5 floors · 89,873 sq ft · built 1917 · class W1 · owner of record: Nyc Department Of Education
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 68 days | Keep the report on file (not filed with DOB) |
| Energy and water benchmarking Likely applies Local Law 84 · May 1 each year What this isBuildings over 25,000 sq ft (this lot shows 89,873 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page | May 1, 2027 in 189 days | Annual filing |
| Building emissions report Likely applies Local Law 97 · May 1 each year (extensions available) What this isCovered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page | May 1, 2027 in 189 days | Annual filing |
| Gas piping inspection (2028 cycle) Likely applies Local Law 152 · During 2028 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 3 is on the 2028 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2028 in 799 days | Next cycle year 2028 |
| Energy audit and retro-commissioning (2030) Likely applies Local Law 87 · Calendar year 2030 What this isBuildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 2930). Agency page | Dec 31, 2030 in 1529 days | Next due 2030 |
| Annual boiler inspection (3 boilers) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-04-23 (Accepted). Agency page | On file | 2026 reports accepted |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Jul 8, 2026 | Construction CLASS - 2 FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER.NOTED:AT 1ST FL EXIT 5,STAIR H,CAFETERIA HALLWAY SMOKE DOOR NEAR RM 103A 2ND FL STAIR G 3RD FL STAIR J,F ALL DOORS ARE IN DISREPAIR/RACKED.REM:REPAIR AND/OR #35734757M | Aug 7, 2026 POP/IN-VIO | $0 |
| Jul 8, 2026 | Construction CLASS - 2 REISSUE ECB#35725100N EXIT DOOR NOT SELF CLOSING.NOTED:AT 1ST FL EXIT 4,12,13,8,3 ALL DOORS IN DISREPAIR/NOT CLOSING WHEN TESTED.REM:REPAIR/REPLACE DOOR. #35734755Z | Aug 7, 2026 POP/IN-VIO | $0 |
| Jul 8, 2026 | Construction CLASS - 2 REISSUE ECB#35725102R FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER.NOTED:AT ROOF BULKHEAD/STAIRS J,H WATER DAMAGE TO CEILING/WALL WITH SPALLING PLASTER/PAINT THROUGHOUT VARIOUS AREAS.REM:REPAIR AND/OR #35734754R | Aug 7, 2026 POP/IN-VIO | $0 |
| Jul 8, 2026 | Construction CLASS - 2 REISSUE ECB#35725103Z FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER.ILLUMINATION FOR EXITS,EXIT DISCHARGES AND PUBLIC CORRIDORS PER BC 1006.1;27-381.NOTED:AT 1ST FL PLAY AREA GYM RM 102A AND 103A 2ND FL #35734756K | Aug 7, 2026 POP/IN-VIO | $0 |
| Jul 8, 2026 | Construction CLASS - 2 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER.NOTED:AT ROOF BULKHEAD/STAIR B HANDRAIL DISCONNECTED/BROKEN.REM:REPAIR AND/OR REPLACE. #35734758Y | Aug 7, 2026 POP/IN-VIO | $0 |
| Aug 22, 2025 | Construction CLASS - 2 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. ILLUMINATION FOR EXITS. EXIT DISCHARGES AND PUBLIC CORRIDORS PER BC 1006.1; 27-381. AT THE TIME OF INSPECTION OBSERVED AND NOTED AT 2ND FL. LEVEL AUDITORIU #35725103Z | Sep 12, 2025 POP/IN-VIO | $0 |
| Aug 22, 2025 | Construction CLASS - 2 REISSUE: 35688690M DATE OF ISSUE: 08-28-24. EXIT DOOR NOT SELF-CLOSINGPROPERLY. AT TIME OF INSPECTION OBSERVED AND NOTED AT 2ND FL. AUDITORIUM MAIN ENTRANCE 2 EXIT DOORS, AT 1ST FLOOR GYM(102A) MAIN ENT. 1 EXIT #35725100N | Sep 12, 2025 POP/IN-VIO | $0 |
| Aug 22, 2025 | Construction CLASS - 2 REISSUE: 35725101P DATE OF ISSUE: 08-28-24. FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. AT THE TIME OF INSPECTION OBSERVED AND NOTED AT STAIRCASE J BULKHEAD AND STAIRCASE 'D' BULKHEAD LEVEL SPALLING #35725102R | Sep 12, 2025 POP/IN-VIO | $0 |
| Aug 28, 2024 | Construction CLASS - 2 REISSUE: 35672212L. DATE OF ISSUE: 02/03/2023. EXIT DOOR NOT SELF-CLOSING PROPERLY AT THE TIME OF INSPECTION, I OBSERVED THAT AT EXIT 12 OUTSIDE TWO EXITS DOORS AT EXIT 13 OUTSIDE 2 EXIT DOORS. AT AUDITORIUM TW #35688690M | Oct 11, 2024 POP/IN-VIO | $0 |
