5 floors · 12 apartments · 11,215 sq ft · built 1913 · class C6 · owner of record: 400 West 14th St Hdfc
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Gas piping inspection (2026 cycle) Likely applies Local Law 152 · During 2026 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 9 is on the 2026 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2026 in 46 days | Due this year |
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 46 days | Keep the report on file (not filed with DOB) |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 46 days | Annual |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 62 days | Annual |
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Sep 1, 2027 in 290 days | Registered through 2027-09-01 |
| Annual boiler inspection (1 boiler) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-09-22 (Accepted). Agency page | On file | 2026 reports accepted |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| May 22, 2010 | Unknown CLASS - 2 WORK W/O A PERMIT WORK NOTED:BLDG HAVING ERECTED WOODEN SHED APPR 5'*10'*9' HIGH ON PUBLIC SIDEWALK & OUTSTANDING FROM SIDEWALK SURFACE METAL DUCTED VENT APPR 1'*2"*3 HIGH.LOCATION-FRONT OF THE BLDG TO THE EAST #34851754N | Jul 15, 2010 STIPULATION/IN-VIO | $0 |
| Issued | Violation | Status |
|---|---|---|
| Oct 16, 2023 | LANDMARK #24-0325 | DOB VIOLATION - ACTIVE |
| Dec 31, 2009 | LOW PRESSURE BOILER #04544 | DOB VIOLATION - ACTIVE |
| Apr 16, 2008 | CONSTRUCTION DUE TO CONST OF 104531231 AN ADJOINING EXCAVATION SITE APPROX 8-12 AT REAR REMOVED SOIL ALSO PARTIAL EXCAVATION AT FRONT AN SIDES NORTH SOUT H INTERIOR OF A LINE APTS HAVE 1/8-3/4 SEPARATION AT FOYERS ALSO CELLAR SLAB SHIFTING 1/2" EXTERIOR HAS VERTICAL CRACK 1/8-1" CELLAR TO ROOF REMEDY: MAKE SAFE #EX0908DP | DOB VIOLATION - ACTIVE |
| Mar 19, 2003 | LOCAL LAW 62/91 - BOILERS #07574 | DOB VIOLATION - ACTIVE |
| May 4, 1998 | LOCAL LAW 62/91 - BOILERS #10196 | DOB VIOLATION - ACTIVE |
| Mar 18, 1993 | LOCAL LAW 62/91 - BOILERS #19637 | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Dec 31, 2009 | Boiler LBLVIO | Active |
| Mar 19, 2003 | Boiler LL6291 | Active |
| May 4, 1998 | Boiler LL6291 | Active |
| Mar 18, 1993 | Boiler LL6291 | Active |
| Issued | Class | Violation | Correct by |
|---|---|---|---|
| May 19, 2026 | C | Apt 2C · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 2C, 2nd STORY, 2nd APARTMENT FROM SOUTH AT WEST | Jun 14, 2026 |
| May 19, 2026 | C | Apt 2C · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 2C, 2nd STORY, 2nd APARTMENT FROM SOUTH AT WEST | Jun 14, 2026 |
| May 19, 2026 | B | Apt 2C · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING IN THE BATHROOM LOCATED AT APT 2C, 2nd STORY, 2nd APARTMENT FROM SOUTH AT WEST | Jun 23, 2026 |
