3 floors · 44,150 sq ft · built 2017 · class P5 · owner of record: Community Cares Local Development Corpor Ation
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 64 days | Keep the report on file (not filed with DOB) |
| Energy and water benchmarking Likely applies Local Law 84 · May 1 each year What this isBuildings over 25,000 sq ft (this lot shows 44,150 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page | May 1, 2027 in 185 days | Annual filing |
| Building emissions report Likely applies Local Law 97 · May 1 each year (extensions available) What this isCovered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page | May 1, 2027 in 185 days | Annual filing |
| Gas piping inspection (2029 cycle) Likely applies Local Law 152 · During 2029 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 5 is on the 2029 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2029 in 1160 days | Next cycle year 2029 |
| Annual boiler inspection (1 boiler) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-04-03 (Accepted). Agency page | On file | 2026 reports accepted |
None open.
None open.
| Issued | Violation | Status |
|---|---|---|
| Sep 25, 2026 | Benchmarking - LL84 DQ-EN-BENCH FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4 | Active |
| Issued | Class | Violation | Correct by |
|---|---|---|---|
| Apr 28, 2014 | C | SECTION 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE LOCK AT BUILDING ENTRANCE DOOR | May 6, 2014 |
| Apr 28, 2014 | C | SECTION 27-2005, 2007 ADM CODE REMOVE THE ILLEGAL FASTENING KEY OPERATED DOUBLE CYLINDER LOCK AT BUILDING ENTRANCE DOOR | May 6, 2014 |
| Jul 13, 2011 | B | SECTION 27-2005,2007 ADMIN. CODE AND DEPARTMENT RULES AND REGULATIONS: REMOVE THE ENCUMBRANCE OBSTRUCTING EGRESS FROM FIRE ESCAPES HOUSEHOLD ITEMS AT FRONT.ALL STORIES | Aug 17, 2011 |
| Jul 13, 2011 | B | SECTION 27-2005 ADMIN. CODE: FIRE ESCAPE DEFECTIVE. REPLACE WITH NEW THE BROKEN, DEFECTIVE AND/OR MISSING SHOE AT DROP LADDER AT FRONT FIRE ESCAPE | Aug 17, 2011 |
| Jul 13, 2011 | B | SECTION 27-2005 ADMIN. CODE: FIRE ESCAPE DEFECTIVE. REPLACE WITH NEW THE BROKEN, DEFECTIVE AND/OR MISSING FLAT BAR.AT DROPLADDER AT FRONT FIRE ESCAPE | Aug 17, 2011 |
| Aug 4, 2009 | B | SECTION 27-2005, 2007 ADMIN. CODE: REMOVE ALL ENCUMBRANCES CONSISTING OF 3RD. STORY PUBLIC HALL. | Sep 8, 2009 |
| Aug 4, 2009 | B | SECTION 27-2010,2011,2012 ADMIN. CODE: CLEANSE AND DISINFECT TO THE SATISFACTION OF THIS DEPARTMENT AFTER REMOVING THE ACCUMULATION OF RUBBISH WATER AND DISINFECT PUBLIC HALL THRU/OUT ALL STORIES. | Sep 8, 2009 |
| Aug 4, 2009 | C | SECTION 27-2005 ADMIN. CODE: PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CEILING AND WALLS 3RD. STORY PUBLIC HALL. | Aug 10, 2009 |
| Aug 4, 2009 | C | SECTION 27-2005 ADMIN. CODE: REPLACE WITH NEW THE MISSING BROKEN WINDOW GLASS NORTHEAST ROOM EAST WINDOW LOWER SASH 3RD. STORY APT. 2. | Aug 10, 2009 |
| Aug 4, 2009 | C | SECTION 27-2005 ADMIN. CODE: REPAIR THE ROOF SO THAT IT WILL NOT LEAK OVER 3RD. STORY APT. 2 AND 3RD. STORY PUBLIC HALL. ER-1. | Aug 10, 2009 |
| Aug 4, 2009 | C | SECTION 27-2005 ADMIN. CODE: REPLACE WITH NEW THE MISSING GLASS SKYLIGHT BATHROOM 3RD. STORY APT. 2. | Aug 10, 2009 |
| Aug 4, 2009 | B | SECTION 27-2005 ADMIN. CODE: PROPERLY SECURE THE LOOSE LIGHT FIXTURE CENTER ROOM CLOSET NORTH WALL 3RD. STY. APT. 2. | Sep 8, 2009 |
| Aug 4, 2009 | B | SECTION 27-2005 ADMIN. CODE: REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN UNIFORM COLOR CEILING AND WALLS THRU/OUT 3RD. STORY APT. 2. | Sep 8, 2009 |
| Aug 4, 2009 | B | SECTION 27-2026 ADMIN. CODE: REPAIR THE LEAKY AND/OR DEFECTIVE FAUCETS BATHROOM SHOWER COLD WATER 3RD. STORY APT. 2. | Sep 8, 2009 |
| Date | Source | What | Now |
|---|---|---|---|
| Sep 25, 2026 | DOB Safety | Benchmarking - LL84: FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4 | Open |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Oct 28, 2026, 6:49 PM ET. BBL 3036670028.