Queens · Block 1238 · Lot 6 · 11377

39-65 52 Street

11 floors · 219 apartments · 207,086 sq ft · built 1961 · class D4 · owner of record: Berkeley Towers

12open violations
$15,000ECB/OATH penalties owed
1HPD class C (immediately hazardous)
Overdueto Annual property registration

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Annual property registration Applies
HPD registration · September 1 each year
What this is

Residential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page

OverdueRegistration expired 2026-09-01
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 67 days
Keep the report on file (not filed with DOB)
Bedbug annual filing Applies
Local Law 69 · December 1 to 31 each year
What this is

Owners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page

Dec 31, 2026
in 67 days
Annual
Annual notice: window guards and lead paint Applies
HPD / Health Code · January 1 to 16 each year
What this is

Deliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page

Jan 16, 2027
in 83 days
Annual
Energy and water benchmarking Likely applies
Local Law 84 · May 1 each year
What this is

Buildings over 25,000 sq ft (this lot shows 207,086 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page

May 1, 2027
in 188 days
Annual filing
Building emissions report Likely applies
Local Law 97 · May 1 each year (extensions available)
What this is

Covered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page

May 1, 2027
in 188 days
Annual filing
Facade inspection report (Cycle 10B) Applies
Local Law 11 / FISP · Feb 21, 2026 to Feb 21, 2028
What this is

Buildings taller than six stories file a facade inspection report by a QEWI once every five-year cycle. Tax blocks ending in 0, 7 or 8 are in sub-cycle 10B. Agency page

Feb 21, 2028
in 484 days
No Cycle 10 report on record yet
Energy audit and retro-commissioning (2028) Likely applies
Local Law 87 · Calendar year 2028
What this is

Buildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 1238). Agency page

Dec 31, 2028
in 798 days
Next due 2028
Gas piping inspection (2029 cycle) Likely applies
Local Law 152 · During 2029
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 2 is on the 2029 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2029
in 1163 days
Next cycle year 2029
Annual boiler inspection (2 boilers) Applies
Boiler inspection · By December 31 each year
What this is

Boilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-04-16 (Accepted). Agency page

On file2026 reports accepted

Open violations

ECB / OATH (5) · $15,000 owed
IssuedViolationHearingBalance
Aug 18, 2026Construction CLASS - 2
FAILURE TO CERTIFY CORRECTION FOR VIOLATION 39142160X.., FILE A CERTIFICATE OF CORRECTION
#39200947M
Oct 27, 2026
PENDING
$1,250
Jan 5, 2026Construction CLASS - 2
VIOLATION 39142160X NO CERTIFICATE OF CORRECTIONS FILED, FILE A CERTIFICATE OF CORRECTION
#39172367K
Dec 18, 2026
PENDING
$1,250
Oct 9, 2025Unknown CLASS - 2
FAILURE TO MAINTAIN-PARKING STRUCTURE.NOTE:AT THE TIME OF INSPECTION ON AN ACTIVE PARKING STRUCTURE CONSISTING OF 1 LEVEL AT GRADE OBSERVED SPALLED SLAB CONCRETE,CRACK ON FLOOR,BRICK MASONRY WALL DETERIORATING
#35717813N
Dec 23, 2025
IN VIOLATION
$0
Mar 17, 2025Construction CLASS - 1
FAILURE TO MAINTAIN BUILDSTATION FOR ADA TENANTS., REPAIR AND/REPLACE
#39142160X
Dec 18, 2026
DEFAULT
$12,500
May 16, 2017Construction CLASS - 2
FAILURE TO MAINTAIN EXTERIOR BLDG FACADES AND APPURTENANCES.WEST ELEVATION EXP#1 LOOSE/ERODED MORTAR JOINT/CRACK COPING STONE AT PARAPAT WALL OR 9TH FLOOR LEVEL.EAST ELEVATION, EXP#3 LOOSE/ERODED MORTAR JOINT A
#35253868H
Jul 11, 2017
IN VIOLATION
$0
DOB (2)
IssuedViolationStatus
May 15, 2014LOW PRESSURE BOILER
VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2012 INSPECTION REPORT
#19117
DOB VIOLATION - ACTIVE
May 15, 2014LOW PRESSURE BOILER
VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2012 INSPECTION REPORT
#19118
DOB VIOLATION - ACTIVE
DOB NOW Safety (3)
IssuedViolationStatus
Sep 25, 2026Benchmarking - LL84 DQ-EN-BENCH
FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4
Active
May 15, 2014Boiler LBLVIO
VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2012 INSPECTION REPORT
Active
May 15, 2014Boiler LBLVIO
VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2012 INSPECTION REPORT
Active
HPD (2) · C 1 · B 0 · A 1
IssuedClassViolationCorrect by
Oct 19, 2026CApt 1B · § 27-2005 ADM CODE & 309 M/D LAW ABATE THE NUISANCE CONSISTING OF SCALDING HOT WATER WATER ABOVE 130 DEGREES IN THE ENTIRE APARTMENT LOCATED AT APT 1B, 1st STORY, 2nd APARTMENT FROM SOUTH AT WEST , SECTION AT NORTHOct 25, 2026
Sep 13, 2023AApt 4C · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE CEILING IN THE 2nd ROOM FROM EAST LOCATED AT APT 4C, 4th STORY, 1st APARTMENT FROM EAST AT SOUTH , SECTION AT NORTHDec 17, 2023

Issued in the last 120 days

DateSourceWhatNow
Oct 19, 2026HPD C§ 27-2005 ADM CODE & 309 M/D LAW ABATE THE NUISANCE CONSISTING OF SCALDING HOT WATER WATER ABOVE 130 DEGREES IN THE ENTIRE APARTMENT LOCATED AT APT 1B, 1st STORY, 2nd APARTMENT FROM SOUTH AT WEST , SECTION AT NORTHOpen
Sep 25, 2026DOB SafetyBenchmarking - LL84: FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4Open
Aug 18, 2026ECBConstruction: FAILURE TO CERTIFY CORRECTION FOR VIOLATION 39142160X.., FILE A CERTIFICATE OF CORRECTIONOpen

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Oct 25, 2026, 11:04 PM ET. BBL 4012380006.