6 floors · 86 apartments · 106,100 sq ft · built 1928 · class D1 · owner of record: L & L Properties Inc
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Gas piping inspection (2026 cycle) Likely applies Local Law 152 · During 2026 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 8 is on the 2026 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2026 in 47 days | Due this year |
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 47 days | Keep the report on file (not filed with DOB) |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 47 days | Annual |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 63 days | Annual |
| Energy and water benchmarking Likely applies Local Law 84 · May 1 each year What this isBuildings over 25,000 sq ft (this lot shows 106,100 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page | May 1, 2027 in 168 days | Annual filing |
| Building emissions report Likely applies Local Law 97 · May 1 each year (extensions available) What this isCovered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page | May 1, 2027 in 168 days | Annual filing |
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Sep 1, 2027 in 291 days | Registered through 2027-09-01 |
| Energy audit and retro-commissioning (2032) Likely applies Local Law 87 · Calendar year 2032 What this isBuildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 3252). Agency page | Dec 31, 2032 in 2239 days | Next due 2032 |
| Annual boiler inspection (1 boiler) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-10-15 (Accepted). Agency page | On file | 2026 reports accepted |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Feb 20, 2025 | Construction CLASS - 1 FAILURE TO MAINTAIN BLDG EXTERIOR FACADE AND APPURTENANCES. NOTE: AT TIME OF INSPECTION I OBSERVED EXP #1 EAST, #3 WEST, #4 NORTH-CRACKED/SPALLING BRICK/MORTAR JOINTS BY PARAPET LEVEL, AND WINDOW SPANDRELS ALON #35689982Z | Mar 9, 2026 IN VIOLATION | $0 |
| Issued | Violation | Status |
|---|---|---|
| Jun 30, 2026 | CONSTRUCTION FAILURE TO COMPLY WITH COMMISSIONER'S ORDER:DOB VIOLATION #022025CFA08 02DD REQUIRED THE IMMEDIATE 100% HANDS ON INSPECTION OF ALL FACADES BY PE/RA AND SUBMIT A REPORT TO FACADES VIA EMAIL BY 3/7/25.AS OF 6/30/26 NO HANDS ON INSPECTION REPORT SUBMITTED TO FACADES UNIT.REMEDY:COMPLY WITH DOB VIOLATIO #LL20804CM | DOB VIOLATION - ACTIVE |
| Feb 20, 2025 | CONSTRUCTION EWO DUE TO CRACKED/SPALLING BRICK MULTI LOCAT, CRACKED/BULGING BRICK, BRICK PUSHING OFF WINDOW OF 5TH FL WINDOW EXP 1 EAST NORTHEAST END REMDY:IMMEDTLY TAKE/PROVIDE ADEQUATE SAFETY MEAS @ EXP 1 EAST (GOUVERN EUR AVE) & INSTALL PUBLIC PROTECTN. MAKE IMMEDIATE REPAIRS TO DEFECTIV FACADE UNDR THE SUPER #FA0801DD | DOB VIOLATION - ACTIVE |
| Feb 20, 2025 | CONSTRUCTION FTM FACADE & APPURT DUE TO CRACKED/SPALLING BRICK & MORTAR JOINTS MULTI LOCAT & CRACKED BULGIN BRICK EXP1 EAST 5 FL WINDOW.REMDY:RETAIN A NYS RDP WITH QEWI CERTIFICATN TO INSPECT/EVALUATE 100% HANDS ON THE MASONRY FACADE TO DETERMINE CODE COMPLIANCE & ENSURE STABILITY.INSTALL PUBLIC PROTECTN & SUBMI #FA0802DD | DOB VIOLATION - ACTIVE |
| Jan 13, 1997 | LOCAL LAW 10/81 - ELEVATOR #02193 | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Mar 17, 2026 | AEUHAZ FTC-AEU-HAZ | Active |
| Issued | Class | Violation | Correct by |
|---|---|---|---|
