2 floors · 6 apartments · 2,600 sq ft · built 1931 · class C2 · owner of record: Bristol, Martin
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Overdue | Registration expired 2026-09-01 |
| Gas piping inspection (2026 cycle) Likely applies Local Law 152 · During 2026 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 4 is on the 2026 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2026 in 63 days | Due this year |
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 63 days | Keep the report on file (not filed with DOB) |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 63 days | Annual |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 79 days | Annual |
| Annual boiler inspection (1 boiler) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-07-10 (Accepted). Agency page | On file | 2026 reports accepted |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Jul 29, 2026 | Construction CLASS - 1 UNLAWFUL ACTS. FAILURE TO COMPLY WITH THE COMMISSIONERS ORDERS TO OBTAIN A PERMIT FOR VIO# 35671338M. NO PERMIT ISSUED FOR INSTALLATION OF WOOD AND METAL FRAMING THROUGHOUT APT 3R, COMPLY WITH COMMISSIONER'S OR #39198210H | Oct 14, 2026 IN VIOLATION | $2,500 |
| Jan 5, 2024 | Construction CLASS - 1 WORK W/O A PERMIT. NOTED; ON THIRD FLOOR-APT.#3R NEW WOOD AND METAL FRAMING THROUGHOUT, NEW METAL FRAMED DROP CEILING INSTALLED THROUGHOUT, ENTIRE APT. REWIRED AND NEW ELECTRICAL FUSE BOX INSTALLED AND LEFT OPE #35671338M | Jul 11, 2025 IN VIOLATION | $0 |
| Jul 2, 1999 | Construction Hazardous FAILURE TO MAINTAIN EXTERIOR BLDG WALL. DEFECT IS: REAR WALL IS BULGING INWARD AT 1ST FL APT 1L (STUDS & SOLE PLATE ROTTED CAUSING BULGE). REMEDY: MAINTAIN EXTERIOR WALL & OBTAIN PERMITS & AN ENGINEER #34194719K | Dec 6, 1999 WRITTEN OFF | $0 |
| Dec 29, 1998 | Construction Non-Hazardous FAILURE TO MAINTAIN BUILDING DEFECT IS 1 HOLES IN CONCRETE FLOOR IN BASEMENT 2 APPROX 5 BEAMS AT 1ST FLOOR REAR ROTTED VATAR DAMAGE 3-HAND RAILLOOSE FRON 1ST TO 3RD FLOOR LANDING 4 FLOOR JOISTS ARE SAGGING AT #34187224N | Mar 15, 1999 WRITTEN OFF | $0 |
| Issued | Violation | Status |
|---|---|---|
| Mar 6, 2024 | FAIL TO CERTIFY CLASS 1 FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION #00084 | DOB VIOLATION - ACTIVE |
| Aug 16, 1993 | LOCAL LAW 62/91 - BOILERS #22276 | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Oct 31, 2025 | Gas Piping - LL152 FTF-PL-PER Cycle 1, Sub-cycle C (premises is in Community District 4) | Active |
| Mar 6, 2024 | AEUHAZ FTC-AEU-HAZ | Active |
None open.
| Date | Source | What | Now |
|---|---|---|---|
| Jul 29, 2026 | ECB | Construction: UNLAWFUL ACTS. FAILURE TO COMPLY WITH THE COMMISSIONERS ORDERS TO OBTAIN A PERMIT FOR VIO# 35671338M. NO PERMIT ISSUED FOR INSTALLATION OF WOOD AND METAL FRAMING THROUGHOUT APT 3R, COMPLY WITH COMMISSIONER'S OR | Open |