| May 19, 2026 | B | Apt 2C · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE ELECTRICAL LIGHT FIXTURE AT CEILING IN THE BATHROOM LOCATED AT APT 2C, 2nd STORY, 2nd APARTMENT FROM SOUTH AT WEST | Jun 23, 2026 |
| May 19, 2026 | B | Apt 2C · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE THE COUNTERTOP AT SINK IN THE KITCHEN LOCATED AT APT 2C, 2nd STORY, 2nd APARTMENT FROM SOUTH AT WEST | Jun 23, 2026 |
| May 19, 2026 | B | Apt 2C · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE CABINET AT EAST WALL IN THE KITCHEN LOCATED AT APT 2C, 2nd STORY, 2nd APARTMENT FROM SOUTH AT WEST | Jun 23, 2026 |
| Jan 12, 2026 | C | Apt 2C · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CERAMIC FLOOR TILES IN THE 4th ROOM FROM EAST LOCATED AT APT 2C, 2nd STORY, 2nd APARTMENT FROM SOUTH AT WEST | Jan 18, 2026 |
| Jan 12, 2026 | C | Apt 2C · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 2C, 2nd STORY, 2nd APARTMENT FROM SOUTH AT WEST | Feb 7, 2026 |
| Oct 14, 2025 | B | Apt 3B · § 27-2026 ADM CODE REPAIR THE BROKEN OR DEFECTIVE CONNECTION WASTELINE PIPE AT SINK IN THE KITCHEN LOCATED AT APT 3B, 3rd STORY, 1st APARTMENT FROM SOUTH AT WEST | Nov 18, 2025 |
| May 27, 2025 | B | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE MARBLE BASE AT WEST WALL AT PUBLIC HALL, 1st STORY | Jul 1, 2025 |
| May 27, 2025 | A | § 27-2053 ADM CODE POST SIGN ON WALL OF ENTRANCE STORY BEARING NAME, ADDRESS INCLUDING APARTMENT NUMBER IF ANY, AND TELEPHONE NUMBER OF SUPERINTENDENT, JANITOR OR HOUSEKEEPER. | Aug 30, 2025 |
| May 27, 2025 | B | § 27-2005, 2007 ADM CODE AND DEPT. RULES AND REGULATIONS. REMOVE THE ENCUMBRANCE OBSTRUCTING EGRESS FROM FIRE ESCAPES FLOWER POTS AND HOUSEHOLD ITEMS AT 3RD STORY WEST BALCONY AT NORTH EXTERIOR AT FIRE ESCAPE | Jul 1, 2025 |
| Feb 14, 2025 | B | Apt 2C · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE LIGHT FIXTURE AT CEILING IN THE BATHROOM LOCATED AT APT 2C, 2nd STORY, 2nd APARTMENT FROM SOUTH AT WEST | Mar 21, 2025 |
| Feb 14, 2025 | B | Apt 2C · § 27-2037, 2038 HMC: PROVIDE A SAFE AND ADEQUATE SUPPLY OF ELECTRIC SERVICE TO THE FIXTURES AT CEILING IN THE BATHROOM LOCATED AT APT 2C, 2nd STORY, 2nd APARTMENT FROM SOUTH AT WEST | Mar 21, 2025 |
| Feb 13, 2025 | C | Apt 2C · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 2C, 2nd STORY, 2nd APARTMENT FROM SOUTH AT WEST | Mar 11, 2025 |
| Feb 13, 2025 | C | Apt 2C · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 2C, 2nd STORY, 2nd APARTMENT FROM SOUTH AT WEST | Mar 11, 2025 |
| Feb 13, 2025 | B | Apt 2C · § 27-2045 ADM CODE REPAIR OR REPLACE THE SMOKE DETECTOR DEFECTIVE IN THE ENTIRE APARTMENT LOCATED AT APT 2C, 2nd STORY, 2nd APARTMENT FROM SOUTH AT WEST | Mar 20, 2025 |
| Feb 13, 2025 | B | Apt 2C · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE BATHROOM LOCATED AT APT 2C, 2nd STORY, 2nd APARTMENT FROM SOUTH AT WEST | Mar 20, 2025 |
