6 floors · 8 apartments · 6,949 sq ft · built 2024 · class R1 · owner of record: 392 Graham Development Llc
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 51 days | Keep the report on file (not filed with DOB) |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 51 days | Annual |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 67 days | Annual |
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Sep 1, 2027 in 295 days | Registered through 2027-09-01 |
| Gas piping inspection (2028 cycle) Likely applies Local Law 152 · During 2028 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 1 is on the 2028 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2028 in 782 days | Next cycle year 2028 |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Aug 23, 2023 | Construction CLASS - 1 @ THE TIME OF INSPECTION 6 STORIES NB OBSERVED EXTERIOR WORK NOT DONE @ EXP#2,4 AND STRIPPING FORM IN PROGRESS ON 5,6 FLOORS AND PREPARING TO POUR CONCRETE FOR SHEAR WALL @ BULKHEAD WHICH ON EXP#4 WITH INADEQUA #39520906Z | Jan 17, 2024 DEFAULT | $6,250 |
| Aug 23, 2023 | Construction CLASS - 1 @ THE TIME OF INSPECTION 6 STORIES NB OBSERVED GUARD RAIL SYSTEM WERE INADEQUATE MISSING TOE BOARD AND SOME LOCATION MISSING MID RAIL @ EXP#3 AND @ STAIRCASE AREA PROVIDE ADEQUATE GUARD RAIL SYSTEM @ ALL OPEN P #39520910L | Jan 17, 2024 DEFAULT | $12,500 |
| Aug 23, 2023 | Unknown CLASS - 2 @ THE TIME OF INSPECTION 6 STORIES NB OBSERVED EXTERIOR WORK FOR INSTALLING WALL AND STRIPPING FORMS AND PREPARING FOR CONCRETE OPERATIONS TO POUR SHEAR WALLS ON BULKHEAD AND WITH ALL OF THESE HEAVY CONSTRUCTIO #39520905R | Jan 17, 2024 DEFAULT | $6,250 |
| Aug 23, 2023 | Construction CLASS - 1 @ THE TIME OF INSPECTION 6 STORIES NB OBSERVED EXTERIOR WORK INSTALLING EXTERIOR WALLS EXP#4, AND STRIPPING MATERIAL AND FORM FOR SLAB 5TH,6TH FLOOR, PREPARING TO POUR SHEAR WALLS @ BULKHEAD ON EDGE OF EXP#4 NE #39520907K | Jan 17, 2024 DEFAULT | $6,250 |
| Aug 23, 2023 | Construction CLASS - 1 @ THE TIME OF INSPECTION 6 STORIES NB OBSERVED WORKER STANDING ON LADDER INSTALLING FRAMING @ CELLING ON LEANING EDGE AND TIE OFF TO THE STRAP WITH INADEQUATE EQUIPMENT DOESN'T HAS SHOCK ABSORBING LANYARD WHICH #39520902L | Jan 17, 2024 DEFAULT | $6,250 |