Brooklyn · Block 5283 · Lot 28 · 11218

404 Greenwood Avenue

3 floors · 3 apartments · 2,556 sq ft · built 1899 · class C0 · owner of record: Munoz, Frank

6open violations
$11,250ECB/OATH penalties owed
0HPD class C (immediately hazardous)
44dto Bedbug annual filing

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 44 days
Keep the report on file (not filed with DOB)
Bedbug annual filing Applies
Local Law 69 · December 1 to 31 each year
What this is

Owners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page

Dec 31, 2026
in 44 days
Annual
Annual notice: window guards and lead paint Applies
HPD / Health Code · January 1 to 16 each year
What this is

Deliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page

Jan 16, 2027
in 60 days
Annual
Annual property registration Applies
HPD registration · September 1 each year
What this is

Residential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page

Sep 1, 2027
in 288 days
Registered through 2027-09-01
Gas piping inspection (2029 cycle) Likely applies
Local Law 152 · During 2029
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 7 is on the 2029 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2029
in 1140 days
Next cycle year 2029

Open violations

ECB / OATH (3) · $11,250 owed
IssuedViolationHearingBalance
Sep 22, 2026Construction CLASS - 1
UNLAWFUL ACTS. FAILURE TO COMPLY WITH COMMISSIONER'S ORDER TO OBTAIN PERMITS FOR DOB VIO# 101225CCER03RA. APPLICATION #B01401245-SI-ST IS IN OBJECTIONS STATUS AND, B0140124I1-PMM IS APPROVED. NO PERMITS ON FILE
#39205116Y
Dec 2, 2026
PENDING
$2,500
Sep 22, 2026Construction CLASS - 1
FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER. NOTED: 3 STORY BUILDING IS LEANING TO ONE SIDE AND BULDGING AT EXP2. PREVIOUS VIO # 39163456H ISSUED FOR SAME CONDITIONS., REPAIR AND/REPLACE
#39205115M
Dec 2, 2026
PENDING
$6,250
Oct 12, 2025Construction CLASS - 1
AT TIME OF INSPECTION OBSERVED BUILDING TO BE OUT OF PLUMB FROM 1ST TO 3RD FLOOR LEVELS. ENTRANCE AND FOYER DOORFRAMES INDICATE MOVEMENT. FACADE BETWEEN EXP.1 AND 2 HAS GAP AT CORNER. INTERIOR PUBLIC HALL WALL
#39163456H
Jan 7, 2027
PENDING
$2,500
DOB (1)
IssuedViolationStatus
Oct 12, 2025CONSTRUCTION
OBSERVED BUILDINGS SLIGHTLY LEANING, DOOR FRAMES INDICATED LEANING, JA MED, INTERIOR PUBLIC HALL BULGING, CORNER EXPOSURE 1 & 2 FACADE HAVE CRACKS FROM 2ND FLOOR THRU 3RD FLOOR OWNER TO HIRE HIRE NYSPE TO SUMIT REPORT TO ENGINEER TO ERTINSPECTIONS @BUILDINGS.NYC.GOV W/IN 10 DAYS ADDRESSING ALL CONDI
#CER03RA
DOB VIOLATION - ACTIVE
DOB NOW Safety (1)
IssuedViolationStatus
Sep 18, 2025Gas Piping - LL152 FTF-PL-PER
Cycle 1, Sub-cycle B (premises is in Community District 7)
Active
HPD (1) · C 0 · B 0 · A 1
IssuedClassViolationCorrect by
May 4, 2026A(A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPDS WEBSITE, WWW.NYC.GOV\HPD, SEARCH BED BUGS.Aug 7, 2026

Issued in the last 120 days

DateSourceWhatNow
Sep 22, 2026ECBConstruction: UNLAWFUL ACTS. FAILURE TO COMPLY WITH COMMISSIONER'S ORDER TO OBTAIN PERMITS FOR DOB VIO# 101225CCER03RA. APPLICATION #B01401245-SI-ST IS IN OBJECTIONS STATUS AND, B0140124I1-PMM IS APPROVED. NO PERMITS ON FILEOpen
Sep 22, 2026ECBConstruction: FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER. NOTED: 3 STORY BUILDING IS LEANING TO ONE SIDE AND BULDGING AT EXP2. PREVIOUS VIO # 39163456H ISSUED FOR SAME CONDITIONS., REPAIR AND/REPLACEOpen

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Nov 17, 2026, 7:25 PM ET. BBL 3052830028.

Look up another building