Brooklyn · Block 38 · Lot 1 · 11201

39 Washington Street

9 floors · 448,300 sq ft · built 1904 · class O6 · owner of record: 55 Washington Street Llc

12open violations
$0ECB/OATH penalties owed
0HPD class C (immediately hazardous)
68dto Annual boiler inspection (5 boilers)

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 68 days
Keep the report on file (not filed with DOB)
Annual boiler inspection (5 boilers) Applies
Boiler inspection · By December 31 each year
What this is

Boilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-10-01 (Accepted). Agency page

Dec 31, 2026
in 68 days
1 of 5 without an accepted 2026 report yet
Energy and water benchmarking Likely applies
Local Law 84 · May 1 each year
What this is

Buildings over 25,000 sq ft (this lot shows 448,300 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page

May 1, 2027
in 189 days
Annual filing
Building emissions report Likely applies
Local Law 97 · May 1 each year (extensions available)
What this is

Covered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page

May 1, 2027
in 189 days
Annual filing
Energy audit and retro-commissioning (2028) Likely applies
Local Law 87 · Calendar year 2028
What this is

Buildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 38). Agency page

Dec 31, 2028
in 799 days
Next due 2028
Gas piping inspection (2029 cycle) Likely applies
Local Law 152 · During 2029
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 2 is on the 2029 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2029
in 1164 days
Next cycle year 2029
Facade inspection report (Cycle 10B) Applies
Local Law 11 / FISP · Feb 21, 2026 to Feb 21, 2028
What this is

Buildings taller than six stories file a facade inspection report by a QEWI once every five-year cycle. Tax blocks ending in 0, 7 or 8 are in sub-cycle 10B. DOB facade records for this building show $277,500 in late-filing or failure-to-file penalties. Agency page

On fileCycle 10 filing on record: SAFE (2025-10-16)

Open violations

ECB / OATH (0)

None open.

DOB (10)
IssuedViolationStatus
Feb 22, 2023NO REPORT AND / OR LATE FILING (FACADE)
FAILED TO FILE FISP CYCLE 9B TECHNICAL REPORT BY 2/21/2023
#00740
DOB VIOLATION - ACTIVE
Feb 12, 2015ELEVATOR

#9027/534639
DOB VIOLATION - ACTIVE
Aug 2, 2002ELEVATOR
3F2210
#9013/358932
DOB VIOLATION - ACTIVE
Aug 2, 2002ELEVATOR
3P310
#9013/358933
DOB VIOLATION - ACTIVE
Aug 2, 2002ELEVATOR
3F2212
#9013/358934
DOB VIOLATION - ACTIVE
May 14, 2001CONSTRUCTION
WORK WITHOUT A PERMIT. WORK NOTED: AT EAST END OF BLDG (ADAM ST SIDE) MAJOR DEMO WORK IS IN PROGRESS WITH APPROX 45'X 5' OF POURED CONCRETE PLAFORM REMOVED CREATING APPROX 8 CUBIC YARDS OF REE-BAR, CONCRETE, BRICK, ETC. APPROX 15' SECTION REMAIN. STOP ALL DEMO WORK! REMEDY: MAKE SAFE IMMEDIATELY, OB
#02EM01
VIOLATION WORK WITHOUT PERMIT - ACTIVE
Jan 9, 2001CONSTRUCTION
WORK WITHOUT A PERMIT. HAZARDOUS. FULL RENOVATION/ALTERATION OF 9TH FLOOR AND ROOF. REMOVAL OF EXISTING WOODFRAME, SHEETROCKS, SIDINGS, AND PARTITION WALLS REMEDY: STOP ALL WORK! OBTAIN PERMIT OR RESTORE TO PRIOR LEGAL CONDITION
#02AS01
VIOLATION WORK WITHOUT PERMIT - ACTIVE
Apr 21, 1998CONSTRUCTION
HAZARDOUS
#NERH02
DOB VIOLATION - ACTIVE
Aug 16, 1993LOCAL LAW 62/91 - BOILERS

#25347
DOB VIOLATION - ACTIVE
Aug 16, 1993LOCAL LAW 62/91 - BOILERS

#25348
DOB VIOLATION - ACTIVE
DOB NOW Safety (2)
IssuedViolationStatus
Sep 23, 2026Parking Structures FTF-PS-INITL
Failure to file parking structures compliance report by 12/31/2025 as required per 1 RCNY 103-13
Active
Feb 22, 2023Facades FISPNRF
CYCLE 9B NO REPORT FILED
Active
HPD (0)

None open.

Issued in the last 120 days

DateSourceWhatNow
Sep 23, 2026DOB SafetyParking Structures: Failure to file parking structures compliance report by 12/31/2025 as required per 1 RCNY 103-13Open

Check the agency records