1 floors · 2,375 sq ft · built 1994 · class G2 · owner of record: Ayala, Augustine
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 44 days | Keep the report on file (not filed with DOB) |
| Gas piping inspection (2028 cycle) Likely applies Local Law 152 · During 2028 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 1 is on the 2028 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2028 in 775 days | Next cycle year 2028 |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Oct 1, 2024 | Construction CLASS - 1 FAILURE TO SUBMIT THE REQUIRED PARKING STRUCTURE INITIAL OBSERVATION REPORT FOR AN EXISTING PARKING STRUCTURE OR A PERIODIC INSPECTION OF A PARKING STRUCTURE(PIPS) REPORT DOCUMENTING THE CONDITIONS OF PSID#B000 #37031584P | Mar 5, 2025 DEFAULT | $12,500 |
| Jul 20, 2021 | Construction CLASS - 2 FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER CONTAINED IN SUMMONS/VIOLATION#35453771J ISSUED ON 12/7/2019 AND TO FILE A CERTIFICATE OF CORRECTION PURSUANT TO 28-201.1 AND 1RCNY 102-01.FOR WORK WITHOUT A PERM #35534278Z | Dec 1, 2021 ADMIT/IN-VIO | $0 |
| Jun 1, 2021 | Construction CLASS - 1 FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER CONTAINED IN SUMMONS/VIOLATION#35453771J ISSUED ON 12/7/2019 AND TO FILE A CERTIFICATE OF CORRECTION PURSUANT TO 28-201.1 AND 1RCNY 102-01.FOR WORK WITHOUT A PERM #35531806J | Apr 20, 2022 DEFAULT | $12,500 |
| Feb 3, 2021 | Construction CLASS - 1 FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER CONTAINED IN SUMMONS/VIOLATION#35453771H ISSUED ON 12/7/2019 AND TO FILE A CERTIFICATE OF CORRECTION PURSUANT TO 28-201.1 AND 1RCNY 102-01.DEMO WORK,STEEL WORK,AN #35526541R | Jul 14, 2021 IN VIOLATION | $6,250 |
| Oct 20, 2020 | Construction CLASS - 1 FAILURE TO COMPLY W/THE COMMISSIONER'S ORDER CONTAINED IN SUMMONS/VIOLATION #35453771H ISSUED ON 12/7/19 & TO FILE A CERTIFICATE OF CORRECTION PURSUANT TO 28-201.1 & 1RCNY 102-01.REMEDY:COMPLY W/COMMISSIONER'S #35521902K | Apr 2, 2021 IN VIOLATION | $2,500 |
| Dec 7, 2019 | Construction CLASS - 1 WORK WITHOUT PERMIT:AT ABOVE LOCATION PERFORMING DEMOLITION OF EXISTING STEEL FRAME STRUCTURE AND ROOF AT TIME OF INSPECTION,NO PERMIT(S) ONFILE.REMEDY:STOP ALL WORK AND OBTAIN PERMIT(S) #35453771H | Apr 8, 2020 ADMIT/IN-VIO | $0 |
| Issued | Violation | Status |
|---|---|---|
| Mar 4, 2020 | FAIL TO CERTIFY CLASS 1 FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION #00611 | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Sep 23, 2026 | Parking Structures FTF-PS-INITL Failure to file parking structures compliance report by 12/31/2025 as required per 1 RCNY 103-13 | Active |
| Jan 8, 2026 | Gas Piping - LL152 FTF-PL-PER Cycle 2, Sub-cycle A (premises is in Community District 1) | Active |
| Mar 4, 2020 | AEUHAZ FTC-AEU-HAZ | Active |
None open.
| Date | Source | What | Now |
|---|---|---|---|
| Sep 23, 2026 | DOB Safety | Parking Structures: Failure to file parking structures compliance report by 12/31/2025 as required per 1 RCNY 103-13 | Open |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Nov 17, 2026, 4:09 PM ET. BBL 3024380029.