2.75 floors · 2 apartments · 2,430 sq ft · built 1925 · class B1 · owner of record: Msf Realty Bd Llc
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual property registration Check HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Sep 1, 2027 in 291 days | Required only if the owner doesn't live there |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Apr 1, 2026 | Construction CLASS - 1 FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER CONTAINED IN DOB VIOLATION #112125CE31201PT CONTROL #376425. THIS ORDER MANDATES THAT COMPLETE CONSTRUCTION DOCUMENTS(COS) ADDRESSING ALL PERMITS OBJECTIONS ISSUE #35641094H | Jun 18, 2026 DEFAULT | $25,000 |
| Dec 8, 2025 | Construction CLASS - 1 FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER CONTAINED IN DOB VIOLATION #112125CE31201PT CONTROL #376425. THIS ORDER MANDATED THAT COMPLETE CONSTRUCTION DOCUMENTS(CDS) ADDRESSING ALL PREVIOUS REGISTERED DESI #35641087J | Dec 3, 2026 PENDING | $2,500 |
| Nov 3, 2025 | Construction CLASS - 1 FAILURE TO COMPLY WITH A COMMISSIONER'S ORDER TO PROVIDE AN N1-ENGINEERING REPORT WITHIN 7 DAYS OF THE OBSERVED CONDITIONS RELATED TO COMPLAINT # 3A32236 & 3A34204 ON 10/22/2025,THE REPORT SHOULD HAVE BEEN RECE #39165839Y | Apr 15, 2027 PENDING | $2,500 |
| Oct 28, 2025 | Construction CLASS - 1 OBSERVED AT TIME OF INSPECTION WORK DONE AT THE SUBJECT LOCATION WHILE A FULL SWO IS IN EFFECT., COMPLY WITH STOP WORK ORDER #39165144H | Apr 15, 2027 PENDING | $10,000 |
| Oct 21, 2025 | Construction CLASS - 2 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER AT TIME OF INSPECTION OBSERVED EXCESSIVE AMOUNT OF CONSTRUCTION WOOD DEBRIS EXCEED 10 CUBIT YARD OF COMBUSTIBLE MATERIAL TRASH AT THE REAR YARD CAN CAUSE A #39164316K | Apr 15, 2027 PENDING | $1,250 |
| Oct 21, 2025 | Construction CLASS - 1 FSWO ISSUED AT TIME OF INSPECTION OBSERVED AT EXPOSURE 3 WORK WITHOUT A PERMIT OR D.O.B APPROVAL VERTICAL AND HORIZONTAL ENLARGEMENT ALL THREE FLOORS ERECTED WITH WALLS WOOD FRAMING,NEW FLOOR JOIST ON EACH FLOO #39164315Z | Apr 15, 2027 PENDING | $2,500 |
| May 22, 2025 | Construction CLASS - 1 FAILURE TO MAINTAIN IN CODE COMPLIANT MANNER . NOTED : AT TIME OF INSPECTION , OBSERVED AT EXPOSURE 1 LOOSE SHINGLES AT ROOF LEVEL, ALSO HOLES AT CEILING ABOVE THE PORCH , THE STOOP, AND PORCH HAS CRACKS AT VAR #39148773X | Aug 6, 2025 DEFAULT | $12,500 |
| Feb 19, 2016 | Boilers CLASS - 2 FAILURE TO MAINTAIN BLDG IN CODE-COMPLIANT MANNER:FAILURE TO MAINTAIN BOILER:OBSERVATION HAS BEEN MADE IN BSMT BOILER MISSING SPILL SWITCH & VENT (DAMPER) PHOTO TAKEN.REM:MAINTAIN BOILER. #35140263Y | Apr 4, 2016 WRITTEN OFF | $0 |
| Issued | Violation | Status |
|---|---|---|
| Nov 21, 2025 | CONSTRUCTION DETACHD WOOD-FRAMD BLDG STRUCTURLY COMPROMISD FROM UNPERMTTD STRUCTRAL /FOUNDATION WRK PER 1/07/25 FLYNN,PE RPT,EMERG STABILIZATN DONE; REVSD CDS MISSING AND NO PERMIT OBTAINED. REMEDY: PROVIDE REVISED DETAILED CDS + NARRATIVE ADDRESSING CSENGINEERNG OBJECTIONS; SUBMIT BY 11/28/25 AND FILE/OBTAIN PE #CE31201PT | DOB VIOLATION - ACTIVE |
