Queens · Block 465 · Lot 100 · 11101

41-01 10 Street

6 floors · 492 apartments · 353,000 sq ft · built 1939 · class D7 · owner of record: Nyc Housing Authority

70open violations
$0ECB/OATH penalties owed
0HPD class C (immediately hazardous)
Overdueto Annual property registration

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 66 days
Keep the report on file (not filed with DOB)
Bedbug annual filing Applies
Local Law 69 · December 1 to 31 each year
What this is

Owners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page

Dec 31, 2026
in 66 days
Annual
Annual notice: window guards and lead paint Applies
HPD / Health Code · January 1 to 16 each year
What this is

Deliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page

Jan 16, 2027
in 82 days
Annual
Energy and water benchmarking Likely applies
Local Law 84 · May 1 each year
What this is

Buildings over 25,000 sq ft (this lot shows 353,000 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page

May 1, 2027
in 187 days
Annual filing
Building emissions report Likely applies
Local Law 97 · May 1 each year (extensions available)
What this is

Covered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page

May 1, 2027
in 187 days
Annual filing
Annual property registration Applies
HPD registration · September 1 each year
What this is

Residential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page

OverdueNo current registration found
Gas piping inspection (2028 cycle) Likely applies
Local Law 152 · During 2028
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 1 is on the 2028 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2028
in 797 days
Next cycle year 2028
Energy audit and retro-commissioning (2035) Likely applies
Local Law 87 · Calendar year 2035
What this is

Buildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 465). Agency page

Dec 31, 2035
in 3353 days
Next due 2035
Annual boiler inspection (3 boilers) Applies
Boiler inspection · By December 31 each year
What this is

Boilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-02-05 (Accepted). Agency page

On file2026 reports accepted

Open violations

ECB / OATH (3)
IssuedViolationHearingBalance
Feb 4, 2019Construction CLASS - 2
REISSUE # 35331648R DATE OF ISSUE 5/22/18.FAILURE TO MAINTAIN BUILDINGIN CODE COMPLIANT MANNER. FLEXIBLE CONNECTOR USED IN KITCHEN AREA TO CONNECT COMMERCIAL GRADE STOVE WITHOUT CASTERS TO THE GAS SUPPLY SYSTE
#35381212L
Apr 30, 2019
POP/IN-VIO
$0
May 22, 2018Construction CLASS - 2
FAILURE TO MAINTAIN BLDG IN CODE-COMPLIANT MANNER.NOTED:FLEXIBLE CONNECTOR USED IN KITCHEN AREA TO CONNECT COMMERCIAL GRADE STOVE W/OUT CASTERS,TO THE GAS SUPPLE SYSTEM.(FGC 411.1 & 411.1.3).REM:COMPLY W/CODE.
