| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 64 days | Keep the report on file (not filed with DOB) |
| Facade inspection report (Cycle 10A) Applies Local Law 11 / FISP · Feb 21, 2025 to Feb 21, 2027 What this isBuildings taller than six stories file a facade inspection report by a QEWI once every five-year cycle. Tax blocks ending in 4, 5, 6 or 9 are in sub-cycle 10A. DOB facade records for this building show $285,000 in late-filing or failure-to-file penalties. Agency page | Feb 21, 2027 in 116 days | No Cycle 10 report on record yet |
| Energy and water benchmarking Likely applies Local Law 84 · May 1 each year What this isBuildings over 25,000 sq ft (this lot shows 33,046 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page | May 1, 2027 in 185 days | Annual filing |
| Building emissions report Likely applies Local Law 97 · May 1 each year (extensions available) What this isCovered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page | May 1, 2027 in 185 days | Annual filing |
| Gas piping inspection (2029 cycle) Likely applies Local Law 152 · During 2029 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 5 is on the 2029 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2029 in 1160 days | Next cycle year 2029 |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Feb 28, 2023 | Construction CLASS - 2 27-929.1 FAILURE TO COMPLETE INSTALLATION OF FULL SYSTEM OF AUTOMATIC SPRINKLERS & FILE FINAL SPRINKLER REPORT PREPARED BY REGISTERED DESIGNPROFESSIONAL IN OFFICE BLDG 100 FT OR MORE IN HEIGHT IN EXISTENCE ON #37025315X | Dec 14, 2023 IN VIOLATION | $0 |
| Mar 30, 2021 | Construction CLASS - 2 27-929.1 FAILURE TO COMPLETE THE INSTALLATION OF A FULL SYSTEM OF AUTOMATIC SPRINKLERS AND FILE A FINAL SPRINKLER REPORT PREPARED BY A REGISTERED DESIGN PROFESSIONAL IN AN OFFICE BUILDING 100 FEET OR MORE IN HE #37020765K | Oct 21, 2021 IN VIOLATION | $0 |
| Nov 15, 2019 | Construction CLASS - 2 SEC. A.C.27-929.1,FAILURE TO COMPLETE THE INSTALLATION OF A FULL SYSTEM OF AUTOMATIC SPRINKLERS & FILE A FINAL SPRINKLER REPORT PREPARED BY A REGISTERED DESIGN PROFESSIONAL BY 7/1/19,IN AN OFFICE BLDG 100 FEET #37016372H | Jan 14, 2021 IN VIOLATION | $0 |
| Jun 20, 2017 | Unknown CLASS - 2 FAILURE TO FILE ANNUAL CERTIFICATION THAT COOLING TOWER 1000001553 HASBEEN INSPECTED,TESTED,& DISINFECTED,& THAT A MAINTENANCE PLAN HAS BEENDEVELOPED & IMPLEMENTED BY 11/1/16. REMEDY: FILE ANNUAL CERTIFICATION. #37002710Y | Nov 16, 2017 IN VIOLATION | $0 |
| Apr 28, 2015 | Elevators CLASS - 1 100R09,11N10. 100R09-ELEVATOR VESTIBULE ON 2ND FLOOR ILLEGAL CAUSING AHAZARDOUS CONDITION REMOVE WALL; 11N10-CAR BUTTON STATION 2ND FLOOR BYPASSED REPAIR. #38235510N | Jun 18, 2015 WRITTEN OFF | $0 |
| Apr 28, 2015 | Elevators CLASS - 1 100R09,11N10. 100R09-ELEVATOR VESTIBULE ON 2ND FLOOR ILLEGAL CAUSING AHAZARDOUS CONDITION REMOVE WALL; 11N10-CAR BUTTON STATION 2ND FLR BY PASSED REPAIR. #38235511P | Jun 18, 2015 WRITTEN OFF | $0 |
| Issued | Violation | Status |
|---|---|---|
| May 2, 2024 | FAILURE TO BENCHMARK FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4 #00165 | DOB VIOLATION - ACTIVE |
| Jun 2, 2022 | FAILURE TO BENCHMARK FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4 #00041 | DOB VIOLATION - ACTIVE |
| Feb 21, 2022 | HAZARDOUS CONDITION (FACADE) CYCLE 9A UNSAFE REPORT FILED #909886 | DOB VIOLATION - ACTIVE |
| Feb 21, 2022 | FAILURE TO CORRECT SWARMP CONDITIONS (FACADE) CYCLE 9A FAILURE TO CORRECT SWARMP CONDITIONS #00422 | DOB VIOLATION - ACTIVE |
| Sep 3, 2019 | SPRINKLER FAILED TO FILE FINAL SPRINKLER REPORT BY JULY 1, 2019 #NRF00234 | DOB VIOLATION - ACTIVE |
| May 31, 2018 | NO REPORT AND / OR LATE FILING (FACADE) FAILED TO FILE FISP CYCLE 8A TECHNICAL REPORT BY 02/21/2017 #00944 | DOB VIOLATION - ACTIVE |
| Jul 29, 2015 | FAIL TO CERTIFY CLASS 1 FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION #00044 | DOB VIOLATION - ACTIVE |
| Jul 29, 2015 | FAIL TO CERTIFY CLASS 1 FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION #00045 | DOB VIOLATION - ACTIVE |
| Jun 10, 2015 | ELEVATOR ANNUAL INSPECTION / TEST VIOLATION ISSUED TO ELEVATOR-FAILURE TO FILE CATEGORY 1 2014 INSPECTION/TEST #00711 | DOB VIOLATION - ACTIVE |
| Jun 10, 2015 | ELEVATOR ANNUAL INSPECTION / TEST VIOLATION ISSUED TO ELEVATOR-FAILURE TO FILE CATEGORY 1 2014 INSPECTION/TEST #00712 | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Jun 22, 2026 | Benchmarking - LL84 FTF-EN-BENCH FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4 | Active |
| Dec 3, 2025 | Benchmarking - LL84 FTF-EN-BENCH FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4 | Active |
| Sep 26, 2025 | Benchmarking - LL84 FTF-EN-BENCH FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4 | Active |
| Feb 28, 2025 | Benchmarking - LL84 FTF-EN-BENCH FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4 | Active |
| Dec 2, 2024 | Benchmarking - LL84 FTF-EN-BENCH FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4 | Active |
| May 2, 2024 | Benchmarking - LL84 FTF-EN-BENCH | Active |
| Jun 2, 2022 | Benchmarking - LL84 FTF-EN-BENCH | Active |
| Feb 21, 2022 | Facades FISPFCS CYCLE 9A FAILURE TO CORRECT SWARMP CONDITIONS | Active |
| Feb 21, 2022 | Facades FISPHAZ CYCLE 9A UNSAFE REPORT FILED | Active |
| Sep 3, 2019 | Sprinklers FTF-SP-FINAL | Active |
| May 20, 2019 | Elevators EVCAT5 | Active |
| May 20, 2019 | Elevators EVCAT5 | Active |
| May 31, 2018 | Facades FISPNRF FAILED TO FILE FISP CYCLE 8A TECHNICAL REPORT BY 02/21/2017 | Active |
| Jul 29, 2015 | AEUHAZ FTC-AEU-HAZ | Active |
| Jul 29, 2015 | AEUHAZ FTC-AEU-HAZ | Active |
| Jun 10, 2015 | Elevators EVCAT1 | Active |
| Jun 10, 2015 | Elevators EVCAT1 | Active |
None open.