2 floors · 22,050 sq ft · built 1959 · class E9 · owner of record: Hang Hing Lee Reality Inc
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 64 days | Keep the report on file (not filed with DOB) |
| Gas piping inspection (2029 cycle) Likely applies Local Law 152 · During 2029 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 7 is on the 2029 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2029 in 1160 days | Next cycle year 2029 |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Oct 8, 2026 | Construction CLASS - 1 WORK WITHOUT A PERMIT. AT TIME OF INSPECTION, OBSERVED, CONSTRUCTED A BIG 1STORY STRUCTURE BY STEEL FRAME & LUMBER IN THE BACK OF THE 2STORY BUILDING FOR WAREHOUSE PURPOSE ALSO NOTED ELECTRICAL WIRING & FIXTURE #39207326L | Dec 15, 2026 PENDING | $2,500 |
| Jul 22, 2026 | Construction CLASS - 1 UNLAWFUL ACTS. FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER. FAILURE TO OBTAIN PERMITS OR FILE CERTIFICATE OF CORRECTIONS FOR VIOLATION 35685691K, COMPLY WITH COMMISSIONER'S ORDER #39197155J | Sep 29, 2026 ADMIT/IN-VIO | $0 |
| May 7, 2026 | Unknown CLASS - 2 ECB VIOLATION AND PSWO ISSUED FOR ELECTRICAL WORK IN PROGRESS IN COMMERCIAL SPACE. NOTED: OBSERVED NEW ELECTRICAL CABLES/BOXES IN CEILING AND WALLS FOR LIGHTS, OUTLETS AND SWITCHES. STOP ALL ELECTRICAL WORK., O #39187682M | Jul 14, 2026 ADMIT/IN-VIO | $0 |
| Feb 3, 2026 | Construction CLASS - 1 WORK WITHOUT A PERMIT. AT TIME OF INSPECTION OBSERVED ON 1ST FLOOR STEEL I-BEAMS INSTALLED FOR INSTALLATION OF MEZZANINE LEVEL. NO PERMITS ISSUED FOR THIS WORK. REMEDY: OBTAIN PERMIT. #35685691K | Apr 14, 2026 ADMIT/IN-VIO | $0 |
| Jan 22, 2009 | Construction CLASS - 2 WORK DOESN'T CONFORM TO APPROVED CONSTRUCTION DOCUMENTS & OR APPROVED AMENDMENTS FOR ALT.II JOB # 410173495 10-10-08 LOC REQUESTED 11-14-08 NOTED:AT FIRST FL 1 EXIT SIGNS 2 PT EMERGENCY LIGHTS NOT INSTALLED FOR #34751346X | Jul 20, 2010 IN VIOLATION | $0 |
| Jan 22, 2009 | Unknown CLASS - 2 UNLAWFUL ACYS FAILURE TO COMPLY W/ AN ORDER OF THE COMMISSIONER'S FAILURE TO CERTIFY CORRECTIONS FOR NOTICE OF VIO. # 1. 34625425R ISSUED 02/11/08 REMEDY: FILE COFC #34751347H | Jul 20, 2010 IN VIOLATION | $0 |
| Oct 7, 2008 | Construction CLASS - 2 WORK DOES NOT CONFORMED TO APPROVED CONSTRUCTION DOCUMENTS AND/OR APPROVED AMENDMENTS. AT 1ST FL - 5 COLUMN POSTS IN PLACE - PLAN SHOWS 4 COLUMN POSTS. ADDITIONAL ENTRY DOOR PROVIDED LEADING TO STAIR GOING TO #34710435R | Dec 2, 2008 STIPULATION/IN-VIO | $0 |
