Brooklyn · Block 6501 · Lot 18 · 11230

402 Foster Avenue

4 floors · 40 apartments · 29,400 sq ft · built 1928 · class C1 · owner of record: 402 Foster Avenue Llc

32open violations
$2,500ECB/OATH penalties owed
20HPD class C (immediately hazardous)
57dto Bedbug annual filing

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 57 days
Keep the report on file (not filed with DOB)
Bedbug annual filing Applies
Local Law 69 · December 1 to 31 each year
What this is

Owners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page

Dec 31, 2026
in 57 days
Annual
Annual boiler inspection (2 boilers) Applies
Boiler inspection · By December 31 each year
What this is

Boilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-06-08 (Accepted). Agency page

Dec 31, 2026
in 57 days
1 of 2 without an accepted 2026 report yet
Annual notice: window guards and lead paint Applies
HPD / Health Code · January 1 to 16 each year
What this is

Deliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page

Jan 16, 2027
in 73 days
Annual
Energy and water benchmarking Likely applies
Local Law 84 · May 1 each year
What this is

Buildings over 25,000 sq ft (this lot shows 29,400 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page

May 1, 2027
in 178 days
Annual filing
Building emissions report Likely applies
Local Law 97 · May 1 each year (extensions available)
What this is

Covered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page

May 1, 2027
in 178 days
Annual filing
Annual property registration Applies
HPD registration · September 1 each year
What this is

Residential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page

Sep 1, 2027
in 301 days
Registered through 2027-09-01
Gas piping inspection (2027 cycle) Likely applies
Local Law 152 · During 2027
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 14 is on the 2027 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2027
in 422 days
Next cycle year 2027

Open violations

ECB / OATH (1) · $2,500 owed
IssuedViolationHearingBalance
May 12, 2026Construction CLASS - 1
FAILURE TO PROVIDE UNOBSTRUCTED EXIT PASSAGEWAY. AT TIME OF INSPECTION OBSERVED AT EXPOSURE 1(FRONT),2(LEFT) 3(BACK) 2-4 FLOORS, AT FIRE ESCAPE, MULTIPLE AC UNIT IN WINDOW & MISCELLANEOUS HOUSEHOLD ITEMS PARTIA
#39188254K
Mar 2, 2027
$2,500
DOB (0)

None open.