| Sep 24, 2025 | C | Apt 5E · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 5E, 5th STORY, 3rd APARTMENT FROM SOUTH AT WEST | Oct 20, 2025 |
| Sep 24, 2025 | C | Apt 5E · § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... MORE THAN 30 SQUARE FEET AT ALL WALLS AND THE CEILING IN THE BATHROOM LOCATED AT APT 5E, 5th STORY, 3rd APARTMENT FROM SOUTH AT WEST | Oct 20, 2025 |
| Apr 28, 2025 | A | § 27-2046.1 HMC: POST A PROPER NOTICE OF CARBON MONOXIDE DETECTING DEVICE REQUIREMENTS, IN A FORM APPROVED BY THE COMMISSIONER, IN A COMMON AREA OF A CLASS A MULTIPLE DWELLING NEAR INSPECTION CERTIFICATE OR PROVIDE NOTICE TO TENANTS IN A PRIVATE DWELLING. | Aug 1, 2025 |
| Aug 25, 2022 | A | Apt 4D · § 27-2026 ADM CODE REPAIR THE LEAKY AND/OR DEFECTIVE FAUCETS AT BATHTUB IN THE BATHROOM LOCATED AT APT 4D, 4th STORY, 2nd APARTMENT FROM NORTH AT EAST | Nov 28, 2022 |
| Aug 25, 2022 | A | Apt 4D · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE SILICONE CAULK AT TILES AROUND BATHTUB IN THE BATHROOM LOCATED AT APT 4D, 4th STORY, 2nd APARTMENT FROM NORTH AT EAST | Nov 28, 2022 |
| Aug 25, 2022 | B | Apt 4D · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE PORCELAIN FINISH AT BATHTUB IN THE BATHROOM LOCATED AT APT 4D, 4th STORY, 2nd APARTMENT FROM NORTH AT EAST | Sep 29, 2022 |
| Aug 25, 2022 | A | Apt 4D · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CERAMIC TILES AT WEST WALL IN THE BATHROOM LOCATED AT APT 4D, 4th STORY, 2nd APARTMENT FROM NORTH AT EAST | Nov 28, 2022 |
| Aug 25, 2022 | A | Apt 4D · § 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION THE STEAM RISER IN THE BATHROOM LOCATED AT APT 4D, 4th STORY, 2nd APARTMENT FROM NORTH AT EAST | Nov 28, 2022 |
| Aug 25, 2022 | B | Apt 4D · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CERAMIC FLOOR TILES IN WALKING AREA IN THE BATHROOM LOCATED AT APT 4D, 4th STORY, 2nd APARTMENT FROM NORTH AT EAST | Sep 29, 2022 |
| Aug 25, 2022 | B | Apt 4D · § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... APPROX 8 SQ FT OF MOLD AT WEST WALL AND 3 SQ FT AT CEILING IN THE BATHROOM LOCATED AT APT 4D, 4th STORY, 2nd APARTMENT FROM NORTH AT EAST | Sep 29, 2022 |
| Aug 25, 2022 | B | Apt 4D · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING AND ALL WALLS IN THE BATHROOM LOCATED AT APT 4D, 4th STORY, 2nd APARTMENT FROM NORTH AT EAST | Sep 29, 2022 |
| Oct 29, 2018 | A | § 27-2005 HMC: POST, IN A FORM APPROVED BY THE COMMISSIONER, AND MAINTAIN A NOTICE IN A COMMON AREA OF THE BUILDING REGARDING THE PROCEDURES THAT SHOULD BE FOLLOWED WHEN A GAS LEAK IS SUSPECTED AT PUBLIC HALL, 1st STORY | Feb 1, 2019 |
| Oct 29, 2018 | A | § 26-1103 ADMIN. CODE: POST AND MAINTAIN A PROPER NOTICE ON WALL OF THE ENTRANCE STORY IN ENGLISH AND SPANISH ON THE AVAILABILITY OF THE AGENCYS HOUSING INFORMATION GUIDE. A SAMPLE NOTICE CAN BE FOUND AT WWW.NYC.GOV/HPD. AT PUBLIC HALL, 1st STORY | Feb 1, 2019 |
| Jul 23, 1991 | C | Apt 5J · SECTION 27-2013 ADM CODE REMOVE OR COVER IN A MANNER APPROVED BY THE DEPARTMENT THE PEELING LEAD PAINT CLG AT EAST ROOM 5TH STY EAST APT 5J CENTER EAST WING MRS O HARA 543 5718 ER1. , SECTION '' '' | Aug 12, 1991 |
| Apr 16, 1991 | B | Apt 5J · SECTION 27-2018 ADM CODE ABATE THE NUISANCE CONSISTING OF VERMIN MICE 5TH STY EAST APT 5J AT CENTER EAST WING KITCHEN & BATHROOM. , SECTION '' '' | Jun 3, 1991 |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Nov 14, 2026, 8:35 PM ET. BBL 2032520260.