Manhattan · Block 195 · Lot 7 · 10013

396 Broadway

10 floors · 61,219 sq ft · built 1899 · class H2 · owner of record: Bridgeton 396 Broadway Fee Llc

11open violations
$800ECB/OATH penalties owed
0HPD class C (immediately hazardous)
122dto Facade inspection report (Cycle 10A)

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 70 days
Keep the report on file (not filed with DOB)
Facade inspection report (Cycle 10A) Applies
Local Law 11 / FISP · Feb 21, 2025 to Feb 21, 2027
What this is

Buildings taller than six stories file a facade inspection report by a QEWI once every five-year cycle. Tax blocks ending in 4, 5, 6 or 9 are in sub-cycle 10A. DOB facade records for this building show $744,000 in late-filing or failure-to-file penalties. Agency page

Feb 21, 2027
in 122 days
No Cycle 10 report on record yet
Energy and water benchmarking Likely applies
Local Law 84 · May 1 each year
What this is

Buildings over 25,000 sq ft (this lot shows 61,219 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page

May 1, 2027
in 191 days
Annual filing
Building emissions report Likely applies
Local Law 97 · May 1 each year (extensions available)
What this is

Covered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page

May 1, 2027
in 191 days
Annual filing
Gas piping inspection (2028 cycle) Likely applies
Local Law 152 · During 2028
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 1 is on the 2028 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2028
in 801 days
Next cycle year 2028
Energy audit and retro-commissioning (2035) Likely applies
Local Law 87 · Calendar year 2035
What this is

Buildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 195). Agency page

Dec 31, 2035
in 3357 days
Next due 2035

Open violations

ECB / OATH (3) · $800 owed
IssuedViolationHearingBalance
Apr 20, 2026Local Law CLASS - 2
FAILURE TO FILE ACCEPTABLE AMENDED CYCLE 9A REPORT INDICATING CORRECTION OF UNSAFE CONDITIONS DESCRIBED IN INITIAL FACADES REPORT REQUIRED BY 28-302.5 FOR CONTROL #900432. AGG2 HISTORY OF NONCOMPLIANCE ON 37032
#37036404L
Jul 9, 2026
ADMIT/IN-VIO
$0
Jan 16, 2024Local Law CLASS - 2
FAILURE TO FILE ACCEPTABLE AMENDED CYCLE 9A REPORT INDICATING CORRECTION OF UNSAFE CONDITIONS DESCRIBED IN INITIAL REPORT REQUIRED BY 28-302.5 FOR CONTROL #900432. REMEDY: FILE ACCEPTABLE REPORT.
#37026316M
Apr 18, 2024
ADMIT/IN-VIO
$0
Nov 18, 1991Local Law Non-Hazardous
FAILURE TO PROVIDE PROPER ELEVATOR LANDING SIGNS AT EACH FLOOR. FAILURE TO PROVIDE STAIR IDENTIFICATION SIGNS AT EACH STAIRCASE DOOR (3" LETTER). REMEDY - PROVIDE PROPER SIGNAGE AS PER LOCAL LAW 16/84
#34064340K
Feb 27, 1992
IN VIOLATION
$800
DOB (3)
IssuedViolationStatus
Nov 9, 2022FAILURE TO CORRECT SWARMP CONDITIONS (FACADE)
CYCLE 9A FAILURE TO CORRECT SWARMP CONDITIONS
#00588
DOB VIOLATION - ACTIVE
Nov 9, 2022HAZARDOUS CONDITION (FACADE)
CYCLE 9A UNSAFE REPORT FILED
#910546
DOB VIOLATION - ACTIVE
Feb 22, 2022NO REPORT AND / OR LATE FILING (FACADE)
FAILED TO FILE FISP CYCLE 9A TECHNICAL REPORT BY 02/21/2022
#00026
DOB VIOLATION - ACTIVE
DOB NOW Safety (6)
IssuedViolationStatus
Oct 10, 2025Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2024 Cat1 Test Affirmation of Correction
Active
Oct 10, 2025Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2024 Cat1 Test Affirmation of Correction
Active
Oct 10, 2025Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2024 Cat1 Test Affirmation of Correction
Active
Nov 9, 2022Facades FISPHAZ
CYCLE 9A UNSAFE REPORT FILED
Active
Nov 9, 2022Facades FISPFCS
CYCLE 9A FAILURE TO CORRECT SWARMP CONDITIONS
Active
Feb 22, 2022Facades FISPNRF
FAILED TO FILE FISP CYCLE 9A TECHNICAL REPORT BY 02/21/2022
Active
HPD (0)

None open.

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Oct 22, 2026, 11:19 AM ET. BBL 1001950007.

Look up another building