2 floors · 4 apartments · 3,198 sq ft · built 1930 · class C3 · owner of record: Ashman, Christopher
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 45 days | Keep the report on file (not filed with DOB) |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 45 days | Annual |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 61 days | Annual |
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Sep 1, 2027 in 289 days | Registered through 2027-09-01 |
| Gas piping inspection (2027 cycle) Likely applies Local Law 152 · During 2027 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 17 is on the 2027 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2027 in 410 days | Next cycle year 2027 |
None open.
| Issued | Violation | Status |
|---|---|---|
| Nov 22, 2011 | BOILER #305610 | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Jan 31, 2025 | Gas Piping - LL152 FTF-PL-PER Cycle 1, Sub-cycle D (premises is in Community District 17) | Active |
| Jan 31, 2025 | Gas Piping - LL152 FTF-PL-PER Cycle 1, Sub-cycle D (premises is in Community District 17) | Active |
| Issued | Class | Violation | Correct by |
|---|---|---|---|
| Sep 22, 2025 | C | Apt 2R · § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE - USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) NORTH WALL IN THE 4th ROOM FROM NORTH AT EAST LOCATED AT APT 2R, 2nd STORY, 1st APARTM | Oct 16, 2025 |
| Sep 22, 2025 | C | Apt 2R · § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE - USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) 1st WALL CABINET FROM NORTH AT EAST WALL IN THE KITCHEN LOCATED AT APT 2R, 2nd STORY, | Oct 16, 2025 |
| Jul 23, 2025 | C | Apt 2R · § 27-2056.7, 27-2056.8, 27-2056.9 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY PERFORMING ACTIVITIES NECESSARY TO ABATE TESTED LEAD-BASED PAINT FROM REQUIRED WINDOW AND/OR DOOR FRICTION SURFACES FOR APARTMENT AND MAKE FLOORS SMOOTH A | Aug 30, 2025 |
| Jul 22, 2025 | C | Apt 2R · § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE - USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) 1st DOOR FRAME FROM SOUTH AT WEST WALL, NORTH WALL IN THE 4th ROOM FROM NORTH AT EAST | Aug 29, 2025 |
| Jul 22, 2025 | C | Apt 2R · § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD-PAINT THAT IS XRF TESTED INCONCLUSIVE FOR LEAD CONTENT AT 0.5MG/CM2 AND IS PRESUMED LEAD PAINT AS SET FORTH IN (28 RCNY §11-07(b)) AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE-USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(b)(2) EAS | Aug 29, 2025 |
| Jul 22, 2025 | C | Apt 2R · § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE - USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) NORTH WALL, SOUTH WALL, EAST WALL, WEST WALL IN THE 4th ROOM FROM NORTH AT WEST LOCATE | Aug 29, 2025 |
| Jul 22, 2025 | C | Apt 2R · § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE - USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) 1st CLOSET FROM NORTH AT EAST WALL DOOR, 1st CLOSET FROM NORTH AT EAST WALL DOOR FRAME | Aug 29, 2025 |
| Jul 22, 2025 | C | Apt 2R · § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE - USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) 1st DOOR FROM NORTH AT EAST WALL, 1st DOOR FRAME FROM NORTH AT EAST WALL, SOUTH WALL, | Aug 29, 2025 |
| Nov 7, 2024 | C | Apt 2F · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 2F, 2nd STORY, 1st APARTMENT FROM SOUTH AT WEST | Dec 3, 2024 |
| Nov 4, 2024 | C | Apt 1R · § 27-2056.7, 27-2056.8, 27-2056.9 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY PERFORMING ACTIVITIES NECESSARY TO ABATE PRESUMED LEAD PAINT THAT IS XRF TESTED INCONCLUSIVE AT 0.5 MG/CM2 (28 RCNY §11-07(B)) FROM REQUIRED WINDOW AND/O | Nov 28, 2024 |
| Dec 29, 2023 | B | Apt 2F · § 27-2046.1 HMC: REPAIR OR REPLACE THE CARBON MONOXIDE DETECTING DEVICE(S). DEFECTIVE IN THE ENTIRE APARTMENT LOCATED AT APT 2F, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST | Feb 2, 2024 |
| Dec 29, 2023 | B | Apt 2F · § 27-2037, 2038 HMC: PROVIDE A SAFE AND ADEQUATE SUPPLY OF ELECTRIC SERVICE TO THE FIXTURES NO OUTLET ON WALLS IN THE KITCHEN LOCATED AT APT 2F, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST | Feb 2, 2024 |
| Dec 29, 2023 | B | Apt 2F · § 27-2045 ADM CODE REPAIR OR REPLACE THE SMOKE DETECTOR DEFECTIVE IN THE ENTIRE APARTMENT LOCATED AT APT 2F, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST | Feb 2, 2024 |
| Jan 23, 2023 | C | Apt 2F · § 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE LOCKING DEVICE AT DOOR IN THE ENTRANCE LOCATED AT APT 2F, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST | Jan 29, 2023 |
| Jan 23, 2023 | B | Apt 2F · § 27-2005 ADM CODE REPLACE WITH NEW THE BROKEN OR DEFECTIVE CERAMIC FLOOR TILES IN THE KITCHEN LOCATED AT APT 2F, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST | Feb 27, 2023 |
| Jan 23, 2023 | B | Apt 2F · § 27-2005 ADM CODE REPLACE WITH NEW THE BROKEN OR DEFECTIVE CERAMIC FLOOR TILES IN THE BATHROOM LOCATED AT APT 2F, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST | Feb 27, 2023 |
| Date | Source | What | Now |
|---|---|---|---|
| Jul 20, 2026 | HPD C | § 27-2033 ADM CODE POST NOTICE, IN FORM APPROVED BY THE DEPARTMENT, STATING THE NAME AND LOCATION OF THE PERSON DESIGNATED BY THE OWNER TO HAVE KEY TO BUILDINGS HEATING SYSTEM MISSING AT PUBLIC HALL | Closed |
| Jul 20, 2026 | HPD A | § 329, M/D LAW AND DEPT. RULES AND REGS. PROVIDE A COMPLETED CERTIFICATE OF INSPECTION VISITS IN A PROPER FRAME AT OR NEAR MAILBOXES, BOTTOM EDGE OF FRAME BETWEEN 48-62 INCHES ABOVE FLOOR MISSING AT PUBLIC HALL | Closed |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Nov 16, 2026, 10:54 AM ET. BBL 3046700067.