6 floors · 21 apartments · 26,400 sq ft · built 1927 · class C1 · owner of record: 400 Webster Housing Development Fund Co.
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 47 days | Keep the report on file (not filed with DOB) |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 47 days | Annual |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 63 days | Annual |
| Energy and water benchmarking Likely applies Local Law 84 · May 1 each year What this isBuildings over 25,000 sq ft (this lot shows 26,400 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page | May 1, 2027 in 168 days | Annual filing |
| Building emissions report Likely applies Local Law 97 · May 1 each year (extensions available) What this isCovered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page | May 1, 2027 in 168 days | Annual filing |
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Sep 1, 2027 in 291 days | Registered through 2027-09-01 |
| Gas piping inspection (2029 cycle) Likely applies Local Law 152 · During 2029 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 7 is on the 2029 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2029 in 1143 days | Next cycle year 2029 |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Jan 29, 2025 | Construction CLASS - 2 FAILURE TO COMPLY WITH COMMISSIONER'S ORDER CONTAINED IN SUMMONS #35662360Y ISSUED ON 04/10/2023, AND FAILURE TO FILE A CERTIFICATE OF CORRECTION PURSUANT TO 28.201.1 AND 1 RCNY 102-01(D)(2). AN ACCEPTABLE CERT #37032704P | Apr 18, 2025 DEFAULT | $3,125 |
| Apr 10, 2023 | Construction CLASS - 2 FAILURE TO MAINTAIN BUILDING WALL(S) OR APPURTENANCES.NOTE:AT TIME OF INSPECTION OBSERVED SPALLING PARAPET OF EXTERIOR WALL ON EXP #1 RESEARCH APPEARED AROUND JUNE 2018 RESEARCH JOB #240110269 OBTAIN PERMIT ON #35662360Y | Jun 16, 2023 STIPULATION/IN-VIO | $630 |
None open.
None open.
| Issued | Class | Violation | Correct by |
|---|---|---|---|
| Jan 28, 2026 | C | Apt 52 · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 52, 6th STORY, 1st APARTMENT FROM NORTH AT EAST | Feb 23, 2026 |
| Jan 28, 2026 | C | Apt 12 · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 12, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST | Feb 23, 2026 |
| Jan 28, 2026 | A | Apt 12 · § 27-2026 ADM CODE REPAIR LEAKY WATER CLOSET FLUSH PIPE CONNECTION AT TOILET IN THE BATHROOM LOCATED AT APT 12, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST | May 3, 2026 |
| Jan 30, 2025 | A | § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE CEILING AT PUBLIC HALL, 6th STORY | May 5, 2025 |
| Jan 30, 2025 | A | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE FIRE RETARDENT MATERIAL AT CEILING AT PUBLIC HALL, 6th STORY | May 5, 2025 |
| Jan 30, 2025 | C | Apt 21 · § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE HINGES IN THE ENTRANCE LOCATED AT APT 21, 3rd STORY, 22nd APARTMENT FROM NORTH AT EAST | Feb 13, 2025 |
| Feb 13, 2024 | B | Apt 34 · § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 34, 4th STORY, 1st APARTMENT FROM EAST AT SOUTH | Mar 19, 2024 |
| Feb 13, 2024 | B | Apt 3 · § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 3, 1st STORY, 1st APARTMENT FROM EAST AT SOUTH | Mar 19, 2024 |
| Feb 7, 2024 | C | Apt 51 · § 27-2056.4 ADM CODE- CORRECT FAILURE TO NOTIFY OCCUPANTS AND/OR TO INVESTIGATE LEAD-BASED PAINT HAZARDS. | Feb 11, 2024 |
| Feb 7, 2024 | C | Apt 51 · § 27-2056.7 ADM CODE: CORRECT FAILURE TO PROVIDE TO THE DEPARTMENT WITHIN 45 DAYS OF DEMAND ALL RECORDS REQUIRED TO BE MAINTAINED BY OWNER PURSUANT TO LOCAL LAW 1 OF 2004 RELATED TO LEAD-BASED PAINT NOTICES, INSPECTIONS AND REMEDIATION/ABATEMENT ACTIVITIES. | Feb 11, 2024 |
| Dec 8, 2023 | A | Apt 51 · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE 1st ROOM FROM NORTH AT EAST LOCATED AT APT 51, 6th STORY, 2nd APARTMENT FROM SOUTH AT WEST | Mar 12, 2024 |
| Nov 3, 2023 | C | Apt 42 · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT NORTH WALL IN THE 1st ROOM FROM EAST LOCATED AT APT 42, 4th STORY, 1st APARTMENT FROM WEST AT NORTH | Nov 9, 2023 |
| Nov 3, 2023 | C | Apt 42 · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE 3rd ROOM FROM EAST LOCATED AT APT 42, 4th STORY, 1st APARTMENT FROM WEST AT NORTH | Nov 9, 2023 |
| Nov 3, 2023 | C | Apt 42 · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE KITCHEN LOCATED AT APT 42, 4th STORY, 1st APARTMENT FROM WEST AT NORTH | Nov 9, 2023 |
| Nov 3, 2023 | B | Apt 42 · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE 1st ROOM FROM EAST LOCATED AT APT 42, 4th STORY, 1st APARTMENT FROM WEST AT NORTH | Dec 8, 2023 |
| Apr 8, 2019 | C | Apt 1 · § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... APPROX 10 SQUARE FEET NORTH WALL, APPROX 10 SQUARE FEET WEST WALL, APPROX 10 SQUARE FEET CEILING IN THE BATHROOM LOCATED AT APT 1, 1st STORY, 2nd APARTMENT FROM WEST AT NORTH | Apr 29, 2019 |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Nov 14, 2026, 11:50 AM ET. BBL 2032790034.