| Feb 13, 2025 | B | Apt 2C · § 27-2046.1 HMC: REPAIR OR REPLACE THE CARBON MONOXIDE DETECTING DEVICE(S). DEFECTIVE IN THE ENTIRE APARTMENT LOCATED AT APT 2C, 2nd STORY, 2nd APARTMENT FROM SOUTH AT WEST | Mar 20, 2025 |
| Feb 13, 2025 | B | Apt 2C · § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE BATHROOM LOCATED AT APT 2C, 2nd STORY, 2nd APARTMENT FROM SOUTH AT WEST | Mar 20, 2025 |
| Sep 20, 2023 | C | § 27-2005, 2007 ADM CODE REMOVE THE ILLEGAL FASTENING LOCKABLE HASP AND CLASP AT BULKHEAD DOOR AT WEST | Sep 26, 2023 |
| Sep 20, 2023 | C | § 27-2005, 2007 ADM CODE REMOVE THE ILLEGAL FASTENING LOCKABLE SLIDE BOLD AT BULKHEAD DOOR AT EAST | Sep 26, 2023 |
| Feb 27, 2023 | B | Apt 3B · § 27-2026 ADM CODE REPAIR THE LEAKY AND/OR DEFECTIVE FAUCETS AT THE BATHTUB IN THE BATHROOM LOCATED AT APT 3B, 3rd STORY, 1st APARTMENT FROM SOUTH AT WEST | Apr 3, 2023 |
| Feb 21, 2023 | B | Apt 3B · § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK THE NORTH WALL IN THE 1st ROOM FROM NORTH AT WEST LOCATED AT APT 3B, 3rd STORY, 1st APARTMENT FROM SOUTH AT WEST | Mar 28, 2023 |
| Feb 21, 2023 | B | Apt 3B · § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK THE NORTH WALL IN THE 1st ROOM FROM NORTH AT EAST LOCATED AT APT 3B, 3rd STORY, 1st APARTMENT FROM SOUTH AT WEST | Mar 28, 2023 |
| Feb 21, 2023 | B | Apt 3B · § 27-2026 ADM CODE REPAIR THE BROKEN OR DEFECTIVE CONNECTION AT WASTELINE UNDER THE WASH BASIN IN THE BATHROOM LOCATED AT APT 3B, 3rd STORY, 1st APARTMENT FROM SOUTH AT WEST | Mar 28, 2023 |
| Feb 21, 2023 | B | Apt 3B · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR NORTH WALL UNDER THE KITCHEN SINK IN THE KITCHEN LOCATED AT APT 3B, 3rd STORY, 1st APARTMENT FROM SOUTH AT WEST | Mar 28, 2023 |
| Oct 14, 2022 | B | Apt 3B · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT NORTH WALL AT SINK IN THE KITCHEN LOCATED AT APT 3B, 3rd STORY, 1st APARTMENT FROM SOUTH AT WEST | Nov 18, 2022 |
| Oct 14, 2022 | B | Apt 3B · § 27-2026 ADM CODE REPAIR THE BROKEN OR DEFECTIVE CONNECTION WASTELINE AT WASH BASIN IN THE BATHROOM LOCATED AT APT 3B, 3rd STORY, 1st APARTMENT FROM SOUTH AT WEST | Nov 18, 2022 |
| Jun 8, 2022 | C | § 27-2005, 27-2007, 27-2041.1 HMC: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE VESTIBULE DOOR AT PUBLIC HALL, 1st STORY | Jul 4, 2022 |
| Jun 8, 2022 | C | § 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE LOCKSET AT VESTIBULE DOOR AT PUBLIC HALL, 1st STORY | Jun 14, 2022 |
| Nov 15, 2021 | B | Apt 3B · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT NORTH WALL IN THE 2nd ROOM FROM NORTH LOCATED AT APT 3B, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH | Jan 19, 2022 |
| Nov 15, 2021 | B | Apt 3B · § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE 2nd ROOM FROM NORTH LOCATED AT APT 3B, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH | Jan 19, 2022 |
