Queens · Block 5031 · Lot 13 · 11354

40-09 149 Place

2 floors · 2 apartments · 2,400 sq ft · built 1915 · class S2 · owner of record: Young & Duk, Inc

5open violations
$0ECB/OATH penalties owed
1HPD class C (immediately hazardous)
65dto Annual boiler inspection (1 boiler)

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 65 days
Keep the report on file (not filed with DOB)
Annual boiler inspection (1 boiler) Applies
Boiler inspection · By December 31 each year
What this is

Boilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2025-12-11 (Accepted). Agency page

Dec 31, 2026
in 65 days
1 of 1 without an accepted 2026 report yet
Annual property registration Check
HPD registration · September 1 each year
What this is

Residential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page

Sep 1, 2027
in 309 days
Required only if the owner doesn't live there
Gas piping inspection (2029 cycle) Likely applies
Local Law 152 · During 2029
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 7 is on the 2029 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2029
in 1161 days
Next cycle year 2029

Open violations

ECB / OATH (1)
IssuedViolationHearingBalance
Jul 30, 2010Construction CLASS - 2
WORK DOES NOT CONFORM TO APPROVED CONSTRUCTION DOCUMENTS/AMENDMENTS FOR THIS PRO CERT ALT II JOB #410025841 DWG:6/14/10.NOTED 1)"L" SHAPE REAR EXTENSION,APPROX 20' * 3' TO 10' * 8'-6" HIGH,BUILT W/COMBUSTIBLE M
#34848619N
Oct 25, 2011
IN VIOLATION
$0
DOB (1)
IssuedViolationStatus
Apr 30, 2009CONSTRUCTION

#0701CD
DOB VIOLATION - ACTIVE
DOB NOW Safety (0)

None open.

HPD (3) · C 1 · B 2 · A 0
IssuedClassViolationCorrect by
Apr 15, 2008BApt 2FLR · SECTION 27-2005 ADMIN. CODE: PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE REGLAZING AT SINK IN THE KITCHEN LOCATED AT APT 2FLR, 2nd STORY, APARTMENT AT EASTMay 20, 2008
Apr 15, 2008BApt 2FLR · SECTION 27-2046.1, 2046.2 HMC: PROVIDE AN APPROVED AND OPERATIONAL CARBON MONOXIDE DETECTING DEVICE, INSTALLED IN ACCORDANCE WITH APPLICABLE LAW AND RULES. IN THE ENTIRE APARTMENT LOCATED AT APT 2FLR, 2nd STORY, APARTMENT AT EASTMay 20, 2008
Apr 15, 2008CSECTION 27-2005 ADMIN. CODE: REMOVE THE ILLEGAL FASTENING DOUBLE CYLINDER KEY OPERATING LOCK AT SECURITY METAL GATE AT ENTRANCE TO BUILDINGApr 21, 2008

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Oct 27, 2026, 10:23 AM ET. BBL 4050310013.

Look up another building