Bronx · Block 3331 · Lot 82 · 10467

391 E Mosholu Parkway N

6 floors · 37 apartments · 36,540 sq ft · built 1927 · class D1 · owner of record: Mosholu Partners I Llc

20open violations
$12,500ECB/OATH penalties owed
3HPD class C (immediately hazardous)
62dto Bedbug annual filing

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 62 days
Keep the report on file (not filed with DOB)
Bedbug annual filing Applies
Local Law 69 · December 1 to 31 each year
What this is

Owners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page

Dec 31, 2026
in 62 days
Annual
Annual boiler inspection (1 boiler) Applies
Boiler inspection · By December 31 each year
What this is

Boilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2024-08-06 (Accepted). Agency page

Dec 31, 2026
in 62 days
1 of 1 without an accepted 2026 report yet
Annual notice: window guards and lead paint Applies
HPD / Health Code · January 1 to 16 each year
What this is

Deliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page

Jan 16, 2027
in 78 days
Annual
Energy and water benchmarking Likely applies
Local Law 84 · May 1 each year
What this is

Buildings over 25,000 sq ft (this lot shows 36,540 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page

May 1, 2027
in 183 days
Annual filing
Building emissions report Likely applies
Local Law 97 · May 1 each year (extensions available)
What this is

Covered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page

May 1, 2027
in 183 days
Annual filing
Annual property registration Applies
HPD registration · September 1 each year
What this is

Residential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page

Sep 1, 2027
in 306 days
Registered through 2027-09-01
Gas piping inspection (2029 cycle) Likely applies
Local Law 152 · During 2029
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 7 is on the 2029 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2029
in 1158 days
Next cycle year 2029

