Brooklyn · Block 7820 · Lot 11 · 11234

3900 Kings Highway

6 floors · 84 apartments · 87,000 sq ft · built 1955 · class D1 · owner of record: 3900 Kings Highway Co. Llc

41open violations
$0ECB/OATH penalties owed
25HPD class C (immediately hazardous)
Overdueto Annual property registration

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Annual property registration Applies
HPD registration · September 1 each year
What this is

Residential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page

OverdueRegistration expired 2026-09-01
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 64 days
Keep the report on file (not filed with DOB)
Bedbug annual filing Applies
Local Law 69 · December 1 to 31 each year
What this is

Owners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page

Dec 31, 2026
in 64 days
Annual
Annual boiler inspection (1 boiler) Applies
Boiler inspection · By December 31 each year
What this is

Boilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2025-08-11 (Accepted). Agency page

Dec 31, 2026
in 64 days
1 of 1 without an accepted 2026 report yet
Annual notice: window guards and lead paint Applies
HPD / Health Code · January 1 to 16 each year
What this is

Deliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page

Jan 16, 2027
in 80 days
Annual
Energy and water benchmarking Likely applies
Local Law 84 · May 1 each year
What this is

Buildings over 25,000 sq ft (this lot shows 87,000 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page

May 1, 2027
in 185 days
Annual filing
Building emissions report Likely applies
Local Law 97 · May 1 each year (extensions available)
What this is

Covered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page

May 1, 2027
in 185 days
Annual filing
Gas piping inspection (2029 cycle) Likely applies
Local Law 152 · During 2029
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 18 is on the 2029 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2029
in 1160 days
Next cycle year 2029
Energy audit and retro-commissioning (2030) Likely applies
Local Law 87 · Calendar year 2030
What this is

Buildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 7820). Agency page

Dec 31, 2030
in 1525 days
Next due 2030

Open violations

ECB / OATH (0)

None open.