| Aug 28, 2024 | Construction CLASS - 2 REISSUE#3567215R DATE OF ISSUE:02.03.2023 FAILURE TO MAINTAIN BUILDINGIN CODE COMPLIANT MANNER AT THE TIME OF INSPECTION OBSERVED THAT AT STAIRCASE J BULKHEAD LEVEL SPALLING PLASTER AND VERTICAL CRACKS ALONG IN #35688687L | Nov 1, 2024 POP/IN-VIO | $0 |
| Feb 3, 2023 | Construction CLASS - 2 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER.OBSERVED AT STAIRCASE "J" BULKHEAD LEVEL SPALLING PLASTER AND VERTICAL CRACKS ALONG INTERIOR WINDOW WALL.AT STAIRCASE "IT" BETWEEN 4TH & 3RD FLOORS.SEVERAL #35672215R | May 5, 2023 POP/IN-VIO | $0 |
| Feb 3, 2023 | Construction CLASS - 2 REISSUE#35643184K EXIT DOORS NOT SELF CLOSING AT EXIT 12,DOOR DOES NOTCLOSE FULLY BY ITSELF.AT EXIT 13,BOTH DOORS STAY OPEN AND WILL NOT CLOSE BY THEMSELVES.REM:REPAIR/REPLACE. #35672212L | May 5, 2023 POP/IN-VIO | $0 |
| Issued | Violation | Status |
|---|---|---|
| Nov 14, 2025 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION #06263 | DOB VIOLATION - ACTIVE |
| Nov 14, 2025 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION #06264 | DOB VIOLATION - ACTIVE |
| Nov 14, 2025 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION #06262 | DOB VIOLATION - ACTIVE |
| Jun 20, 2023 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL LOW PRESSURE INSPECTION #30233 | DOB VIOLATION - ACTIVE |
| Jun 20, 2023 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL LOW PRESSURE INSPECTION #43738 | DOB VIOLATION - ACTIVE |
| Jun 20, 2023 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL LOW PRESSURE INSPECTION #44565 | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Nov 14, 2025 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION | Active |
| Nov 14, 2025 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION | Active |
| Nov 14, 2025 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2022 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2020 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2021 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2020 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2022 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2022 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2020 External Inspection Affirmation of Correction for LP Device | Active |
| Jun 20, 2023 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL LOW PRESSURE INSPECTION | Active |
| Jun 20, 2023 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL LOW PRESSURE INSPECTION | Active |
| Jun 20, 2023 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL LOW PRESSURE INSPECTION | Active |
None open.
| Date | Source | What | Now |
|---|---|---|---|
| Jul 8, 2026 | ECB | Construction: FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER.NOTED:AT 1ST FL EXIT 5,STAIR H,CAFETERIA HALLWAY SMOKE DOOR NEAR RM 103A 2ND FL STAIR G 3RD FL STAIR J,F ALL DOORS ARE IN DISREPAIR/RACKED.REM:REPAIR AND/OR | Open |
| Jul 8, 2026 | ECB | Construction: REISSUE ECB#35725100N EXIT DOOR NOT SELF CLOSING.NOTED:AT 1ST FL EXIT 4,12,13,8,3 ALL DOORS IN DISREPAIR/NOT CLOSING WHEN TESTED.REM:REPAIR/REPLACE DOOR. | Open |
| Jul 8, 2026 | ECB | Construction: REISSUE ECB#35725102R FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER.NOTED:AT ROOF BULKHEAD/STAIRS J,H WATER DAMAGE TO CEILING/WALL WITH SPALLING PLASTER/PAINT THROUGHOUT VARIOUS AREAS.REM:REPAIR AND/OR | Open |
| Jul 8, 2026 | ECB | Construction: REISSUE ECB#35725103Z FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER.ILLUMINATION FOR EXITS,EXIT DISCHARGES AND PUBLIC CORRIDORS PER BC 1006.1;27-381.NOTED:AT 1ST FL PLAY AREA GYM RM 102A AND 103A 2ND FL | Open |
| Jul 8, 2026 | ECB | Construction: FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER.NOTED:AT ROOF BULKHEAD/STAIR B HANDRAIL DISCONNECTED/BROKEN.REM:REPAIR AND/OR REPLACE. | Open |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Oct 24, 2026, 9:50 AM ET. BBL 2029300001.