38 floors · 646 apartments · 846,331 sq ft · built 2016 · class RM · owner of record: Rcb1 Nominee Llc
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 44 days | Keep the report on file (not filed with DOB) |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 44 days | Annual |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 60 days | Annual |
| Energy and water benchmarking Likely applies Local Law 84 · May 1 each year What this isBuildings over 25,000 sq ft (this lot shows 846,331 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page | May 1, 2027 in 165 days | Annual filing |
| Building emissions report Likely applies Local Law 97 · May 1 each year (extensions available) What this isCovered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page | May 1, 2027 in 165 days | Annual filing |
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Sep 1, 2027 in 288 days | Registered through 2027-09-01 |
| Gas piping inspection (2029 cycle) Likely applies Local Law 152 · During 2029 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 7 is on the 2029 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2029 in 1140 days | Next cycle year 2029 |
| Energy audit and retro-commissioning (2031) Likely applies Local Law 87 · Calendar year 2031 What this isBuildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 1171). Agency page | Dec 31, 2031 in 1870 days | Next due 2031 |
| Annual boiler inspection (8 boilers) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-11-03 (Accepted). Agency page | On file | 2026 reports accepted |
| Facade inspection report (Cycle 10C) Applies Local Law 11 / FISP · Feb 21, 2027 to Feb 21, 2029 What this isBuildings taller than six stories file a facade inspection report by a QEWI once every five-year cycle. Tax blocks ending in 1, 2 or 3 are in sub-cycle 10C. DOB facade records for this building show $82,000 in late-filing or failure-to-file penalties. Agency page | On file | Cycle 10 filing on record: UNSAFE (2026-07-27) |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Mar 24, 2026 | Construction CLASS - 1 FAILURE TO MAINTAIN BUILDING, OBSERVED EXTERIOR WINDOW TO RESIDENCE APARTMENT ON 6TH FLOOR WEST 61ST SIDE HAS DISLODGED FROM CURTAIN WALL ALONG WITH FRAME ONTO PATHWAY FOR TENANTS DROP/PICK UP., REPAIR AND/REPL #39181683R | Jan 28, 2027 | $2,500 |
| Issued | Violation | Status |
|---|---|---|
| Mar 24, 2026 | CONSTRUCTION FTM FACADE & APPURTANCES DUE TO INCIDENT ON 3/24/26. CURTAIN WALL GLASS DISLODGED & FELL FROM 6FL. REMEDY:OWNER TO IMMED RETAIN NYS RDP WITH QEWI CERTIFICATION. INSPECT,EVAUATE 100% OF CURTIN WALL FACADE @ ALL EXPS.INSTALL & MAINTAIN PUB PROT ON PERIMERTER OF BLDG.FILE UNSAFE FISP REPORT. REPORT TO #LLFA01EM | DOB VIOLATION - ACTIVE |
| Mar 24, 2026 | CONSTRUCTION EMERGENCY WORK ORDER DUE TO INCIDENT THAT OCCURED ON 3/24/26 WHERE A WALL GLASS DISLODGED AND FELL FROM 6FL ON TO THE PEDESTRIAN PLAZA BELOW. REMEDY: IMMEDIATELY TAKE AND PROVIDE SAFETY MEASURES TO SECURE AND PROTECT THE PUBLIC & INSTALL PUBLIC PROTECTION AT ALL EXPOSURES: NORTH,SOUTH,EAST & WEST ON #LLFA02EM | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Aug 19, 2026 | Facades FTC-FC-UNSAFE Unsafe 10C report filed | Active |
| Nov 14, 2025 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION | Active |
| Oct 10, 2025 | Elevators FTC-VT-PER-CO Violation Issued-Failure To File 2024 Periodic Inspection Affirmation of Correction | Active |