DOB NOW Safety (2)
IssuedViolationStatus
Nov 14, 2023Boiler FTC-BE-EXT-LP
Violation Issued-Failure To File 2018 External Inspection Affirmation of Correction for LP Device
Active
Nov 14, 2023Boiler FTC-BE-EXT-LP
Violation Issued-Failure To File 2019 External Inspection Affirmation of Correction for LP Device
Active
HPD (30) · C 20 · B 10 · A 0
IssuedClassViolationCorrect by
Nov 3, 2021BApt A6 · § 27-2056.7 AND 27-2056.17 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT A6, 1st STORY, 2nd APARTMENT FROM NORTH AT EASTDec 8, 2021
Nov 3, 2021BApt C2 · § 27-2056.7 AND 27-2056.17 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT C2, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION ''NORTH'', 1stDec 8, 2021
Oct 15, 2021CApt B4 · § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE - USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) NORTH WALL IN THE FOYER LOCATED AT APT B4, 2nd STORY, 1st APARTMENT FROM NORTH AT EASTNov 22, 2021
Oct 15, 2021BApt A1 · § 27-2056.7 AND 27-2056.17 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT A1, 1st STORY, 1st APARTMENT FROM SOUTH AT WESTNov 19, 2021
Oct 15, 2021BApt A4 · § 27-2056.7 AND 27-2056.17 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT A4, 1st STORY, 1st APARTMENT FROM EAST AT SOUTH , SECTION ''N'', 1st FRONov 19, 2021
Oct 15, 2021BApt D1 · § 27-2056.7 AND 27-2056.17 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT D1, 4th STORY, 1st APARTMENT FROM SOUTH AT WESTNov 19, 2021
Oct 15, 2021BApt D5 · § 27-2056.7 AND 27-2056.17 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT D5, 4th STORY, 2nd APARTMENT FROM NORTH AT EASTNov 19, 2021
Oct 15, 2021BApt A5 · § 27-2056.7 AND 27-2056.17 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT A5, 1st STORY, 1st APARTMENT FROM NORTH AT EAST , SECTION ''S'', 1st FRONov 19, 2021
Oct 15, 2021BApt B9 · § 27-2056.7 AND 27-2056.17 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT B9, 2nd STORY, 1st APARTMENT FROM SOUTH AT WEST , SECTION ''S'', 1st FRONov 19, 2021
Oct 15, 2021BApt D7 · § 27-2056.7 AND 27-2056.17 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT D7, 4th STORY, 1st APARTMENT FROM NORTH AT EASTNov 19, 2021
Oct 15, 2021BApt B5 · § 27-2056.7 AND 27-2056.17 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT B5, 2nd STORY, 2nd APARTMENT FROM NORTH AT EAST , SECTION ''N'', 1st FRONov 19, 2021
Oct 15, 2021C§ 27-2056.4 ADM CODE- CORRECT FAILURE TO NOTIFY OCCUPANTS AND/OR TO INVESTIGATE LEAD-BASED PAINT HAZARDS.Oct 19, 2021
Oct 15, 2021CApt B4 · § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE - USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) 1st DOOR FROM WEST AT NORTH WALL, 1st DOOR FRAME FROM WEST AT NORTH WALL, SOUTH WALL, Nov 22, 2021
Oct 4, 2021C§ 27-2056.4(H) AND 27-2056.17 ADM CODE -CORRECT FAILURE TO PROVIDE TO THE DEPARTMENT WITHIN 45 DAYS OF DEMAND ALL RECORDS REQUIRED TO BE MAINTAINED BY OWNER PURSUANT TO LOCAL LAW 1 OF 2004 RELATED TO LEAD-BASED PAINT NOTICES, INSPECTIONS AND REMEDIATION/ABATEMENT ACTIVITIES.Oct 8, 2021
Jan 12, 2021CApt C10 · § 27-2056.8 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT ; IN THE ENTIRE APARTMENT LOCATED AT APT C10, 3rd STORY, 1st APARTMENT FROM WEST AT NORTHJan 16, 2021
Sep 2, 2020C§ 27-2056.4 ADM CODE- CORRECT FAILURE TO NOTIFY OCCUPANTS AND/OR TO INVESTIGATE LEAD-BASED PAINT HAZARDS.Sep 6, 2020
Aug 27, 2020CApt B4 · § 27-2056.8 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT ... IN THE ENTIRE APARTMENT LOCATED AT APT B4, 2nd STORY, 1st APARTMENT FROM NORTH AT EASTAug 31, 2020
Aug 27, 2020CApt D7 · § 27-2056.8 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT ... IN THE ENTIRE APARTMENT LOCATED AT APT D7, 4th STORY, 3rd APARTMENT FROM NORTH AT EASTAug 31, 2020
Aug 27, 2020CApt C1 · § 27-2056.8 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT ... IN THE ENTIRE APARTMENT LOCATED AT APT C1, 3rd STORY, 2nd APARTMENT FROM SOUTH AT WESTAug 31, 2020
Aug 27, 2020CApt B7 · § 27-2056.8 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT ... IN THE ENTIRE APARTMENT LOCATED AT APT B7, 2nd STORY, 3rd APARTMENT FROM NORTH AT EASTAug 31, 2020
Aug 27, 2020CApt A1 · § 27-2056.8 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT ... IN THE ENTIRE APARTMENT LOCATED AT APT A1, 1st STORY, 2nd APARTMENT FROM SOUTH AT WESTAug 31, 2020
Aug 27, 2020CApt C2 · § 27-2056.8 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT ... IN THE ENTIRE APARTMENT LOCATED AT APT C2, 3rd STORY, 2nd APARTMENT FROM WEST AT NORTHAug 31, 2020
Aug 27, 2020CApt C6 · § 27-2056.8 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT ... IN THE ENTIRE APARTMENT LOCATED AT APT C6, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTHAug 31, 2020
Aug 27, 2020CApt D1 · § 27-2056.8 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT ... IN THE ENTIRE APARTMENT LOCATED AT APT D1, 4th STORY, 2nd APARTMENT FROM SOUTH AT WESTAug 31, 2020
Aug 27, 2020CApt D3 · § 27-2056.8 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT ... IN THE ENTIRE APARTMENT LOCATED AT APT D3, 4th STORY, 3rd APARTMENT FROM WEST AT NORTHAug 31, 2020
Aug 27, 2020CApt D4 · § 27-2056.8 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT ... IN THE ENTIRE APARTMENT LOCATED AT APT D4, 4th STORY, 1st APARTMENT FROM NORTH AT EASTAug 31, 2020
Aug 27, 2020CApt A3 · § 27-2056.8 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT ... IN THE ENTIRE APARTMENT LOCATED AT APT A3, 1st STORY, 1st APARTMENT FROM NORTH AT EASTAug 31, 2020
Aug 27, 2020CApt B9 · § 27-2056.8 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT ... IN THE ENTIRE APARTMENT LOCATED AT APT B9, 2nd STORY, 1st APARTMENT FROM SOUTH AT WESTAug 31, 2020
Aug 27, 2020CApt D6 · § 27-2056.8 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT ... IN THE ENTIRE APARTMENT LOCATED AT APT D6, 4th STORY, 1st APARTMENT FROM EAST AT SOUTHAug 31, 2020
Aug 5, 2020C§ 27-2056.4(H) AND 27-2056.17 ADM CODE -CORRECT FAILURE TO PROVIDE TO THE DEPARTMENT WITHIN 45 DAYS OF DEMAND ALL RECORDS REQUIRED TO BE MAINTAINED BY OWNER PURSUANT TO LOCAL LAW 1 OF 2004 RELATED TO LEAD-BASED PAINT NOTICES, INSPECTIONS AND REMEDIATION/ABATEMENT ACTIVITIES.Aug 9, 2020

Issued in the last 120 days

DateSourceWhatNow
Jul 9, 2026HPD B§ 27-2005, 2007 ADM CODE REMOVE ALL ENCUMBRANCES CONSISTING OF CONSISTING OF CONSTRUCTION MATERIALS AT PUBLIC HALL, 1st STORYClosed