Manhattan · Block 1171 · Lot 7513 · 10023

400 West 61st Street

38 floors · 646 apartments · 846,331 sq ft · built 2016 · class RM · owner of record: Rcb1 Nominee Llc

16open violations
$2,500ECB/OATH penalties owed
0HPD class C (immediately hazardous)
44dto Bedbug annual filing

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 44 days
Keep the report on file (not filed with DOB)
Bedbug annual filing Applies
Local Law 69 · December 1 to 31 each year
What this is

Owners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page

Dec 31, 2026
in 44 days
Annual
Annual notice: window guards and lead paint Applies
HPD / Health Code · January 1 to 16 each year
What this is

Deliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page

Jan 16, 2027
in 60 days
Annual
Energy and water benchmarking Likely applies
Local Law 84 · May 1 each year
What this is

Buildings over 25,000 sq ft (this lot shows 846,331 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page

May 1, 2027
in 165 days
Annual filing
Building emissions report Likely applies
Local Law 97 · May 1 each year (extensions available)
What this is

Covered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page

May 1, 2027
in 165 days
Annual filing
Annual property registration Applies
HPD registration · September 1 each year
What this is

Residential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page

Sep 1, 2027
in 288 days
Registered through 2027-09-01
Gas piping inspection (2029 cycle) Likely applies
Local Law 152 · During 2029
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 7 is on the 2029 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2029
in 1140 days
Next cycle year 2029
Energy audit and retro-commissioning (2031) Likely applies
Local Law 87 · Calendar year 2031
What this is

Buildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 1171). Agency page

Dec 31, 2031
in 1870 days
Next due 2031
Annual boiler inspection (8 boilers) Applies
Boiler inspection · By December 31 each year
What this is

Boilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-11-03 (Accepted). Agency page

On file2026 reports accepted
Facade inspection report (Cycle 10C) Applies
Local Law 11 / FISP · Feb 21, 2027 to Feb 21, 2029
What this is

Buildings taller than six stories file a facade inspection report by a QEWI once every five-year cycle. Tax blocks ending in 1, 2 or 3 are in sub-cycle 10C. DOB facade records for this building show $82,000 in late-filing or failure-to-file penalties. Agency page

On fileCycle 10 filing on record: UNSAFE (2026-07-27)