| Oct 29, 2025 | CONSTRUCTION FTC-W/COMMISSIONER'S ORDER CONTAINED IN VIO#102825CE31201PT(CONTROL# 376421).REMEDY:COMPLY W/CODE.PROVIDE BUILDABLE DETAILED SIGNED&SEALED SKETCHES,CS INFO & SCHEDULE TO CS ENGINEERING FOR CONSIDERATION COMMENCE WORK UNDER PE & CS OVER SIGHT BY 9AM 11/3/25 #CE31201PT | DOB VIOLATION - ACTIVE |
| Oct 28, 2025 | CONSTRUCTION 2-STY+C DETACHD WD FRM BLDG PART DEMO'D, STRUCTURALLY COMPROMISED & EXPOSED. 1-STY REAR ADD'N DEMO'D & REPLACED W NEW 2-STY ADD'N, NO PERMITS. UNSUPPORTED WALLS, SHORING FAIL, DESTABLZED FNDN, COLLAPSE RISK. REMEDY: STRT VISUAL INSPECTION 10/29/25. NYS PE TO PROVIDE MONITORNG PLAN,TAKE DAILY READNGS #CE31202PT | DOB VIOLATION - ACTIVE |
| Oct 28, 2025 | CONSTRUCTION EMERGNCY WRK-2STRY+CELLAR WOOD FRM'D BLDG, PART. DEMO'D STRUCTLY COMP- ROMISED. FDN/U.P. WORK W/O PERMIT, ROOF DESTABILIZED,INCOMPLETE LATERAL & GRAVITY LOAD PATH. DANGER OF COLLAPSE. REMEDY: SUBMIT S/S DOCS FOR EMERGNCY WRK BY 4PM, 10/28/25. STRT BY 12PM, 10/29. FILE W/I 48 HRS. FT SUPERVSN BY CS A #CE31201PT | DOB VIOLATION - ACTIVE |
| Oct 22, 2025 | CONSTRUCTION OBSERVED HORIZONTAL/ VERTICAL ENLARGEMENT AT EXP. 3 FROM THE GROUND TO THE 3RD FLOOR, INCLUDING NEW JOISTS AND WALLS, THE INSTALLATION OF TEMPORARY SHORING AT THE INTERIOR 3RD-FLOOR REAR, AND THE REMOVAL OF INTERIOR PARTITIONS THROUGHOUT AND SIGNIFICANT DEBRIS BUILD-UP AT EXTERIOR EXPS. 3 & 4 POSSIB #25-02388 | DOB VIOLATION - ACTIVE |
| Oct 22, 2025 | CONSTRUCTION ATOI, OBSERVED AT EXP. 3, WORK WITHOUT A PERMIT OR D.O.B APPROVAL FOR VERTICAL AND HORIZONTAL ENLARGEMENT. ALL 3 FLOORS ARE ERECTED WITH WALLS, WOOD FRAMING, NEW FLOOR JOISTS ON EACH FLOOR. ALSO, THE EXTENSION AT REAR IS NOT PROPERLY SUPPORTED. THERE ALSO CUT OUTS FOR WINDOWS ON EACH LEVELS. #25-02386 | DOB VIOLATION - ACTIVE |
| May 22, 2025 | CONSTRUCTION FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER . NOTED : AT TIME OF INSPECTION OBSERVED AT EXPOSURE 1 AT PORCH ,THERE IS HOLES IN THE CEILING , ,THE STOOP AND CONCRETE FLOOR HAS CRACKS AT VARIOUS LOCATIONS, ALSO THE BASE OF THE COLUMNS HAS DETERIORATED ,AND CAN COLLAPSE, THIS IS HAZARDOUS , A #25-00879 | DOB VIOLATION - ACTIVE |
None open.
| Issued | Class | Violation | Correct by |
|---|---|---|---|
| Jan 28, 2010 | B | Apt 2 · SECTION 27-2073 ADM CODE - PROVIDE AN ADEQUATE SUPPLY OF GAS TO THE FIXTURES RANGE IN THE ENTIRE APARTMENT LOCATED AT APT 2, 2nd STORY | Mar 4, 2010 |
| Jan 28, 2010 | B | Apt 2 · SECTION 27-2046.1, 2046.2 HMC: PROVIDE AN APPROVED AND OPERATIONAL CARBON MONOXIDE DETECTING DEVICE, INSTALLED IN ACCORDANCE WITH APPLICABLE LAW AND RULES. IN THE ENTIRE APARTMENT LOCATED AT APT 2, 2nd STORY | Mar 4, 2010 |
| Jan 25, 2010 | B | Apt 2 · SECTION 27-2046.1, 2046.2 HMC: PROVIDE AN APPROVED AND OPERATIONAL CARBON MONOXIDE DETECTING DEVICE, INSTALLED IN ACCORDANCE WITH APPLICABLE LAW AND RULES. IN THE ENTIRE APARTMENT LOCATED AT APT 2, 2nd STORY | Mar 1, 2010 |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Nov 14, 2026, 11:33 PM ET. BBL 3053760024.