Brooklyn · Block 993 · Lot 6 · 11215

393 4 Avenue

13 floors · 51 apartments · 71,644 sq ft · built 2012 · class D7 · owner of record: 278 6th St., Llc

7open violations
$0ECB/OATH penalties owed
0HPD class C (immediately hazardous)
66dto Gas piping inspection (2026 cycle)

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Gas piping inspection (2026 cycle) Likely applies
Local Law 152 · During 2026
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 6 is on the 2026 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2026
in 66 days
Due this year
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 66 days
Keep the report on file (not filed with DOB)
Bedbug annual filing Applies
Local Law 69 · December 1 to 31 each year
What this is

Owners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page

Dec 31, 2026
in 66 days
Annual
Annual notice: window guards and lead paint Applies
HPD / Health Code · January 1 to 16 each year
What this is

Deliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page

Jan 16, 2027
in 82 days
Annual
Energy and water benchmarking Likely applies
Local Law 84 · May 1 each year
What this is

Buildings over 25,000 sq ft (this lot shows 71,644 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page

May 1, 2027
in 187 days
Annual filing
Building emissions report Likely applies
Local Law 97 · May 1 each year (extensions available)
What this is

Covered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page

May 1, 2027
in 187 days
Annual filing
Annual property registration Applies
HPD registration · September 1 each year
What this is

Residential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page

Sep 1, 2027
in 310 days
Registered through 2027-09-01
Facade inspection report (Cycle 10C) Applies
Local Law 11 / FISP · Feb 21, 2027 to Feb 21, 2029
What this is

Buildings taller than six stories file a facade inspection report by a QEWI once every five-year cycle. Tax blocks ending in 1, 2 or 3 are in sub-cycle 10C. DOB facade records for this building show $304,520 in late-filing or failure-to-file penalties. Agency page

Feb 21, 2029
in 849 days
Filing window not open yet
Energy audit and retro-commissioning (2033) Likely applies
Local Law 87 · Calendar year 2033
What this is

Buildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 993). Agency page

Dec 31, 2033
in 2623 days
Next due 2033
Annual boiler inspection (2 boilers) Applies
Boiler inspection · By December 31 each year
What this is

Boilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-03-26 (Accepted). Agency page

On file2026 reports accepted

Open violations

ECB / OATH (2)
IssuedViolationHearingBalance
Oct 15, 2025Construction CLASS - 2
FAILURE TO MAINTAIN EXTERIOR BUILDING FACADE AND APPURTENANCES. NOTE:-AT THE TIME OF INSPECTION: OBSERVED CRACKS STUCCO AT PARAPET WALL AND WINDOW LINTEL AT EXPOSURE #3(COURTYARD ROOF LEVEL). REMEDY: MAINTAIN E
#35717762M
Dec 24, 2025
IN VIOLATION
$0
Aug 14, 2025Construction CLASS - 2
FAILURE TO MAINTAIN BUILDING WALL"S" AND APPURTENANCES. NOTE: AT THE TIME OF INSPECTION I OBSERVED AT EX #4 WEST ELEVATION, CRACKED AND SPALLING CONCRETE SLAB AT 6TH FLOOR. CRACKED CONCRETE SLAB AT 11TH FLOOR A
#35694007J
Oct 22, 2025
IN VIOLATION
$0
DOB (2)
IssuedViolationStatus
Mar 4, 2024HAZARDOUS CONDITION (FACADE)
CYCLE 9C UNSAFE REPORT FILED
#911916
DOB VIOLATION - ACTIVE
Feb 22, 2024NO REPORT AND / OR LATE FILING (FACADE)
FAILED TO FILE FISP CYCLE 9C TECHNICAL REPORT BY 2/21/2024
#01272
DOB VIOLATION - ACTIVE
DOB NOW Safety (3)
IssuedViolationStatus
Sep 23, 2026Parking Structures FTF-PS-INITL
Failure to file parking structures compliance report by 12/31/2025 as required per 1 RCNY 103-13
Active
Mar 4, 2024Facades FISPHAZ
CYCLE 9C UNSAFE REPORT FILED
Active
Feb 22, 2024Facades FISPNRF
FAILED TO FILE FISP CYCLE 9C TECHNICAL REPORT BY 2/21/2024
Active
HPD (0)

None open.

Issued in the last 120 days

DateSourceWhatNow
Sep 23, 2026DOB SafetyParking Structures: Failure to file parking structures compliance report by 12/31/2025 as required per 1 RCNY 103-13Open

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Oct 26, 2026, 10:56 PM ET. BBL 3009930006.