2 floors · 2,200 sq ft · built 1908 · class K2 · owner of record: Yms Properties Llc
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 68 days | Keep the report on file (not filed with DOB) |
| Gas piping inspection (2027 cycle) Likely applies Local Law 152 · During 2027 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 11 is on the 2027 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2027 in 433 days | Next cycle year 2027 |
| Annual boiler inspection (1 boiler) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-09-28 (Accepted). Agency page | On file | 2026 reports accepted |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Sep 28, 2026 | Construction CLASS - 1 UNLAWFUL ACTS. FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER. FAILURE TO OBTAIN PERMITS OR FILE CERTIFICATE OF CORRECTIONS FOR VIO#39188597M., COMPLY WITH COMMISSIONER'S ORDER #39205867P | Dec 8, 2026 PENDING | $2,500 |
| Sep 28, 2026 | Construction CLASS - 2 FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER TO FILE A CERTIFICATE OF CORRECTION WITH THE DEPT OF BUILDINGS FOR SUMMONS #39188596K., FILE A CERTIFICATE OF CORRECTION #39205868R | Dec 8, 2026 PENDING | $1,250 |
| Jun 10, 2026 | Construction CLASS - 1 FAILURE TO OBEY VACATE ORDER # 4A34837, ISSUED AT 05-14-2026 FOR ENTIRE 2ND FLOOR. AT TIME OF INSPECTION, OBSERVED, BUILDING 2ND FLOOR REAR SIDE IS OCCUPIED AND PEOPLES ARE COME IN & OUT FOR THEIR OFFICE AND OT #39192108Y | Feb 23, 2027 PENDING | $10,000 |
| May 14, 2026 | Construction CLASS - 1 AT 2ND FLOOR CREATED 4 ROOMS, 2 BEDROOMS OBSERVED AND FULL BATH. BUILDING LISTED AS STORE. NO SECOND MEANS OF EGRESS OBSERVED., DISCONTINUE ILLEGAL OCCUPANCY OR AMEND C OF O; VACATE 2ND FLOOR FORTHWITH #39188596K | Jul 21, 2026 DEFAULT | $12,500 |
| May 14, 2026 | Construction CLASS - 1 AT TIME OF INSPECTION OBSERVED AT 2ND FLOOR, 4 ROOMS CREATED WITH FULL HEIGHT PARTITIONS, INSTALLED WATER AND WASTE LINE FOR 3 PC. BATH(BOWL,SINK, SHOWER, INSTALLED ELECTRIC LINES FOR SWITCHES,PLUGS AND FIXTURE #39188597M | Jul 21, 2026 DEFAULT | $12,500 |
| Issued | Violation | Status |
|---|---|---|
| Sep 23, 2024 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL LOW PRESSURE INSPECTION #16205 | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Sep 23, 2024 | Boiler LBLVIO Violation Issued-Failure To File 2023 External Low Pressure Inspection Report | Active |
None open.
| Date | Source | What | Now |
|---|---|---|---|
| Sep 28, 2026 | ECB | Construction: UNLAWFUL ACTS. FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER. FAILURE TO OBTAIN PERMITS OR FILE CERTIFICATE OF CORRECTIONS FOR VIO#39188597M., COMPLY WITH COMMISSIONER'S ORDER | Open |
| Sep 28, 2026 | ECB | Construction: FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER TO FILE A CERTIFICATE OF CORRECTION WITH THE DEPT OF BUILDINGS FOR SUMMONS #39188596K., FILE A CERTIFICATE OF CORRECTION | Open |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Oct 24, 2026, 9:59 PM ET. BBL 4062880005.