN POSTED VACATE ORDER HAS BEEN REMOVED FROM THE PREMISES(FRONT DOOR),VACATE ORDER#Q137/2024 ISSUED ON 03/01/2024,IT WAS P #35681586K | Dec 31, 2024 IN VIOLATION | $2,500 |
| Oct 24, 2024 | Construction CLASS - 1 FAILURE TO OBEY A VACATE ORDER FROM THE COMMISSIONER PER 28.207.4:NOTED:AT THE REAR FIRST FLOOR UNIT HAS BEEN REOCCUPIED AND FAILURE TO OBEYVACATE ORDER#Q137/2024 ISSUED ON 03/01/2024.REM:COMPLY WITH VACATE ORD #35681587M | Dec 31, 2024 IN VIOLATION | $4,800 |
None open.
None open.
None open.
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Oct 27, 2026, 8:01 PM ET. BBL 4050630051.