Queens · Block 5060 · Lot 18 · 11355

40-66 College Point Blvd

2 floors · 22,050 sq ft · built 1959 · class E9 · owner of record: Hang Hing Lee Reality Inc

17open violations
$2,500ECB/OATH penalties owed
0HPD class C (immediately hazardous)
1160dto Gas piping inspection (2029 cycle)

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 64 days
Keep the report on file (not filed with DOB)
Gas piping inspection (2029 cycle) Likely applies
Local Law 152 · During 2029
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 7 is on the 2029 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2029
in 1160 days
Next cycle year 2029

Open violations

ECB / OATH (13) · $2,500 owed
IssuedViolationHearingBalance
Oct 8, 2026Construction CLASS - 1
WORK WITHOUT A PERMIT. AT TIME OF INSPECTION, OBSERVED, CONSTRUCTED A BIG 1STORY STRUCTURE BY STEEL FRAME & LUMBER IN THE BACK OF THE 2STORY BUILDING FOR WAREHOUSE PURPOSE ALSO NOTED ELECTRICAL WIRING & FIXTURE
#39207326L
Dec 15, 2026
PENDING
$2,500
Jul 22, 2026Construction CLASS - 1
UNLAWFUL ACTS. FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER. FAILURE TO OBTAIN PERMITS OR FILE CERTIFICATE OF CORRECTIONS FOR VIOLATION 35685691K, COMPLY WITH COMMISSIONER'S ORDER
#39197155J
Sep 29, 2026
ADMIT/IN-VIO
$0
May 7, 2026Unknown CLASS - 2
ECB VIOLATION AND PSWO ISSUED FOR ELECTRICAL WORK IN PROGRESS IN COMMERCIAL SPACE. NOTED: OBSERVED NEW ELECTRICAL CABLES/BOXES IN CEILING AND WALLS FOR LIGHTS, OUTLETS AND SWITCHES. STOP ALL ELECTRICAL WORK., O
#39187682M
Jul 14, 2026
ADMIT/IN-VIO
$0
Feb 3, 2026Construction CLASS - 1
WORK WITHOUT A PERMIT. AT TIME OF INSPECTION OBSERVED ON 1ST FLOOR STEEL I-BEAMS INSTALLED FOR INSTALLATION OF MEZZANINE LEVEL. NO PERMITS ISSUED FOR THIS WORK. REMEDY: OBTAIN PERMIT.
#35685691K
Apr 14, 2026
ADMIT/IN-VIO
$0
Jan 22, 2009Construction CLASS - 2
WORK DOESN'T CONFORM TO APPROVED CONSTRUCTION DOCUMENTS & OR APPROVED AMENDMENTS FOR ALT.II JOB # 410173495 10-10-08 LOC REQUESTED 11-14-08 NOTED:AT FIRST FL 1 EXIT SIGNS 2 PT EMERGENCY LIGHTS NOT INSTALLED FOR
#34751346X
Jul 20, 2010
IN VIOLATION
$0
Jan 22, 2009Unknown CLASS - 2
UNLAWFUL ACYS FAILURE TO COMPLY W/ AN ORDER OF THE COMMISSIONER'S FAILURE TO CERTIFY CORRECTIONS FOR NOTICE OF VIO. # 1. 34625425R ISSUED 02/11/08 REMEDY: FILE COFC
#34751347H
Jul 20, 2010
IN VIOLATION
$0
Oct 7, 2008Construction CLASS - 2
WORK DOES NOT CONFORMED TO APPROVED CONSTRUCTION DOCUMENTS AND/OR APPROVED AMENDMENTS. AT 1ST FL - 5 COLUMN POSTS IN PLACE - PLAN SHOWS 4 COLUMN POSTS. ADDITIONAL ENTRY DOOR PROVIDED LEADING TO STAIR GOING TO
#34710435R
Dec 2, 2008
STIPULATION/IN-VIO
$0
Sep 3, 2008Construction CLASS - 1
FAILURE TO MAINTAIN BLDH IN CODE COMPLIANT MANNER NOTED SHED APPORX 45LONGX20DEEPX20HIGH W/ AND DECK AT TIME OF INSPECTION 2 STY TIMBER FRAMED SHED HAS ROTTENS TIMBER CROSS BRACING PROVIDING NO SUPPORT ELECTRIC
#34705579J
Oct 28, 2008
IN VIOLATION
$0
Jul 16, 2008Construction CLASS - 3
OCCU. CONTRARY TO DOB RECORDS WHICH INDICATE E9 WAREHOUSE NOTE CONTRARY TO DOB RECORDS 2ND FLOOR NOW OCCUPIED AS PRARYER MEETING ROOM / BUDDHIST TEMPLE. REMEDY; DISCONTINUE ILLEGAL USE OR AMMEND C OF O.
#34692611K
Sep 9, 2008
IN VIOLATION
$0
Feb 11, 2008Construction Non-Hazardous
WORK W/O A PERMIT - REAR EXTENTION WOOD FRAMED. 2 STY SECTION(APPROX. 25 X 40 X 20 HIGH) 1 STY SECTION. (10X40X10HIGH) 2ND STY ENCLOSED, 1 STY OPEN WAREHOUSE. INSTALLED METAL STAIR EXTERIOR CASE(TWO STORIES)INS
#34625099K
Mar 10, 2009
IN VIOLATION
$0
Feb 11, 2008Construction Hazardous
OCCUPANCY CONTRARY TO THAT ALLOWED BY BLDG DEPT RECORDS INDICATE E-9 WAREHOUSE 2ND FLR IS USE AS A TEMPLE HOUSE OF WORSHIP.REMEDY:DISCONTINUE ILLEGAL USE OR AMEND C.O.
#34625425R
Sep 16, 2008
IN VIOLATION
$0
Apr 11, 2001Construction Non-Hazardous
WORK WITHOUT A PERMIT WORK NOTED:AT SECOND FLOOR CONSTRUCTION OF INTERIOR PARTITION WALLS TO CREATE LIVING QUARTERS IN A WAREHOUSE.REMEDY:OBTAIN A PERMIT IF FEASIBLE OR RESTORE PREMISES TO PRIOR LEGAL CONDITION
#34281994K
Nov 27, 2001
IN VIOLATION
$0
Apr 11, 2001Plumbing Hazardous
PLUMBING WORK WITHOUT A PERMIT"GAS PIPE INSTALLED NO PERMITS" REMEDY:OBTAIN A PERMIT IF FEASIBLE OR RESTORE TO PRIOR LEGAL CONDITION.
#34275981K
Nov 27, 2001
IN VIOLATION
$0
DOB (4)
IssuedViolationStatus
Apr 11, 2001CONSTRUCTION