DOB (2)
IssuedViolationStatus
Sep 16, 1997LOCAL LAW 62/91 - BOILERS

#249206
DOB VIOLATION - ACTIVE
Aug 29, 1995LOCAL LAW 62/91 - BOILERS

#30805
DOB VIOLATION - ACTIVE
DOB NOW Safety (1)
IssuedViolationStatus
Sep 23, 2026Parking Structures FTF-PS-INITL
Failure to file parking structures compliance report by 12/31/2025 as required per 1 RCNY 103-13
Active
HPD (38) · C 25 · B 10 · A 3
IssuedClassViolationCorrect by
Dec 4, 2025AApt 5D · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE 3rd ROOM FROM NORTH AT EAST, THE PRIVATE HALLWAY , THE FOYER , THE 3rd ROOM FROM NORTH AT WEST, THE BATHROOM , THE KITCHEN , THE 1st ROOM FROM NORTH AT EAST LOCATED AT APT 5D, 5Mar 9, 2026
Nov 3, 2025CApt 3D · § 27-2005 ADM CODE & 309 M/D LAW ABATE THE NUISANCE CONSISTING OF KEY OPERATED LOCK IN THE ENTRANCE LOCATED AT APT 3D, 3rd STORY, 2nd APARTMENT FROM SOUTH AT WEST , SECTION AT WESTNov 9, 2025
Nov 3, 2025CApt 1L · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 1L, 1st STORY, 1st APARTMENT FROM EAST AT SOUTH , SECTION AT EASTNov 29, 2025
Nov 3, 2025BApt 6A · § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... GREATER THAN 10 SQUARE FEET AT WEST WALL IN THE BATHROOM LOCATED AT APT 6A, 6th STORY, 2nd APARTMENT FROM EAST AT SOUTH , SECTION AT WESTDec 8, 2025
Nov 3, 2025CApt 1L · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 1L, 1st STORY, 1st APARTMENT FROM EAST AT SOUTH , SECTION AT EASTNov 29, 2025
Aug 20, 2025BApt 1L · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR CEILING IN THE BATHROOM LOCATED AT APT 1L, 1st STORY, 1st APARTMENT FROM EAST AT SOUTHSep 24, 2025
May 22, 2025CApt 1L · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 1L, 1st STORY, 1st APARTMENT FROM EAST AT SOUTH , SECTION ''EAST''Jun 17, 2025
May 22, 2025CApt 1L · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 1L, 1st STORY, 1st APARTMENT FROM EAST AT SOUTH , SECTION ''EAST''Jun 17, 2025
Nov 25, 2024CApt 4J · § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PRESUMED LEAD PAINT THAT IS PEELING OR ON A DETERIORATED SUBSURFACE USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) 1st WINDOW FRAME FROM WEST AT NORTH WALL IN THE 1st BATHROOM FROM NORTH AT WEST LOCATED AT APT 4J, 4th STORY, 5th APDec 19, 2024
Sep 4, 2024CApt 4J · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 4J, 4th STORY, 5th APARTMENT FROM WEST AT NORTHSep 30, 2024
Mar 5, 2024BApt 1L · § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE BATHROOM LOCATED AT APT 1L, 1st STORY, 1st APARTMENT FROM EAST AT SOUTHApr 9, 2024
Mar 5, 2024BApt 1L · § 27-2005 HMC: REFIT UPPER CABINET DOORS IN THE KITCHEN LOCATED AT APT 1L, 1st STORY, 1st APARTMENT FROM EAST AT SOUTHApr 9, 2024
Mar 5, 2024BApt 1L · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE BATHROOM LOCATED AT APT 1L, 1st STORY, 1st APARTMENT FROM EAST AT SOUTHApr 9, 2024
Sep 18, 2023BApt 2J · § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... APPROXIMATELY 12 SQ FT AT CEILING AND 8 SQ FT AT EAST WALL IN THE BATHROOM LOCATED AT APT 2J, 2nd STORY, 5th APARTMENT FROM WEST AT NORTHOct 23, 2023
Sep 18, 2023BApt 2J · § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... APPROXIMATELY 12 SQ FT AT NORTH WALL IN THE PRIVATE HALLWAY LOCATED AT APT 2J, 1st STORY, 5th APARTMENT FROM WEST AT NORTHOct 23, 2023
Sep 18, 2023BApt 2J · § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... APPROXIMATELY 12 SQ FT AT EAST WALL. IN THE 3rd ROOM FROM NORTH LOCATED AT APT 2J, 2nd STORY, 5th APARTMENT FROM WEST AT NORTHOct 23, 2023
Sep 18, 2023CApt 2E · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 2E, 2nd STORY, 1st APARTMENT FROM WEST AT NORTHOct 14, 2023
Sep 18, 2023BApt 2J · § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... APPROXIMATELY 12 SQ FT AT CEILING IN THE 1st ROOM FROM NORTH AT WEST LOCATED AT APT 2J, 2nd STORY, 5th APARTMENT FROM WEST AT NORTHOct 23, 2023
Sep 12, 2023CApt 1L · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 1L, 1st STORY, 1st APARTMENT FROM EAST AT SOUTHOct 8, 2023
Sep 12, 2023CApt 1L · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 1L, 1st STORY, 1st APARTMENT FROM EAST AT SOUTHOct 8, 2023
Jul 14, 2023CApt 1H · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 1H, 1st STORY, 2nd APARTMENT FROM WEST AT NORTHAug 9, 2023
Apr 24, 2023BApt 2B · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE VINYL FLOOR TILES IN THE KITCHEN LOCATED AT APT 2B, 2nd STORY, 6th APARTMENT FROM EAST AT SOUTHMay 29, 2023
May 11, 2021AApt 2D · § 300 M/D LAW FILE PLANS AND APPLICATION AND LEGALIZE THE FOLLOWING ALTERATION OR RESTORE TO THE LEGAL CONDITION EXISTING PRIOR TO THE MAKING OF SAID ALTERATION PARTITION WALL AND DOOR ERECTED CREATING A ROOM IN THE 1st ROOM FROM NORTH AT EAST LOCATED AT APT 2D, 2nd STORY, 2nd APARTMENT FROM SOUTH AAug 14, 2021
Apr 12, 2021CApt 6C · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 6C, 6th STORY, 1st APARTMENT FROM SOUTH AT WESTMay 8, 2021
Apr 12, 2021CApt 6C · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 6C, 6th STORY, 1st APARTMENT FROM SOUTH AT WESTMay 8, 2021
Apr 9, 2021CApt 2H · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 2H, 2nd STORY, 4th APARTMENT FROM WEST AT NORTHMay 5, 2021
Apr 9, 2021CApt 6C · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 6C, 6th STORY, 1st APARTMENT FROM SOUTH AT WESTMay 5, 2021
Apr 9, 2021CApt 6C · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 6C, 6th STORY, 1st APARTMENT FROM SOUTH AT WESTMay 5, 2021
Apr 9, 2021CApt 2B · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 2B, 2nd STORY, 6th APARTMENT FROM EAST AT SOUTHMay 5, 2021
Apr 9, 2021CApt 2H · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 2H, 2nd STORY, 4th APARTMENT FROM WEST AT NORTHMay 5, 2021
Apr 9, 2021CApt 1N · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 1N, 1st STORY, 5th APARTMENT FROM EAST AT SOUTHMay 5, 2021
Apr 9, 2021CApt 1N · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 1N, 1st STORY, 5th APARTMENT FROM EAST AT SOUTHMay 5, 2021
Apr 5, 2021CApt 2E · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 2E, 2nd STORY, 1st APARTMENT FROM WEST AT NORTHMay 1, 2021
Apr 5, 2021CApt 2G · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 2G, 2nd STORY, 3rd APARTMENT FROM WEST AT NORTHMay 1, 2021
Apr 5, 2021CApt 2E · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 2E, 2nd STORY, 1st APARTMENT FROM WEST AT NORTHMay 1, 2021
Nov 21, 2019CApt 2H · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 2H, 2nd STORYDec 12, 2019
Nov 21, 2019CApt 2H · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 2H, 2nd STORYDec 12, 2019
Mar 29, 2010AApt 1C · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE REGLAZE BATHTUB IN THE BATHROOM LOCATED AT APT 1C, 1st STORY, 1st APARTMENT FROM SOUTH AT WESTJul 2, 2010

Issued in the last 120 days

DateSourceWhatNow
Sep 23, 2026DOB SafetyParking Structures: Failure to file parking structures compliance report by 12/31/2025 as required per 1 RCNY 103-13Open

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Oct 28, 2026, 10:39 AM ET. BBL 3078200011.

Look up another building