2 floors · 2,931 sq ft · built 1942 · class M1 · owner of record: Greater Ny Cp/7 Dayadvt
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 67 days | Keep the report on file (not filed with DOB) |
| Annual boiler inspection (1 boiler) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2019-11-08 (Accepted). Agency page | Dec 31, 2026 in 67 days | 1 of 1 without an accepted 2026 report yet |
| Gas piping inspection (2028 cycle) Likely applies Local Law 152 · During 2028 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 1 is on the 2028 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2028 in 798 days | Next cycle year 2028 |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Feb 25, 2025 | Construction CLASS - 1 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. NOTED: FACADE AT EXP #1 AND #4 IN DISREPAIR. THERE ARE CRACKS AROUND WINDOWS, DISLODGING BRICKS AND MISSING MORTAR JOINTS AT EXP #1 AND #4 OF 2 STORY BLDG #39139725R | Jul 15, 2025 IN VIOLATION | $2,500 |
| Jan 29, 2025 | Construction CLASS - 2 FAILURE TO COMPLY WITH COMMISSIONER'S ORDER CONTAINED IN SUMMONS #39085682P ISSUED ON 05/05/2023, AND FAILURE TO FILE A CERTIFICATE OF CORRECTION PURSUANT TO 28.201.1 AND 1 RCNY 102-01(D)(2). AN ACCEPTABLE CERT #37032939J | Oct 8, 2026 IN VIOLATION | $1,250 |
| Jan 29, 2025 | Construction CLASS - 2 FAILURE TO COMPLY WITH COMMISSIONER'S ORDER CONTAINED IN SUMMONS #39085680L ISSUED ON 05/05/2023, AND FAILURE TO FILE A CERTIFICATE OF CORRECTION PURSUANT TO 28.201.1 AND 1 RCNY 102-01(D)(2). AN ACCEPTABLE CERT #37032937X | Oct 8, 2026 IN VIOLATION | $1,250 |
| Jan 29, 2025 | Construction CLASS - 2 FAILURE TO COMPLY WITH COMMISSIONER'S ORDER CONTAINED IN SUMMONS #39085681N ISSUED ON 05/05/2023, AND FAILURE TO FILE A CERTIFICATE OF CORRECTION PURSUANT TO 28.201.1 AND 1 RCNY 102-01(D)(2). AN ACCEPTABLE CERT #37032938H | Oct 8, 2026 IN VIOLATION | $1,250 |
| May 5, 2023 | Construction CLASS - 2 FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER. AT TIME INSPECTION, OBSERVED, BUILDING FACADE IS IN DISREPAIR, HAS CRACKS AND SIDINGS ARE LOSE & A PORTION OF SIDING IS COME OUT FROM THE WALL., REPAIR AND #39085680L | Jul 11, 2023 STIPULATION/IN-VIO | $315 |
| May 5, 2023 | Construction CLASS - 2 TEMPORARY CONSTRUCTION EQUIPMENT ON SITE EXPIRED PERMIT. AT TIME OF INSPECTION, OBSERVED, PERMIT# Q00447736-SH FOR SIDEWALK SHED IS EXPIRED., RENEW PERMIT #39085681N | Jul 11, 2023 STIPULATION/IN-VIO | $630 |
| May 5, 2023 | Construction CLASS - 2 FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER. AT TIME INSPECTION, OBSERVED, SIDEWALK SHED HAS LIGHTS BUT NOT WORKING, A BROKEN PIECE OF CONCRETE IS INSIDE THE SIDEWALK AND PORTION OF SIDEWALK SHED IS L #39085682P | Jul 11, 2023 STIPULATION/IN-VIO | $315 |
| Mar 16, 2023 | Construction CLASS - 2 FAILURE TO MAINTAIN BUILDING IN A CODE COMPLIANT MANNER. NOTED; AT RIGHT SIDE OF EXTERIOR WALL VINYL SIDING IN DISREPAIR, HAS BECOME UNFASTENED AND LOOSE., REPAIR AND/OR REPLACE #39081607R | May 23, 2023 ADMIT/IN-VIO | $0 |
| Mar 16, 2023 | Construction CLASS - 2 TEMPORARY CONSTRUCTION EQUIPMENT ON SITE-EXPIRED PERMIT. NOTED; PERMIT Q00447736 FOR SIDEWALK SHED HAS EXPIRED ON 9/26/2022., RENEW PERMIT #39081606P | May 23, 2023 ADMIT/IN-VIO | $0 |
| Issued | Violation | Status |
|---|---|---|
| Nov 14, 2025 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION #15872 | DOB VIOLATION - ACTIVE |
| Sep 23, 2024 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL LOW PRESSURE INSPECTION #14525 | DOB VIOLATION - ACTIVE |
| Jun 30, 2023 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL LOW PRESSURE INSPECTION #19248 | DOB VIOLATION - ACTIVE |
| Jun 30, 2023 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL LOW PRESSURE INSPECTION #39611 | DOB VIOLATION - ACTIVE |
| Apr 25, 2023 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2022 EXTERNAL LOW PRESSURE INSPECTION #24178 | DOB VIOLATION - ACTIVE |
| Apr 17, 2020 | CONSTRUCTION FAILURE TO COMPLY WITH COMMISSIONER ORDER # 316010 ISSUED ON 10/31/18 FOR THE REPAIR UNDER PERMITS AT THE PARTIAL COLLAPSE OF THE ROOF OF THE BUILDING.NO PERMITS HAS BEEN OBTAIND WITH THE DEPARTMENT REGARDING THESE REPAIRS AS OF 4/17/20.COMPLY WITH COMMISSIONER ORDER # 316010 IMMEDIATELY #FEU40101FF | DOB VIOLATION - ACTIVE |
| Oct 31, 2018 | CONSTRUCTION FAILURE TO MAINTAIN-OWNER HAS TO ENGAGE A NYS LICENSED PROFESSIONAL AND ENDORSED CONTRACTOR TO EVALUATE THE WHOLE BUILDING.OBTAIN PERMITS FOR REPAIRS NO LATER THAN 12/28/18. SIGN OFF OF REPAIR WORK UNDER PERMIT TO BE NO LATER THAN 3/29/19 #FEU40101FF | DOB VIOLATION - ACTIVE |
| Oct 29, 2018 | CONSTRUCTION EMG WRK ORDER BLDG 2S+C HORIZ EXT@REAR MAIN BLDG/EXT ATTACH/CONNECT ROOF @EAST HORIZ EXT PARTLY COLL INS/BLDG LVG S&E WALLS F/STD &IMPROP BRAC.OWN IMM HIRE PE+CONTR TO EVAL W/BLDG INST SWSHEDABV S/WALL PROV SHOR ROOF PART/DEMO TO SAFE/LVL UNBRAC PERI WALLS,WRK PERF U/NYS CONT SUPERVISION.WORK TOBE F #FEU40101FF | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Jan 8, 2026 | Gas Piping - LL152 FTF-PL-PER Cycle 2, Sub-cycle A (premises is in Community District 1) | Active |
| Nov 14, 2025 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION | Active |
| Sep 23, 2024 | Boiler LBLVIO Violation Issued-Failure To File 2023 External Low Pressure Inspection Report | Active |
| Jun 30, 2023 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL LOW PRESSURE INSPECTION | Active |
| Jun 30, 2023 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL LOW PRESSURE INSPECTION | Active |
| Apr 25, 2023 | Boiler LBLVIO VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2022 INSPECTION REPORT | Active |
None open.
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Oct 25, 2026, 5:13 AM ET. BBL 4003990001.