3 floors · 3 apartments · 4,320 sq ft · built 1990 · class C0 · owner of record: Joyphoria Llc
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Overdue | Registration expired 2026-09-01 |
| Gas piping inspection (2026 cycle) Likely applies Local Law 152 · During 2026 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 4 is on the 2026 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2026 in 68 days | Due this year |
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 68 days | Keep the report on file (not filed with DOB) |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 68 days | Annual |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 84 days | Annual |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Sep 17, 2026 | Construction CLASS - 1 UNLAWFUL ACTS. FAILURE TO COMPLY WITH COMMISSIONER'S ORDER FOR SUMMONS 39178904Y., COMPLY WITH COMMISSIONER'S ORDER #39204513N | Nov 24, 2026 PENDING | $2,500 |
| Sep 17, 2026 | Construction CLASS - 1 UNLAWFUL ACTS. FAILURE TO COMPLY WITH COMMISSIONER'S ORDER FOR SUMMONS 39178884X., COMPLY WITH COMMISSIONER'S ORDER #39204511J | Nov 24, 2026 PENDING | $2,500 |
| Sep 17, 2026 | Construction CLASS - 1 UNLAWFUL ACTS. FAILURE TO COMPLY WITH COMMISSIONER'S ORDER FOR SUMMONS 39178895L., COMPLY WITH COMMISSIONER'S ORDER #39204510H | Nov 24, 2026 PENDING | $2,500 |
| Sep 17, 2026 | Construction CLASS - 1 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLAINT MANNER FOR 39178919R. OBSERVED GARBAGE BAGS, BUCKETS, GYPSUM BOARDS, AND METAL TUB AT DRIVEWAY (EXP 2) AND REAR YARD (EXP 3)., REPAIR AND/REPLACE #39204512L | Nov 24, 2026 PENDING | $6,250 |
| Mar 2, 2026 | Construction CLASS - 1 WORK WITHOUT A PERMIT: ATOI I OBSERVED AT THE FIRST FLOOR LEVEL UNPERMITTED /UNDOCUMENTED PLUMBING WORK IN THE BATHROOM HOT AND COOL WATER PIPE LINE WASTE LINE WITH SHOWER HEAD, ALSO IN THE KITCHEN HOT AND COOL #39178904Y | Mar 19, 2027 PENDING | $2,500 |
| Mar 2, 2026 | Unknown CLASS - 1 WORK WITHOUT A PERMIT: ATOI I OBSERVED AT 200PM AT THE FIRST FLOOR LEVEL UNPERMITTED/UNDOCUMENTED ELECTRICAL WORK WITH NEW ELECTRICAL PANEL AN APPROX.15 RECESSED LIGHT, OUT AND LIGHT SWITCH THROUGHOUT THE ENTIR #39178895L | Mar 19, 2027 PENDING | $2,500 |
| Mar 2, 2026 | Construction CLASS - 1 WORK WITHOUT A PERMIT: ATOI I OBSERVED AT THE GROUND FLOOR LEVEL A FULLY RENOVATION IN PROGRESS, NEW BATHROOM WAS ERECTED, WITH 3 BEDROOM ADDED LIVING ROOM COVER WITH TILES AND KITCHEN, ABOUT 80 % OF THE WORK W #39178884X | Mar 19, 2027 PENDING | $2,500 |
| Mar 2, 2026 | Construction CLASS - 1 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. ATOI I OBSERVED AT EXPOSURE#3 AT THE REAR YARD AN EXCEED DEBRIS OF CONSTRUCTION GARBAGE, METAL SINK PLUMBING WASTE 2X4 WOOD BLACK GARBAGE BAGS CONSTRUCTION #39178919R | Mar 19, 2027 PENDING | $2,500 |
None open.
| Issued | Violation | Status |
|---|---|---|
| Oct 31, 2025 | Gas Piping - LL152 FTF-PL-PER Cycle 1, Sub-cycle C (premises is in Community District 4) | Active |
None open.
| Date | Source | What | Now |
|---|---|---|---|
| Sep 17, 2026 | ECB | Construction: UNLAWFUL ACTS. FAILURE TO COMPLY WITH COMMISSIONER'S ORDER FOR SUMMONS 39178904Y., COMPLY WITH COMMISSIONER'S ORDER | Open |
| Sep 17, 2026 | ECB | Construction: UNLAWFUL ACTS. FAILURE TO COMPLY WITH COMMISSIONER'S ORDER FOR SUMMONS 39178884X., COMPLY WITH COMMISSIONER'S ORDER | Open |
| Sep 17, 2026 | ECB | Construction: UNLAWFUL ACTS. FAILURE TO COMPLY WITH COMMISSIONER'S ORDER FOR SUMMONS 39178895L., COMPLY WITH COMMISSIONER'S ORDER | Open |
| Sep 17, 2026 | ECB | Construction: FAILURE TO MAINTAIN BUILDING IN CODE-COMPLAINT MANNER FOR 39178919R. OBSERVED GARBAGE BAGS, BUCKETS, GYPSUM BOARDS, AND METAL TUB AT DRIVEWAY (EXP 2) AND REAR YARD (EXP 3)., REPAIR AND/REPLACE | Open |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Oct 24, 2026, 5:14 AM ET. BBL 4015510048.