Brooklyn · Block 1251 · Lot 66 · 11213

40 Hampton Place

4 floors · 2 apartments · 3,224 sq ft · built 1907 · class B9 · owner of record: Beshari, Yosef Y

8open violations
$14,725ECB/OATH penalties owed
0HPD class C (immediately hazardous)
314dto Annual property registration

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Annual property registration Check
HPD registration · September 1 each year
What this is

Residential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page

Sep 1, 2027
in 314 days
Required only if the owner doesn't live there

Open violations

ECB / OATH (7) · $14,725 owed
IssuedViolationHearingBalance
Feb 6, 2026Construction CLASS - 2
NOTED: VIOLATION ISSUED FOR THE ERECTION OF A CONSTRUCTION FENCE AT EXPO # 1-2 AND 4 NO PERMIT WAS FOUND FOR THE SCOPE OF WORK, OBTAIN ALL PERMITS
#39176321N
Apr 19, 2027
DEFAULT
$3,125
Oct 1, 2024Construction CLASS - 1
OBSERVED AT BASEMENT/CELLAR LEVEL NO FRESH AIR VENTILATION IN ROOM HOUSING THE GAS FIRED WATER HEATER AS WELL AS A GAS FIRED HVAC. MECHANICAL ROOMS SHALL BE PROPERLY VENTED., REPAIR AND/REPLACE
#39126285J
Jun 11, 2026
IN VIOLATION
$1,250
Oct 1, 2024Construction CLASS - 1
OBSERVED GAS FIRED HVAC INSTALLED AT BASEMENT/CELLAR. NO PERMITS ON FILE ON BIS OR DOB NOW FOR THIS APPLICATION., OBTAIN PERMIT
#39126289R
Jun 11, 2026
IN VIOLATION
$2,500
Oct 1, 2024Construction CLASS - 1
OBSERVED FLUE PIPE TO UNPERMITTED GAS FIRED WATER HEATER BACK-PITCHED. THIS CAN CAUSE CARBON MONOXIDE TO BUILD UP IN YOUR HOME., OBTAIN PERMIT
#39126284H
Jun 11, 2026
IN VIOLATION
$1,250
Oct 1, 2024Construction CLASS - 1
OBSERVED GAS FIRED WATER HEATER INSTALLED AT BASEMENT/CELLAR LEVEL WITHOUT ANY PERMITS ON FILE AT THE DEPARTMENT OF BUILDINGS., OBTAIN PERMIT
#39126283X
Jun 11, 2026
IN VIOLATION
$2,500
Oct 1, 2024Unknown CLASS - 1
ATOI ON AN ACTIVE JOBSITE, OBSERVED ELECTRICAL WORK WAS PERFORMED THROUGHOUT THE ENTIRE PREMISES. UPON REVIEWING. AND DOING A SEARCH ON BIS/DOB NOW REVEAL TO ME THAT NO PERMIT WAS ISSUED FOR ELECTRICAL WORK FOR
#39126292H
Jun 11, 2026
IN VIOLATION
$1,600
Oct 1, 2024Construction CLASS - 1
OBSERVED STRUCTURAL WORK OF A WOOD EXTENSION @ REAR EXPOSURE 3 ON AN OCCUPIED BUILDING, WHERE STRUCTURAL WALL WAS REMOVED, MULTIPLE CRACKS AT THE FACADE SPLITTING THE BRICKS IN HORIZONTAL DIRECTION OF THE WINDO
#39126271Z
Jan 28, 2027
PENDING
$2,500
DOB (3)
IssuedViolationStatus
Oct 1, 2024LANDMARK

#24-0195
DOB VIOLATION - ACTIVE
Oct 1, 2024CONSTRUCTION
OBSERVED STRUCTURAL WORK OF A WOOD EXTENSION @ REAR EXPOSURE 3 ON AN OCCUPIED BUILDING, WHERE STRUCTURAL WALL WAS REMOVED, MULTIPLE CRACKS AT THE FA ADE SPLITTING THE BRICKS IN DIRECTION OF THE WINDOWS, CAUSING A POSSIBLE DISLODGMENT. FDNY CALLED TO RESPOND TO UNSAFE CONDITIONS FOR RESIDENTS & STRUC
#24-02640
DOB VIOLATION - ACTIVE
Oct 1, 2024CONSTRUCTION
UNPERMITTED DEMOLITION WORK OBSERVED AT THE EXP 3 WALL,WITH UNPERMITTED,UNDESIGNED SHORING SUPPORTING THE REMAINING EXP3 WALL ABOVE THE 1ST FLOOR LEVEL.CRACKS WERE ALSO OBSERVED AT THE EXP.3 WALL DUE TO THE UNPERMITTED DM AND SHORING, COMPROMISING ITS STRUCTURAL INTEGRITY.THERE IS A POTENTIAL FOR CO
#24-02641
DOB VIOLATION - ACTIVE
DOB NOW Safety (0)

None open.

HPD (0)

None open.

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Oct 22, 2026, 3:34 AM ET. BBL 3012510066.

Look up another building