Open violations

ECB / OATH (4) · $12,500 owed
IssuedViolationHearingBalance
Sep 16, 2026Construction CLASS - 1
FAILURE TO COMPLY WITH COMMISSIONER'S ORDER DOB PARAPET VIO 042326PI20703HZ AND DOB CONTROL #348547 DATED 04/23/2026. NO COMPLIANCE ON FILE FOR ANNUAL PARAPET OBSERVATION REPORT. REMEDY: COMPLY WITH THE COMMISS
#35733235K
Dec 4, 2026
PENDING
$2,500
Jul 10, 2026Construction CLASS - 1
FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER, DOB FTC CONTROL #370530, DOB FTC VIO #060426PI20701SB, DATED 06/04/26. NO COMPLIANCE ON FILE FOR A CORRECTIVE ACTION PLAN. REMEDY: COMPLY WITH THE COMMISSIONER'S
#35718618M
Mar 12, 2027
PENDING
$2,500
Apr 27, 2026Construction CLASS - 1
FAILURE TO MAINTAIN BLDG EXTERIOR FACADE AND APPURTENANCES. NOTE: AT TIME OF INSPECTION I OBSERVED EXP #1 WEST (1)CRACKED/SPALLING COPING STONE MULTI LOC. (2)CRACKED/DETERIORATED WOOD CORNICE/SHINGLES.-EXP #2 N
#35729805L
Nov 27, 2026
PENDING
$5,000
Apr 23, 2026Construction CLASS - 1
FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. I OBSERVED HAZARDOUS CONDITIONS ALONG EXPOSURE ONE-FACING EAST MOSHOLU PKWY EAST. WOOD BASE CORNICE ATTACHED TO THE PARAPET WALL AT FRONT ELEVATION. DETERI
#35718972P
Nov 27, 2026
PENDING
$2,500
DOB (6)
IssuedViolationStatus
Jun 4, 2026CONSTRUCTION
FTC W/COMMISSIONER'S ORDER CONTROL#348546 VIO#042326PI20702HZ DATED 04/23/26 REQUIRIDNG OWNER TO PROVIDE A CORRECTIVE ACTION PLAN BY 04/30/26 AS OF 06/04/26 THE REQ'D CAP WAS NOT REC'D. IMMED COMPLY W/COMMISSIONER'S ORDER VIO#042326PI20702HZ CONTROL#348546
#PI20701SB
DOB VIOLATION - ACTIVE
Apr 27, 2026CONSTRUCTION
EMERGENCY WORK ORDER DUE TO MULTIPLE HAZARDOUS FACADE CONDITION SUCH A S EXP1 WEST:DETERIORATING/SPALLING COPING STONES WITH LOOSE MATERIAL D ETERIORATED WOOD CORNICE.EXP4 SOUTH:EXTENSIVE CRACKS AT PARAPET LEVEL EAST FACING WALL.EXP3 EAST:DEFECTIVE FIRE ESCAPE DROP LADDER.REMEDY:PR OVIDE SAFETY MEAS
#FA0701DD
DOB VIOLATION - ACTIVE
Apr 23, 2026CONSTRUCTION
FTM BLDG IN A CODE COMPLIANT MANNER-OBSVD WOOD BASED CONICE W/SLATE ROOFING DETRIORATING W/MISSING PARTS AND IS DISLODGED FROM PARAPET WALL @ EXP1. AN ANNUAL PARAPET OBSERVATION REPORT IS REQ'D TO BE COMPLETED ANNUALLY STARTING IN JAN 2024. SUBMIT THE ANNUAL PARAPET OBSERVATION REPORT FOR 2025 & TO
#PI20703HZ
DOB VIOLATION - ACTIVE
Apr 23, 2026CONSTRUCTION
CORRECTIVE ACTION PLAN REQ'D-OBSVD HAZ CONDITION ALONG EXP1 & 4: THE WOOD BASE CORNICE HAS HOLES AND MISSING PARTS,DISLODGE SLATE TILES & PARTS OF WOOD COMPONETS DETERIORAED STONE COPING RUSTED STEEL LINTEL ABOVE WINDOWS. OWNER TO IMMED RETAIN REG DESIGN PROF IN GOOD STANDING W/DOB TO EVAL ENTIRE BL
#PI20702HZ
DOB VIOLATION - ACTIVE
Jun 20, 2023LOW PRESSURE BOILER
VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL LOW PRESSURE INSPECTION
#23165
DOB VIOLATION - ACTIVE
Apr 25, 2023LOW PRESSURE BOILER
VIOLATION ISSUED-FAILURE TO FILE 2022 EXTERNAL LOW PRESSURE INSPECTION
#07810
DOB VIOLATION - ACTIVE
DOB NOW Safety (4)
IssuedViolationStatus
Sep 30, 2026AEUHAZ FTC-AEU-HAZ
Active
Sep 30, 2026AEUHAZ FTC-AEU-HAZ
Active
Jun 20, 2023Boiler LBLVIO
VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL LOW PRESSURE INSPECTION
Active
Apr 25, 2023Boiler LBLVIO
VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2022 INSPECTION REPORT
Active
HPD (6) · C 3 · B 2 · A 1
IssuedClassViolationCorrect by
Jan 4, 2017BApt 2C · § 27-2045 ADM CODE REPAIR OR REPLACE THE SMOKE DETECTOR MISSING LOCATED AT APT 2C, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTHFeb 8, 2017
Feb 1, 2012AApt 3D · § 27-2005 ADM CODE REFIT UPPER AND LOWER WINDOW SASHES IN THE ENTIRE APARTMENT LOCATED AT APT 3D, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTHMay 6, 2012
Oct 6, 2008BApt 3E · § 27-2026 ADM CODE REPAIR THE FLUSHING APPARATUS AND MAINTAIN SAME SO AS TO FLUSH EFFECTIVELY THE WATER CLOSET BOWL IN THE BATHROOM LOCATED AT APT 3E, 4th STORY, 2nd APARTMENT FROM EAST AT SOUTHNov 10, 2008
Oct 6, 2008CApt 3E · § 27-2026 ADM CODE REMOVE ALL OBSTRUCTIONS FROM WATER CLOSET BOWL IN THE BATHROOM LOCATED AT APT 3E, 4th STORY, 2nd APARTMENT FROM EAST AT SOUTHOct 12, 2008
Dec 26, 2007C§ 27-2033 ADM CODE PROVIDE READY ACCESS TO BUILDINGS HEATING SYSTEM LOCKED DOOR AT BOILER ROOMJan 1, 2008
Dec 26, 2007CApt 3D · § 27-2005 ADM CODE & 309 M/D LAW ABATE THE NUISANCE CONSISTING OF DOUBLE CYLINDER LOCK AT DOOR IN THE ENTRANCE LOCATED AT APT 3D, 3rd STORY, 1st APARTMENT FROM SOUTH AT WESTJan 1, 2008

Issued in the last 120 days

DateSourceWhatNow
Sep 30, 2026DOB SafetyAEUHAZ: Open
Sep 30, 2026DOB SafetyAEUHAZ: Open
Sep 16, 2026ECBConstruction: FAILURE TO COMPLY WITH COMMISSIONER'S ORDER DOB PARAPET VIO 042326PI20703HZ AND DOB CONTROL #348547 DATED 04/23/2026. NO COMPLIANCE ON FILE FOR ANNUAL PARAPET OBSERVATION REPORT. REMEDY: COMPLY WITH THE COMMISSOpen
Jul 10, 2026ECBConstruction: FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER, DOB FTC CONTROL #370530, DOB FTC VIO #060426PI20701SB, DATED 06/04/26. NO COMPLIANCE ON FILE FOR A CORRECTIVE ACTION PLAN. REMEDY: COMPLY WITH THE COMMISSIONER'SOpen

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Oct 30, 2026, 4:28 PM ET. BBL 2033310082.

Look up another building