3 floors · 3 apartments · 3,024 sq ft · built 2023 · class C0 · owner of record: 389 & 395 Cleveland Street Realty Llc
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 46 days | Keep the report on file (not filed with DOB) |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 46 days | Annual |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 62 days | Annual |
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Overdue | No current registration found |
| Gas piping inspection (2029 cycle) Likely applies Local Law 152 · During 2029 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 5 is on the 2029 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2029 in 1142 days | Next cycle year 2029 |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Jun 26, 2024 | Unknown CLASS - 2 UNEVEN AND CRACKED SIDEWALK-BC 3303.4.11. AT THE TIME OF INSPECTION AT 3 STORY NB I OBSERVED THAT THE SIDEWALK AT THE FRONT OF THE JOB SITE WAS BADLY CRACKED AND UNEVEN CREATING A TRIPPING HAZARD FOR PEDESTRIA #39529963X | Sep 4, 2024 DEFAULT | $5,000 |
| Jun 6, 2023 | Construction CLASS - 1 AT TIME OF INSPECTION OF A PROPOSED 3 STORY BUILDING AT FOUNDATION PHASE WITH SEVERAL ADJACENT PROPERTIES AT EXPOSURE #2,#3 AND #4 I REQUESTED TO SEE THE PRE-CONSTRUCTION SITE SURVEY, NONE WAS PROVIDE. THE LACK #39517513K | Sep 15, 2025 DEFAULT | $6,250 |
| Jun 6, 2023 | Construction CLASS - 1 INSPECTION OF A PROPOSED 3 STORY BUILDING AT FOUNDATION PHASE I OBSERVED THAT THE LAGGING IN PLACE AT EXPOSURE # 4 WAS MISSING IN PLACES AND THE STEEL PILES WERE LEANING AND NOT UPRIGHT TO PROVIDE FOUNDATIONAL #39517511R | Sep 15, 2025 DEFAULT | $6,250 |
| Jun 6, 2023 | Construction CLASS - 1 DURING INSPECTION OF PROPOSED 3 STORY I OBSERVED THAT THE SITE SAFETY PLAN INDICATED THAT A CONSTRUCTION FENCE AT EXPOSURE #1 BUT INSTEAD THERE WAS A BULGING, LEANING AND CRACKED CMU WALL THAT COULD FALL AT ANY #39517512Z | Sep 15, 2025 DEFAULT | $6,250 |
None open.
None open.
None open.
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Nov 15, 2026, 8:57 PM ET. BBL 3039850001.