Brooklyn · Block 4015 · Lot 1 · 11207

400 Ashford Street

5 floors · 78,380 sq ft · built 1908 · class W1 · owner of record: Nyc Department Of Education

6open violations
$0ECB/OATH penalties owed
0HPD class C (immediately hazardous)
181dto Energy and water benchmarking

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 60 days
Keep the report on file (not filed with DOB)
Energy and water benchmarking Likely applies
Local Law 84 · May 1 each year
What this is

Buildings over 25,000 sq ft (this lot shows 78,380 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page

May 1, 2027
in 181 days
Annual filing
Building emissions report Likely applies
Local Law 97 · May 1 each year (extensions available)
What this is

Covered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page

May 1, 2027
in 181 days
Annual filing
Gas piping inspection (2029 cycle) Likely applies
Local Law 152 · During 2029
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 5 is on the 2029 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2029
in 1156 days
Next cycle year 2029
Energy audit and retro-commissioning (2035) Likely applies
Local Law 87 · Calendar year 2035
What this is

Buildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 4015). Agency page

Dec 31, 2035
in 3347 days
Next due 2035
Annual boiler inspection (2 boilers) Applies
Boiler inspection · By December 31 each year
What this is

Boilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-08-19 (Accepted). Agency page

On file2026 reports accepted

Open violations

ECB / OATH (2)
IssuedViolationHearingBalance
Mar 27, 2026Construction CLASS - 2
REISSUE:35721167J-FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER.FOUNDATION WALL AT GAS METER ROOM AND COAL CHUTE ROOM HAS WATER DAMAGE.REM:COMPLY WITH CODE.
#35727303M
Apr 13, 2026
POP/IN-VIO
$0
Jul 17, 2025Construction CLASS - 2
FAILURE TO MAINTAIN BUILDING WALL(S) OR APPURTENANCES.-NOTED: FOUNDATION WALL HAS BECOME POROUS ALLOWING THE RAIN WATER INTO THE GAS METER ROOM AND COAL CHUTE AREA. REMEDY: MAKE NECESSARY REPAIRS.
#35721167J
Aug 15, 2025
POP/IN-VIO
$0
DOB (3)
IssuedViolationStatus
Aug 16, 1993LOCAL LAW 62/91 - BOILERS

#18970
DOB VIOLATION - ACTIVE
Aug 16, 1993LOCAL LAW 62/91 - BOILERS

#18971
DOB VIOLATION - ACTIVE
Aug 16, 1993LOCAL LAW 62/91 - BOILERS

#18972
DOB VIOLATION - ACTIVE
DOB NOW Safety (1)
IssuedViolationStatus
Sep 18, 2025Gas Piping - LL152 FTF-PL-PER
Cycle 1, Sub-cycle B (premises is in Community District 5)
Active
HPD (0)

None open.

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Nov 1, 2026, 8:42 PM ET. BBL 3040150001.