| Nov 15, 2021 | B | Apt 3B · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT NORTH WALL IN THE 1st ROOM FROM NORTH LOCATED AT APT 3B, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH | Jan 19, 2022 |
| Nov 15, 2021 | B | Apt 3B · § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE 1st ROOM FROM NORTH LOCATED AT APT 3B, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH | Jan 19, 2022 |
| Nov 30, 2020 | B | § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... at ceiling AT PUBLIC HALL, 1st STORY ORIGINAL VIOLATION 13688680 ISSUED 29-JUL-20 HAS BEEN UPGRADED TO CLASS B PER ADMINISTRATIVE CODE ''''27-2017.3a(3)(a) or (b). | Jan 4, 2021 |
| Aug 12, 2020 | B | § 27-2005, 2007 ADM CODE FIRE EGRESS DEFECTIVE. REMOVE THE OBSTRUCTION IN FIREPROOF PASSAGEWAY LOCKBLE PAD LOCK WITH A CHAIN AT FIRE ESCAPE, 1st STORY | Sep 16, 2020 |
| Jul 31, 2020 | C | § 27-2033 ADM CODE POST NOTICE, IN FORM APPROVED BY THE DEPARTMENT, STATING THE NAME AND LOCATION OF THE PERSON DESIGNATED BY THE OWNER TO HAVE KEY TO BUILDINGS HEATING SYSTEM sign missing AT PUBLIC HALL, 1st STORY | Aug 6, 2020 |
| Jun 1, 2020 | B | Apt 5B · § 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE ELECTRICAL LIGHT FIXTURES AT CEILING IN THE 1st ROOM FROM NORTH AT WEST LOCATED AT APT 5B, 5th STORY, 1st APARTMENT FROM SOUTH AT WEST | Jul 6, 2020 |
| Jun 1, 2020 | B | Apt 5B · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING AND ALL WALLS IN THE BATHROOM LOCATED AT APT 5B, 5th STORY, 1st APARTMENT FROM SOUTH AT WEST | Jul 6, 2020 |
| Jun 1, 2020 | B | Apt 5B · § 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK AT CEILING AND NORTH WALL IN THE BATHROOM LOCATED AT APT 5B, 5th STORY, 1st APARTMENT FROM SOUTH AT WEST | Jul 6, 2020 |
| Jun 1, 2020 | B | Apt 5B · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD FLOOR IN THE KITCHEN LOCATED AT APT 5B, 5th STORY, 1st APARTMENT FROM SOUTH AT WEST | Jul 6, 2020 |
| Jun 1, 2020 | B | Apt 5B · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD FLOOR IN THE 1st ROOM FROM NORTH AT WEST LOCATED AT APT 5B, 5th STORY, 1st APARTMENT FROM SOUTH AT WEST | Jul 6, 2020 |
| Jun 4, 2019 | B | Apt 2B · § 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE INOPERATIVE LIGHT SWITCH AT NORTH WALL IN THE PRIVATE HALLWAY LOCATED AT APT 2B, 2nd STORY, 1st APARTMENT FROM SOUTH AT WEST | Jul 9, 2019 |
| Jun 4, 2019 | C | Apt 2B · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 2B, 2nd STORY, 1st APARTMENT FROM SOUTH AT WEST | Jun 25, 2019 |
| Jun 3, 2019 | A | Apt 2B · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING IN THE PRIVATE HALLWAY LOCATED AT APT 2B, 2nd STORY, 1st APARTMENT FROM SOUTH AT WEST | Sep 6, 2019 |
| Jun 3, 2019 | C | Apt 2B · § 27-2005 ADM CODE REPLACE WITH NEW THE BROKEN OR DEFECTIVE GLASS PANE AT LOWER WINDOW SASH IN THE 1st ROOM FROM NORTH AT WEST LOCATED AT APT 2B, 2nd STORY, 1st APARTMENT FROM SOUTH AT WEST | Jun 11, 2019 |