#35331648R
Aug 28, 2018
POP/IN-VIO
$0
Apr 26, 2018Construction CLASS - 2
FAILURE TO COMPLY W/COMMISSIONER'S ORDER CONTAINED IN SUMMONS/VIOLATION #35311951L ISSUED ON 01/25/18 AND TO FILE A CERTIFICATE OF CORRECTION PURSUANT TO 28-201.1 AND 14CNY 102-01. FOR A FLEXIBLE GAS SUPPLY HAV
#35337000L
Jun 19, 2018
POP/IN-VIO
$0
DOB (19)
IssuedViolationStatus
May 1, 2024RETAINING WALL
FAILED TO FILE CYCLE 1 TECHNICAL REPORT BY 12/31/2018 PER RCNY 103-09
#00092
DOB VIOLATION - ACTIVE
May 1, 2024RETAINING WALL
FAILED TO FILE CYCLE 1 TECHNICAL REPORT BY 12/31/2018 PER RCNY 103-09
#00148
DOB VIOLATION - ACTIVE
May 1, 2024RETAINING WALL
FAILED TO FILE CYCLE 1 TECHNICAL REPORT BY 12/31/2018 PER RCNY 103-09
#00149
DOB VIOLATION - ACTIVE
May 1, 2024RETAINING WALL
FAILED TO FILE CYCLE 1 TECHNICAL REPORT BY 12/31/2018 PER RCNY 103-09
#00087
DOB VIOLATION - ACTIVE
May 1, 2024RETAINING WALL
FAILED TO FILE CYCLE 1 TECHNICAL REPORT BY 12/31/2018 PER RCNY 103-09
#00088
DOB VIOLATION - ACTIVE
May 1, 2024RETAINING WALL
FAILED TO FILE CYCLE 1 TECHNICAL REPORT BY 12/31/2018 PER RCNY 103-09
#00089
DOB VIOLATION - ACTIVE
May 1, 2024RETAINING WALL
FAILED TO FILE CYCLE 1 TECHNICAL REPORT BY 12/31/2018 PER RCNY 103-09
#00090
DOB VIOLATION - ACTIVE
May 1, 2024RETAINING WALL
FAILED TO FILE CYCLE 1 TECHNICAL REPORT BY 12/31/2018 PER RCNY 103-09
#00091
DOB VIOLATION - ACTIVE
May 1, 2024RETAINING WALL
FAILED TO FILE CYCLE 1 TECHNICAL REPORT BY 12/31/2018 PER RCNY 103-09
#00093
DOB VIOLATION - ACTIVE
May 1, 2024RETAINING WALL
FAILED TO FILE CYCLE 1 TECHNICAL REPORT BY 12/31/2018 PER RCNY 103-09
#00094
DOB VIOLATION - ACTIVE
May 1, 2024RETAINING WALL
FAILED TO FILE CYCLE 1 TECHNICAL REPORT BY 12/31/2018 PER RCNY 103-09
#00095
DOB VIOLATION - ACTIVE
May 1, 2024RETAINING WALL
FAILED TO FILE CYCLE 1 TECHNICAL REPORT BY 12/31/2018 PER RCNY 103-09
#00142
DOB VIOLATION - ACTIVE
May 1, 2024RETAINING WALL
FAILED TO FILE CYCLE 1 TECHNICAL REPORT BY 12/31/2018 PER RCNY 103-09
#00143
DOB VIOLATION - ACTIVE
May 1, 2024RETAINING WALL
FAILED TO FILE CYCLE 1 TECHNICAL REPORT BY 12/31/2018 PER RCNY 103-09
#00144
DOB VIOLATION - ACTIVE
May 1, 2024RETAINING WALL
FAILED TO FILE CYCLE 1 TECHNICAL REPORT BY 12/31/2018 PER RCNY 103-09
#00145
DOB VIOLATION - ACTIVE
May 1, 2024RETAINING WALL
FAILED TO FILE CYCLE 1 TECHNICAL REPORT BY 12/31/2018 PER RCNY 103-09
#00146
DOB VIOLATION - ACTIVE
May 1, 2024RETAINING WALL
FAILED TO FILE CYCLE 1 TECHNICAL REPORT BY 12/31/2018 PER RCNY 103-09
#00147
DOB VIOLATION - ACTIVE
May 31, 1990PUBLIC ASSEMBLY