| Oct 10, 2025 | Elevators FTC-VT-PER-CO Violation Issued-Failure To File 2024 Periodic Inspection Affirmation of Correction | Active |
| Oct 10, 2025 | Elevators FTC-VT-PER-CO Violation Issued-Failure To File 2024 Periodic Inspection Affirmation of Correction | Active |
| Oct 10, 2025 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2024 Cat1 Test Affirmation of Correction | Active |
| Oct 10, 2025 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2024 Cat1 Test Affirmation of Correction | Active |
| Oct 10, 2025 | Elevators FTC-VT-PER-CO Violation Issued-Failure To File 2024 Periodic Inspection Affirmation of Correction | Active |
| Issued | Class | Violation | Correct by |
|---|---|---|---|
| Nov 13, 2026 | B | Apt 512 · § 27-2010, 2011, 2012 ADM CODE REMOVE THE ACCUMULATION OF REFUSE AND/OR RUBBISH AND MAINTAIN IN A CLEAN CONDITION THE CLOTHES AND TRASH IN THE ENTIRE APARTMENT LOCATED AT APT 512, 5th STORY, 1st APARTMENT FROM WEST AT NORTH | — |
| Oct 2, 2026 | A | Apt 602 · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE ELECTRIC OUTLET COVER AT WEST WALL IN THE 1st ROOM FROM NORTH LOCATED AT APT 602, 6th STORY, 2nd APARTMENT FROM WEST AT NORTH | Jan 5, 2027 |
| Oct 2, 2026 | A | Apt 602 · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE ELECTRIC OUTLET COVER AT EAST WALL IN THE 1st ROOM FROM NORTH LOCATED AT APT 602, 6th STORY, 2nd APARTMENT FROM WEST AT NORTH | Jan 5, 2027 |
| Oct 2, 2026 | A | Apt 602 · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE ELECTRIC OUTLET AT WEST WALL IN THE 1st ROOM FROM NORTH LOCATED AT APT 602, 6th STORY, 2nd APARTMENT FROM WEST AT NORTH | Jan 5, 2027 |
| Oct 2, 2026 | A | Apt 602 · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE ELECTRIC OUTLET AT EAST WALL IN THE 1st ROOM FROM NORTH LOCATED AT APT 602, 6th STORY, 2nd APARTMENT FROM WEST AT NORTH | Jan 5, 2027 |
| Oct 2, 2026 | A | Apt 602 · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CERAMIC TILES AT WEST WALL IN THE BATHROOM LOCATED AT APT 602, 6th STORY, 2nd APARTMENT FROM WEST AT NORTH | Jan 5, 2027 |
| Date | Source | What | Now |
|---|---|---|---|
| Nov 13, 2026 | HPD B | § 27-2010, 2011, 2012 ADM CODE REMOVE THE ACCUMULATION OF REFUSE AND/OR RUBBISH AND MAINTAIN IN A CLEAN CONDITION THE CLOTHES AND TRASH IN THE ENTIRE APARTMENT LOCATED AT APT 512, 5th STORY, 1st APARTMENT FROM WEST AT NORTH | Open |
| Oct 2, 2026 | HPD A | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE ELECTRIC OUTLET COVER AT WEST WALL IN THE 1st ROOM FROM NORTH LOCATED AT APT 602, 6th STORY, 2nd APARTMENT FROM WEST AT NORTH | Open |
| Oct 2, 2026 | HPD A | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE ELECTRIC OUTLET COVER AT EAST WALL IN THE 1st ROOM FROM NORTH LOCATED AT APT 602, 6th STORY, 2nd APARTMENT FROM WEST AT NORTH | Open |
| Oct 2, 2026 | HPD A | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE ELECTRIC OUTLET AT WEST WALL IN THE 1st ROOM FROM NORTH LOCATED AT APT 602, 6th STORY, 2nd APARTMENT FROM WEST AT NORTH | Open |
| Oct 2, 2026 | HPD A | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE ELECTRIC OUTLET AT EAST WALL IN THE 1st ROOM FROM NORTH LOCATED AT APT 602, 6th STORY, 2nd APARTMENT FROM WEST AT NORTH | Open |
| Oct 2, 2026 | HPD A | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CERAMIC TILES AT WEST WALL IN THE BATHROOM LOCATED AT APT 602, 6th STORY, 2nd APARTMENT FROM WEST AT NORTH | Open |
| Aug 19, 2026 | DOB Safety | Facades: Unsafe 10C report filed | Open |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Nov 17, 2026, 2:26 PM ET. BBL 1011717513.