6 floors · 37 apartments · 36,540 sq ft · built 1927 · class D1 · owner of record: Mosholu Partners I Llc
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 62 days | Keep the report on file (not filed with DOB) |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 62 days | Annual |
| Annual boiler inspection (1 boiler) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2024-08-06 (Accepted). Agency page | Dec 31, 2026 in 62 days | 1 of 1 without an accepted 2026 report yet |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 78 days | Annual |
| Energy and water benchmarking Likely applies Local Law 84 · May 1 each year What this isBuildings over 25,000 sq ft (this lot shows 36,540 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page | May 1, 2027 in 183 days | Annual filing |
| Building emissions report Likely applies Local Law 97 · May 1 each year (extensions available) What this isCovered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page | May 1, 2027 in 183 days | Annual filing |
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Sep 1, 2027 in 306 days | Registered through 2027-09-01 |
| Gas piping inspection (2029 cycle) Likely applies Local Law 152 · During 2029 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 7 is on the 2029 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2029 in 1158 days | Next cycle year 2029 |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Sep 16, 2026 | Construction CLASS - 1 FAILURE TO COMPLY WITH COMMISSIONER'S ORDER DOB PARAPET VIO 042326PI20703HZ AND DOB CONTROL #348547 DATED 04/23/2026. NO COMPLIANCE ON FILE FOR ANNUAL PARAPET OBSERVATION REPORT. REMEDY: COMPLY WITH THE COMMISS #35733235K | Dec 4, 2026 PENDING | $2,500 |
| Jul 10, 2026 | Construction CLASS - 1 FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER, DOB FTC CONTROL #370530, DOB FTC VIO #060426PI20701SB, DATED 06/04/26. NO COMPLIANCE ON FILE FOR A CORRECTIVE ACTION PLAN. REMEDY: COMPLY WITH THE COMMISSIONER'S #35718618M | Mar 12, 2027 PENDING | $2,500 |
| Apr 27, 2026 | Construction CLASS - 1 FAILURE TO MAINTAIN BLDG EXTERIOR FACADE AND APPURTENANCES. NOTE: AT TIME OF INSPECTION I OBSERVED EXP #1 WEST (1)CRACKED/SPALLING COPING STONE MULTI LOC. (2)CRACKED/DETERIORATED WOOD CORNICE/SHINGLES.-EXP #2 N #35729805L | Nov 27, 2026 PENDING | $5,000 |
| Apr 23, 2026 | Construction CLASS - 1 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. I OBSERVED HAZARDOUS CONDITIONS ALONG EXPOSURE ONE-FACING EAST MOSHOLU PKWY EAST. WOOD BASE CORNICE ATTACHED TO THE PARAPET WALL AT FRONT ELEVATION. DETERI #35718972P | Nov 27, 2026 PENDING | $2,500 |
| Issued | Violation | Status |
|---|---|---|
| Jun 4, 2026 | CONSTRUCTION FTC W/COMMISSIONER'S ORDER CONTROL#348546 VIO#042326PI20702HZ DATED 04/23/26 REQUIRIDNG OWNER TO PROVIDE A CORRECTIVE ACTION PLAN BY 04/30/26 AS OF 06/04/26 THE REQ'D CAP WAS NOT REC'D. IMMED COMPLY W/COMMISSIONER'S ORDER VIO#042326PI20702HZ CONTROL#348546 #PI20701SB | DOB VIOLATION - ACTIVE |
| Apr 27, 2026 | CONSTRUCTION EMERGENCY WORK ORDER DUE TO MULTIPLE HAZARDOUS FACADE CONDITION SUCH A S EXP1 WEST:DETERIORATING/SPALLING COPING STONES WITH LOOSE MATERIAL D ETERIORATED WOOD CORNICE.EXP4 SOUTH:EXTENSIVE CRACKS AT PARAPET LEVEL EAST FACING WALL.EXP3 EAST:DEFECTIVE FIRE ESCAPE DROP LADDER.REMEDY:PR OVIDE SAFETY MEAS #FA0701DD | DOB VIOLATION - ACTIVE |