#01AP04
DOB VIOLATION - ACTIVE
May 31, 1990PUBLIC ASSEMBLY

#01AP03
DOB VIOLATION - ACTIVE
DOB NOW Safety (43)
IssuedViolationStatus
Oct 2, 2026Elevators FTF-VT-PER-CO
Violation Issued-Failure To File 2025 Periodic Inspection Report
Active
Oct 2, 2026Elevators FTF-VT-PER-CO
Violation Issued-Failure To File 2025 Periodic Inspection Report
Active
Jan 8, 2026Gas Piping - LL152 FTF-PL-PER
Cycle 2, Sub-cycle A (premises is in Community District 1)
Active
Jan 8, 2026Gas Piping - LL152 FTF-PL-PER
Cycle 2, Sub-cycle A (premises is in Community District 1)
Active
Jan 8, 2026Gas Piping - LL152 FTF-PL-PER
Cycle 2, Sub-cycle A (premises is in Community District 1)
Active
Oct 10, 2025Elevators FTC-VT-PER-CO
Violation Issued-Failure To File 2024 Periodic Inspection Affirmation of Correction
Active
Oct 10, 2025Elevators FTC-VT-PER-CO
Violation Issued-Failure To File 2024 Periodic Inspection Affirmation of Correction
Active
Oct 10, 2025Elevators FTC-VT-PER-CO
Violation Issued-Failure To File 2024 Periodic Inspection Affirmation of Correction
Active
Oct 10, 2025Elevators FTC-VT-PER-CO
Violation Issued-Failure To File 2024 Periodic Inspection Affirmation of Correction
Active
Oct 10, 2025Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2024 Cat1 Test Affirmation of Correction
Active
Oct 10, 2025Elevators FTC-VT-PER-CO
Violation Issued-Failure To File 2024 Periodic Inspection Affirmation of Correction
Active
Aug 29, 2025Elevators FTF-VT-PER-CO
Violation Issued-Failure To File 2024 Periodic Inspection Report
Active
Aug 29, 2025Elevators FTF-VT-CAT1-CO
Violation Issued-Failure To File 2024 Cat1 Test Report
Active
Aug 29, 2025Elevators FTF-VT-PER-CO
Violation Issued-Failure To File 2024 Periodic Inspection Report
Active
Aug 29, 2025Elevators FTF-VT-CAT1-CO
Violation Issued-Failure To File 2024 Cat1 Test Report
Active
Aug 29, 2025Elevators FTF-VT-CAT1-CO
Violation Issued-Failure To File 2024 Cat1 Test Report
Active
Aug 29, 2025Elevators FTF-VT-PER-CO
Violation Issued-Failure To File 2024 Periodic Inspection Report
Active
Oct 11, 2024Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2023 Cat1 Test Affirmation of Correction
Active
Oct 11, 2024Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2023 Cat1 Test Affirmation of Correction
Active
Oct 11, 2024Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2023 Cat1 Test Affirmation of Correction
Active
Oct 11, 2024Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2023 Cat1 Test Affirmation of Correction
Active
Oct 11, 2024Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2023 Cat1 Test Affirmation of Correction
Active
Sep 11, 2024Elevators FTF-VT-PER-CO
Violation Issued-Failure To File 2023 Periodic Inspection Report
Active
Sep 11, 2024Elevators FTF-VT-PER-CO
Violation Issued-Failure To File 2023 Periodic Inspection Report
Active
Sep 11, 2024Elevators FTF-VT-PER-CO
Violation Issued-Failure To File 2023 Periodic Inspection Report
Active
Sep 11, 2024Elevators FTF-VT-PER-CO
Violation Issued-Failure To File 2023 Periodic Inspection Report
Active
May 1, 2024Retaining Walls FTF-RW-INITL
Active
May 1, 2024Retaining Walls FTF-RW-INITL
Active
May 1, 2024Retaining Walls FTF-RW-INITL
Active
May 1, 2024Retaining Walls FTF-RW-INITL
Active
May 1, 2024Retaining Walls FTF-RW-INITL
Active
May 1, 2024Retaining Walls FTF-RW-INITL
Active
May 1, 2024Retaining Walls FTF-RW-INITL
Active
May 1, 2024Retaining Walls FTF-RW-INITL
Active
May 1, 2024Retaining Walls FTF-RW-INITL
Active
May 1, 2024Retaining Walls FTF-RW-INITL
Active
May 1, 2024Retaining Walls FTF-RW-INITL
Active
May 1, 2024Retaining Walls FTF-RW-INITL
Active
May 1, 2024Retaining Walls FTF-RW-INITL
Active
May 1, 2024Retaining Walls FTF-RW-INITL
Active
May 1, 2024Retaining Walls FTF-RW-INITL
Active
May 1, 2024Retaining Walls FTF-RW-INITL
Active
May 1, 2024Retaining Walls FTF-RW-INITL
Active
HPD (5) · C 0 · B 3 · A 2
IssuedClassViolationCorrect by
May 16, 2016A§ 329, M/D LAW AND DEPT. RULES AND REGS. PROVIDE A COMPLETED CERTIFICATE OF INSPECTION VISITS IN A PROPER FRAME AT OR NEAR MAILBOXES, BOTTOM EDGE OF FRAME BETWEEN 48-62 INCHES ABOVE FLOOR FRAME MISSING AT PUBLIC HALL, 1st STORYAug 19, 2016
May 16, 2016A§ 27-2104 ADM CODE POST AND MAINTAIN A PROPER SIGN ON WALL OF ENTRANCE STORY SHOWING THE REGISTRATION NUMBER ASSIGNED BY THE DEPARTMENT AND THE ADDRESS OF THE BUILDING. AT PUBLIC HALL, 1st STORYAug 19, 2016
Oct 21, 2010BApt 6B · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR WALLS IN THE ENTIRE APARTMENT LOCATED AT APT 6B, 6th STORYNov 25, 2010
Oct 21, 2010B§ 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE MAIL-BOX AT FRONT AREAWAY, 1st STORYNov 25, 2010
Oct 21, 2010BApt 6B · § 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE DOOR IN THE ENTRANCE LOCATED AT APT 6B, 6th STORYNov 25, 2010

Issued in the last 120 days

DateSourceWhatNow
Oct 2, 2026DOB SafetyElevators: Violation Issued-Failure To File 2025 Periodic Inspection ReportOpen
Oct 2, 2026DOB SafetyElevators: Violation Issued-Failure To File 2025 Periodic Inspection ReportOpen

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Oct 26, 2026, 5:24 AM ET. BBL 4004650100.

Look up another building