Open violations

ECB / OATH (1) · $2,500 owed
IssuedViolationHearingBalance
Mar 24, 2026Construction CLASS - 1
FAILURE TO MAINTAIN BUILDING, OBSERVED EXTERIOR WINDOW TO RESIDENCE APARTMENT ON 6TH FLOOR WEST 61ST SIDE HAS DISLODGED FROM CURTAIN WALL ALONG WITH FRAME ONTO PATHWAY FOR TENANTS DROP/PICK UP., REPAIR AND/REPL
#39181683R
Jan 28, 2027
$2,500
DOB (2)
IssuedViolationStatus
Mar 24, 2026CONSTRUCTION
FTM FACADE & APPURTANCES DUE TO INCIDENT ON 3/24/26. CURTAIN WALL GLASS DISLODGED & FELL FROM 6FL. REMEDY:OWNER TO IMMED RETAIN NYS RDP WITH QEWI CERTIFICATION. INSPECT,EVAUATE 100% OF CURTIN WALL FACADE @ ALL EXPS.INSTALL & MAINTAIN PUB PROT ON PERIMERTER OF BLDG.FILE UNSAFE FISP REPORT. REPORT TO
#LLFA01EM
DOB VIOLATION - ACTIVE
Mar 24, 2026CONSTRUCTION
EMERGENCY WORK ORDER DUE TO INCIDENT THAT OCCURED ON 3/24/26 WHERE A WALL GLASS DISLODGED AND FELL FROM 6FL ON TO THE PEDESTRIAN PLAZA BELOW. REMEDY: IMMEDIATELY TAKE AND PROVIDE SAFETY MEASURES TO SECURE AND PROTECT THE PUBLIC & INSTALL PUBLIC PROTECTION AT ALL EXPOSURES: NORTH,SOUTH,EAST & WEST ON
#LLFA02EM
DOB VIOLATION - ACTIVE
DOB NOW Safety (8)
IssuedViolationStatus
Aug 19, 2026Facades FTC-FC-UNSAFE
Unsafe 10C report filed
Active
Nov 14, 2025Boiler LBLVIO
VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION
Active
Oct 10, 2025Elevators FTC-VT-PER-CO
Violation Issued-Failure To File 2024 Periodic Inspection Affirmation of Correction
Active
Oct 10, 2025Elevators FTC-VT-PER-CO
Violation Issued-Failure To File 2024 Periodic Inspection Affirmation of Correction
Active
Oct 10, 2025Elevators FTC-VT-PER-CO
Violation Issued-Failure To File 2024 Periodic Inspection Affirmation of Correction
Active
Oct 10, 2025Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2024 Cat1 Test Affirmation of Correction
Active
Oct 10, 2025Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2024 Cat1 Test Affirmation of Correction
Active
Oct 10, 2025Elevators FTC-VT-PER-CO
Violation Issued-Failure To File 2024 Periodic Inspection Affirmation of Correction
Active
HPD (6) · C 0 · B 1 · A 5
IssuedClassViolationCorrect by
Nov 13, 2026BApt 512 · § 27-2010, 2011, 2012 ADM CODE REMOVE THE ACCUMULATION OF REFUSE AND/OR RUBBISH AND MAINTAIN IN A CLEAN CONDITION THE CLOTHES AND TRASH IN THE ENTIRE APARTMENT LOCATED AT APT 512, 5th STORY, 1st APARTMENT FROM WEST AT NORTH—
Oct 2, 2026AApt 602 · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE ELECTRIC OUTLET COVER AT WEST WALL IN THE 1st ROOM FROM NORTH LOCATED AT APT 602, 6th STORY, 2nd APARTMENT FROM WEST AT NORTHJan 5, 2027
Oct 2, 2026AApt 602 · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE ELECTRIC OUTLET COVER AT EAST WALL IN THE 1st ROOM FROM NORTH LOCATED AT APT 602, 6th STORY, 2nd APARTMENT FROM WEST AT NORTHJan 5, 2027
Oct 2, 2026AApt 602 · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE ELECTRIC OUTLET AT WEST WALL IN THE 1st ROOM FROM NORTH LOCATED AT APT 602, 6th STORY, 2nd APARTMENT FROM WEST AT NORTHJan 5, 2027
Oct 2, 2026AApt 602 · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE ELECTRIC OUTLET AT EAST WALL IN THE 1st ROOM FROM NORTH LOCATED AT APT 602, 6th STORY, 2nd APARTMENT FROM WEST AT NORTHJan 5, 2027
Oct 2, 2026AApt 602 · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CERAMIC TILES AT WEST WALL IN THE BATHROOM LOCATED AT APT 602, 6th STORY, 2nd APARTMENT FROM WEST AT NORTHJan 5, 2027

Issued in the last 120 days

DateSourceWhatNow
Nov 13, 2026HPD B§ 27-2010, 2011, 2012 ADM CODE REMOVE THE ACCUMULATION OF REFUSE AND/OR RUBBISH AND MAINTAIN IN A CLEAN CONDITION THE CLOTHES AND TRASH IN THE ENTIRE APARTMENT LOCATED AT APT 512, 5th STORY, 1st APARTMENT FROM WEST AT NORTHOpen
Oct 2, 2026HPD A§ 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE ELECTRIC OUTLET COVER AT WEST WALL IN THE 1st ROOM FROM NORTH LOCATED AT APT 602, 6th STORY, 2nd APARTMENT FROM WEST AT NORTHOpen
Oct 2, 2026HPD A§ 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE ELECTRIC OUTLET COVER AT EAST WALL IN THE 1st ROOM FROM NORTH LOCATED AT APT 602, 6th STORY, 2nd APARTMENT FROM WEST AT NORTHOpen
Oct 2, 2026HPD A§ 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE ELECTRIC OUTLET AT WEST WALL IN THE 1st ROOM FROM NORTH LOCATED AT APT 602, 6th STORY, 2nd APARTMENT FROM WEST AT NORTHOpen
Oct 2, 2026HPD A§ 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE ELECTRIC OUTLET AT EAST WALL IN THE 1st ROOM FROM NORTH LOCATED AT APT 602, 6th STORY, 2nd APARTMENT FROM WEST AT NORTHOpen
Oct 2, 2026HPD A§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CERAMIC TILES AT WEST WALL IN THE BATHROOM LOCATED AT APT 602, 6th STORY, 2nd APARTMENT FROM WEST AT NORTHOpen
Aug 19, 2026DOB SafetyFacades: Unsafe 10C report filedOpen

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Nov 17, 2026, 2:26 PM ET. BBL 1011717513.

Look up another building