3 floors · 99,300 sq ft · built 1957 · class W1 · owner of record: Nyc Department Of Education
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Gas piping inspection (2026 cycle) Likely applies Local Law 152 · During 2026 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 9 is on the 2026 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2026 in 46 days | Due this year |
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 46 days | Keep the report on file (not filed with DOB) |
| Energy and water benchmarking Likely applies Local Law 84 · May 1 each year What this isBuildings over 25,000 sq ft (this lot shows 99,300 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page | May 1, 2027 in 167 days | Annual filing |
| Building emissions report Likely applies Local Law 97 · May 1 each year (extensions available) What this isCovered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page | May 1, 2027 in 167 days | Annual filing |
| Energy audit and retro-commissioning (2027) Likely applies Local Law 87 · Calendar year 2027 What this isBuildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 1957). Agency page | Dec 31, 2027 in 411 days | Next due 2027 |
| Annual boiler inspection (2 boilers) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-05-28 (Accepted). Agency page | On file | 2026 reports accepted |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Oct 28, 2026 | Construction CLASS - 1 AT TIME OF INSPECTION OBSERVED ONGOING CONSTRUCTION ACTIVITY, HOWEVER NO AHV PERMIT FOUND ON DOB RECORDS FOR TODAYS DATE 10/28/2006. STOP ALL AHV WORK EXCEPT TO MAKE SITE SAFE., OBTAIN AFTER HOURS VARIANCE #39209827Z | Jan 7, 2027 PENDING | $2,500 |
| Jul 6, 2026 | Construction CLASS - 2 REISSUE#35693477J FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER.1ST FL MAIN ENTRANCE 2ND FL STAIR ARE CAFE ENTRANCE.DOORS NOT SELF CLOSING.REM:COMPLY WITH CODE. #35734480Z | Jul 27, 2026 POP/IN-VIO | $0 |
| Sep 3, 2025 | Construction CLASS - 2 FAILURE TO MAINTAIN BUILDING IN CODE COMLLIANT MANNER.NOTED INTERIOR FPSC DOORS NOT CLOSING PROPERLY AT 2ND FL STAIR A & E.1ST FL STAIR D & E MAIN ENTRANCE INTERIOR SMOKE DOORS & CAFETERIA ENTRANCE DOORS.REM:RE #35693477J | Sep 4, 2025 POP/IN-VIO | $0 |
| Sep 3, 2025 | Construction CLASS - 2 FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER.EXP#2 BRICK RETAINING WALL HAS CHIPPED & BROKEN BRICKS WITH MISSING & LOOSE MORTAR JOINTS.REM:REPAIR AND/OR REPLACE. #35693480K | Sep 4, 2025 POP/IN-VIO | $0 |
None open.
| Issued | Violation | Status |
|---|---|---|
| Dec 15, 2025 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2024 External Inspection Affirmation of Correction for LP Device | Active |
| Dec 15, 2025 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2024 External Inspection Affirmation of Correction for LP Device | Active |
| Oct 25, 2024 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2023 External Inspection Affirmation of Correction for LP Device | Active |
| Oct 25, 2024 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2023 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2020 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2020 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2022 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2018 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2022 External Inspection Affirmation of Correction for LP Device | Active |
None open.
| Date | Source | What | Now |
|---|---|---|---|
| Oct 28, 2026 | ECB | Construction: AT TIME OF INSPECTION OBSERVED ONGOING CONSTRUCTION ACTIVITY, HOWEVER NO AHV PERMIT FOUND ON DOB RECORDS FOR TODAYS DATE 10/28/2006. STOP ALL AHV WORK EXCEPT TO MAKE SITE SAFE., OBTAIN AFTER HOURS VARIANCE | Open |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Nov 15, 2026, 3:22 PM ET. BBL 1019570010.