7 floors · 25,515 sq ft · built 1896 · class O6 · owner of record: A Trenkmann Est Inc
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 61 days | Keep the report on file (not filed with DOB) |
| Energy and water benchmarking Likely applies Local Law 84 · May 1 each year What this isBuildings over 25,000 sq ft (this lot shows 25,515 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page | May 1, 2027 in 182 days | Annual filing |
| Building emissions report Likely applies Local Law 97 · May 1 each year (extensions available) What this isCovered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page | May 1, 2027 in 182 days | Annual filing |
| Gas piping inspection (2029 cycle) Likely applies Local Law 152 · During 2029 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 2 is on the 2029 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2029 in 1157 days | Next cycle year 2029 |
| Facade inspection report (Cycle 10C) Applies Local Law 11 / FISP · Feb 21, 2027 to Feb 21, 2029 What this isBuildings taller than six stories file a facade inspection report by a QEWI once every five-year cycle. Tax blocks ending in 1, 2 or 3 are in sub-cycle 10C. DOB facade records for this building show $466,000 in late-filing or failure-to-file penalties. Agency page | On file | Cycle 10 filing on record: SWARMP (2026-01-21) |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Apr 2, 2026 | Construction CLASS - 2 FAILURE TO MAINTAIN BUILDING FACADE WALL(S) AND APPURTENANCES. NOTE: AT THE TIME OF INSPECTION I OBSERVED AT EX #2, SOUTH ELEVATION, CRACKEDAND SPALLING STUCCO AT MULTIPLE LOCATIONS. AT EX #4, NORTH ELEVATION, #35729606Z | Jun 18, 2026 IN VIOLATION | $2,500 |
| Apr 8, 2025 | Local Law CLASS - 2 FAILURE TO SUBMIT AN ACCEPTABLE REQUIRED CYCLE 9C REPORT OF CRITICAL EXAMINATION DOCUMENTING CONDITION OF EXTERIOR WALL AND APPURTENANCES REQUIRED BY 28-302.4 FOR CONTROL #900861. REMEDY: SUBMIT ACCEPTABLE REQU #37034542K | Apr 13, 2027 DEFAULT | $10,000 |
| Jan 26, 2015 | Construction CLASS - 1 UNLAWFULLY CONTINUED WORK WHILE ON NOTICE OF A STOP WORK ORDER.NOTED: INTERIOR DEMOLITION OF PARTITIONS AND PLUMBING REMOVAL ON 7TH FLOOR COMPLETED UNDER PERMIT #122204051 CONTINUED/PERFORMED AFTER STOP WORK #35151464Y | Mar 12, 2015 IN VIOLATION | $0 |
| Issued | Violation | Status |
|---|---|---|
| Feb 22, 2024 | NO REPORT AND / OR LATE FILING (FACADE) FAILED TO FILE FISP CYCLE 9C TECHNICAL REPORT BY 2/21/2024 #01582 | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Sep 18, 2025 | Gas Piping - LL152 FTF-PL-PER Cycle 1, Sub-cycle B (premises is in Community District 2) | Active |
| Feb 22, 2024 | Facades FISPNRF FAILED TO FILE FISP CYCLE 9C TECHNICAL REPORT BY 2/21/2024 | Active |
None open.
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Oct 31, 2026, 9:52 PM ET. BBL 1004720012.