#7JMF2
VIOLATION WORK WITHOUT PERMIT - ACTIVE
Apr 11, 2001PLUMBING

#07GS01
VIOLATION WORK WITHOUT PERMIT - ACTIVE
Apr 11, 2001PLUMBING

#07GS02
DOB VIOLATION - ACTIVE
Apr 11, 2001PLUMBING

#07GS03
DOB VIOLATION - ACTIVE
DOB NOW Safety (0)

None open.

HPD (0)

None open.

Issued in the last 120 days

DateSourceWhatNow
Oct 8, 2026ECBConstruction: WORK WITHOUT A PERMIT. AT TIME OF INSPECTION, OBSERVED, CONSTRUCTED A BIG 1STORY STRUCTURE BY STEEL FRAME & LUMBER IN THE BACK OF THE 2STORY BUILDING FOR WAREHOUSE PURPOSE ALSO NOTED ELECTRICAL WIRING & FIXTUREOpen
Jul 22, 2026ECBConstruction: UNLAWFUL ACTS. FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER. FAILURE TO OBTAIN PERMITS OR FILE CERTIFICATE OF CORRECTIONS FOR VIOLATION 35685691K, COMPLY WITH COMMISSIONER'S ORDEROpen

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Oct 28, 2026, 12:26 PM ET. BBL 4050600018.

Look up another building