| Jun 3, 2019 | A | Apt 2B · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE CEILING AND ALL WALLS IN THE 1st ROOM FROM NORTH AT EAST LOCATED AT APT 2B, 2nd STORY, 1st APARTMENT FROM SOUTH AT WEST | Sep 6, 2019 |
| Jun 3, 2019 | C | Apt 2B · § 27-2005 ADM CODE REPLACE WITH NEW THE BROKEN OR DEFECTIVE GLASS PANE AT LOWER WINDOW SASH IN THE 1st ROOM FROM NORTH AT EAST LOCATED AT APT 2B, 2nd STORY, 1st APARTMENT FROM SOUTH AT WEST | Jun 11, 2019 |
| Dec 19, 2018 | B | Apt 2B · § 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE ELECTRICAL CEILING LIGHT FIXTURE IN THE KITCHEN LOCATED AT APT 2B, 2nd STORY, 1st APARTMENT FROM SOUTH AT WEST | Jan 23, 2019 |
| Dec 19, 2018 | B | Apt 2B · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING IN THE KITCHEN LOCATED AT APT 2B, 2nd STORY, 1st APARTMENT FROM SOUTH AT WEST | Jan 23, 2019 |
| Dec 19, 2018 | B | Apt 2B · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE VINYL FLOOR TILES IN THE PRIVATE HALLWAY LOCATED AT APT 2B, 2nd STORY, 1st APARTMENT FROM SOUTH AT WEST | Jan 23, 2019 |
| Dec 19, 2018 | B | Apt 2B · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING IN THE PRIVATE HALLWAY LOCATED AT APT 2B, 2nd STORY, 1st APARTMENT FROM SOUTH AT WEST | Jan 23, 2019 |
| Dec 19, 2018 | B | Apt 2B · § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE PRIVATE HALLWAY LOCATED AT APT 2B, 2nd STORY, 1st APARTMENT FROM SOUTH AT WEST | Jan 23, 2019 |
| Dec 19, 2018 | B | Apt 2B · § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE KITCHEN LOCATED AT APT 2B, 2nd STORY, 1st APARTMENT FROM SOUTH AT WEST | Jan 23, 2019 |
| Dec 19, 2018 | C | Apt 2B · § 27-2026 ADM CODE REPAIR THE BROKEN OR DEFECTIVE CONNECTION AT WASTE LINE AT SINK IN THE KITCHEN LOCATED AT APT 2B, 2nd STORY, 1st APARTMENT FROM SOUTH AT WEST | Dec 27, 2018 |
| Dec 19, 2018 | A | Apt 2B · § 27-2005 ADM CODE REFIT DOOR IN THE BATHROOM LOCATED AT APT 2B, 2nd STORY, 1st APARTMENT FROM SOUTH AT WEST | Mar 24, 2019 |
| Dec 19, 2018 | A | Apt 2B · § 27-2005 ADM CODE REFIT LOWER WINDOW SASH IN THE 1st ROOM FROM NORTH AT WEST LOCATED AT APT 2B, 2nd STORY, 1st APARTMENT FROM SOUTH AT WEST | Mar 24, 2019 |
| Dec 19, 2018 | C | Apt 2B · § 27-2005 ADM CODE REPLACE WITH NEW THE BROKEN OR DEFECTIVE GLASS PANE AT LOWER WINDOW SASH 2ND WINDOW FROM WEST IN THE 1st ROOM FROM NORTH AT EAST LOCATED AT APT 2B, 2nd STORY, 1st APARTMENT FROM SOUTH AT WEST | Dec 27, 2018 |
| Jul 30, 2018 | B | Apt 2B · § 27-2005 ADM CODE REPLACE WITH NEW THE BROKEN OR DEFECTIVE COUNTERBALANCE TO NORTH 2 WINDOW (UPPER AND LOWER SASHES) IN THE 1st ROOM FROM NORTH AT EAST LOCATED AT APT 2B, 2nd STORY, 1st APARTMENT FROM SOUTH AT WEST | Sep 3, 2018 |
Showing 60 of 134. Full list on the agency site.
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Nov 15, 2026, 1:36 PM ET. BBL 1020620036.