| Apr 23, 2026 | CONSTRUCTION FTM BLDG IN A CODE COMPLIANT MANNER-OBSVD WOOD BASED CONICE W/SLATE ROOFING DETRIORATING W/MISSING PARTS AND IS DISLODGED FROM PARAPET WALL @ EXP1. AN ANNUAL PARAPET OBSERVATION REPORT IS REQ'D TO BE COMPLETED ANNUALLY STARTING IN JAN 2024. SUBMIT THE ANNUAL PARAPET OBSERVATION REPORT FOR 2025 & TO #PI20703HZ | DOB VIOLATION - ACTIVE |
| Apr 23, 2026 | CONSTRUCTION CORRECTIVE ACTION PLAN REQ'D-OBSVD HAZ CONDITION ALONG EXP1 & 4: THE WOOD BASE CORNICE HAS HOLES AND MISSING PARTS,DISLODGE SLATE TILES & PARTS OF WOOD COMPONETS DETERIORAED STONE COPING RUSTED STEEL LINTEL ABOVE WINDOWS. OWNER TO IMMED RETAIN REG DESIGN PROF IN GOOD STANDING W/DOB TO EVAL ENTIRE BL #PI20702HZ | DOB VIOLATION - ACTIVE |
| Jun 20, 2023 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL LOW PRESSURE INSPECTION #23165 | DOB VIOLATION - ACTIVE |
| Apr 25, 2023 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2022 EXTERNAL LOW PRESSURE INSPECTION #07810 | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Sep 30, 2026 | AEUHAZ FTC-AEU-HAZ | Active |
| Sep 30, 2026 | AEUHAZ FTC-AEU-HAZ | Active |
| Jun 20, 2023 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL LOW PRESSURE INSPECTION | Active |
| Apr 25, 2023 | Boiler LBLVIO VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2022 INSPECTION REPORT | Active |
| Issued | Class | Violation | Correct by |
|---|---|---|---|
| Jan 4, 2017 | B | Apt 2C · § 27-2045 ADM CODE REPAIR OR REPLACE THE SMOKE DETECTOR MISSING LOCATED AT APT 2C, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH | Feb 8, 2017 |
| Feb 1, 2012 | A | Apt 3D · § 27-2005 ADM CODE REFIT UPPER AND LOWER WINDOW SASHES IN THE ENTIRE APARTMENT LOCATED AT APT 3D, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH | May 6, 2012 |
| Oct 6, 2008 | B | Apt 3E · § 27-2026 ADM CODE REPAIR THE FLUSHING APPARATUS AND MAINTAIN SAME SO AS TO FLUSH EFFECTIVELY THE WATER CLOSET BOWL IN THE BATHROOM LOCATED AT APT 3E, 4th STORY, 2nd APARTMENT FROM EAST AT SOUTH | Nov 10, 2008 |
| Oct 6, 2008 | C | Apt 3E · § 27-2026 ADM CODE REMOVE ALL OBSTRUCTIONS FROM WATER CLOSET BOWL IN THE BATHROOM LOCATED AT APT 3E, 4th STORY, 2nd APARTMENT FROM EAST AT SOUTH | Oct 12, 2008 |
| Dec 26, 2007 | C | § 27-2033 ADM CODE PROVIDE READY ACCESS TO BUILDINGS HEATING SYSTEM LOCKED DOOR AT BOILER ROOM | Jan 1, 2008 |
| Dec 26, 2007 | C | Apt 3D · § 27-2005 ADM CODE & 309 M/D LAW ABATE THE NUISANCE CONSISTING OF DOUBLE CYLINDER LOCK AT DOOR IN THE ENTRANCE LOCATED AT APT 3D, 3rd STORY, 1st APARTMENT FROM SOUTH AT WEST | Jan 1, 2008 |
| Date | Source | What | Now |
|---|---|---|---|
| Sep 30, 2026 | DOB Safety | AEUHAZ: | Open |
| Sep 30, 2026 | DOB Safety | AEUHAZ: | Open |
| Sep 16, 2026 | ECB | Construction: FAILURE TO COMPLY WITH COMMISSIONER'S ORDER DOB PARAPET VIO 042326PI20703HZ AND DOB CONTROL #348547 DATED 04/23/2026. NO COMPLIANCE ON FILE FOR ANNUAL PARAPET OBSERVATION REPORT. REMEDY: COMPLY WITH THE COMMISS | Open |
| Jul 10, 2026 | ECB | Construction: FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER, DOB FTC CONTROL #370530, DOB FTC VIO #060426PI20701SB, DATED 06/04/26. NO COMPLIANCE ON FILE FOR A CORRECTIVE ACTION PLAN. REMEDY: COMPLY WITH THE COMMISSIONER'S | Open |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Oct 30, 2026, 4:28 PM ET. BBL 2033310082.