| Sep 3, 2008 | Construction CLASS - 1 FAILURE TO MAINTAIN BLDH IN CODE COMPLIANT MANNER NOTED SHED APPORX 45LONGX20DEEPX20HIGH W/ AND DECK AT TIME OF INSPECTION 2 STY TIMBER FRAMED SHED HAS ROTTENS TIMBER CROSS BRACING PROVIDING NO SUPPORT ELECTRIC #34705579J | Oct 28, 2008 IN VIOLATION | $0 |
| Jul 16, 2008 | Construction CLASS - 3 OCCU. CONTRARY TO DOB RECORDS WHICH INDICATE E9 WAREHOUSE NOTE CONTRARY TO DOB RECORDS 2ND FLOOR NOW OCCUPIED AS PRARYER MEETING ROOM / BUDDHIST TEMPLE. REMEDY; DISCONTINUE ILLEGAL USE OR AMMEND C OF O. #34692611K | Sep 9, 2008 IN VIOLATION | $0 |
| Feb 11, 2008 | Construction Non-Hazardous WORK W/O A PERMIT - REAR EXTENTION WOOD FRAMED. 2 STY SECTION(APPROX. 25 X 40 X 20 HIGH) 1 STY SECTION. (10X40X10HIGH) 2ND STY ENCLOSED, 1 STY OPEN WAREHOUSE. INSTALLED METAL STAIR EXTERIOR CASE(TWO STORIES)INS #34625099K | Mar 10, 2009 IN VIOLATION | $0 |
| Feb 11, 2008 | Construction Hazardous OCCUPANCY CONTRARY TO THAT ALLOWED BY BLDG DEPT RECORDS INDICATE E-9 WAREHOUSE 2ND FLR IS USE AS A TEMPLE HOUSE OF WORSHIP.REMEDY:DISCONTINUE ILLEGAL USE OR AMEND C.O. #34625425R | Sep 16, 2008 IN VIOLATION | $0 |
| Apr 11, 2001 | Construction Non-Hazardous WORK WITHOUT A PERMIT WORK NOTED:AT SECOND FLOOR CONSTRUCTION OF INTERIOR PARTITION WALLS TO CREATE LIVING QUARTERS IN A WAREHOUSE.REMEDY:OBTAIN A PERMIT IF FEASIBLE OR RESTORE PREMISES TO PRIOR LEGAL CONDITION #34281994K | Nov 27, 2001 IN VIOLATION | $0 |
| Apr 11, 2001 | Plumbing Hazardous PLUMBING WORK WITHOUT A PERMIT"GAS PIPE INSTALLED NO PERMITS" REMEDY:OBTAIN A PERMIT IF FEASIBLE OR RESTORE TO PRIOR LEGAL CONDITION. #34275981K | Nov 27, 2001 IN VIOLATION | $0 |
| Issued | Violation | Status |
|---|---|---|
| Apr 11, 2001 | CONSTRUCTION #7JMF2 | VIOLATION WORK WITHOUT PERMIT - ACTIVE |
| Apr 11, 2001 | PLUMBING #07GS01 | VIOLATION WORK WITHOUT PERMIT - ACTIVE |
| Apr 11, 2001 | PLUMBING #07GS02 | DOB VIOLATION - ACTIVE |
| Apr 11, 2001 | PLUMBING #07GS03 | DOB VIOLATION - ACTIVE |
None open.
None open.
| Date | Source | What | Now |
|---|---|---|---|
| Oct 8, 2026 | ECB | Construction: WORK WITHOUT A PERMIT. AT TIME OF INSPECTION, OBSERVED, CONSTRUCTED A BIG 1STORY STRUCTURE BY STEEL FRAME & LUMBER IN THE BACK OF THE 2STORY BUILDING FOR WAREHOUSE PURPOSE ALSO NOTED ELECTRICAL WIRING & FIXTURE | Open |
| Jul 22, 2026 | ECB | Construction: UNLAWFUL ACTS. FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER. FAILURE TO OBTAIN PERMITS OR FILE CERTIFICATE OF CORRECTIONS FOR VIOLATION 35685691K, COMPLY WITH COMMISSIONER'S ORDER | Open |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Oct 28, 2026, 12:26 PM ET. BBL 4050600018.