2 floors · 4 apartments · 3,900 sq ft · built 1930 · class C3 · owner of record: Jacob Berg Llc
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Gas piping inspection (2026 cycle) Likely applies Local Law 152 · During 2026 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 16 is on the 2026 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2026 in 56 days | Due this year |
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 56 days | Keep the report on file (not filed with DOB) |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 56 days | Annual |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 72 days | Annual |
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Sep 1, 2027 in 300 days | Registered through 2027-09-01 |
None open.
None open.
None open.
| Issued | Class | Violation | Correct by |
|---|---|---|---|
| Sep 20, 2024 | B | Apt 1R · § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE 2nd ROOM FROM EAST AT SOUTH LOCATED AT APT 1R, 1st STORY, 1st APARTMENT FROM NORTH AT EAST | Oct 25, 2024 |
| Sep 20, 2024 | B | Apt 1R · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING IN THE 2nd ROOM FROM EAST AT SOUTH LOCATED AT APT 1R, 1st STORY, 1st APARTMENT FROM NORTH AT EAST | Oct 25, 2024 |
| Sep 20, 2024 | B | Apt 1R · § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE 1st ROOM FROM EAST AT SOUTH LOCATED AT APT 1R, 1st STORY, 1st APARTMENT FROM NORTH AT EAST | Oct 25, 2024 |
| Sep 20, 2024 | B | Apt 1R · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING IN THE 1st ROOM FROM EAST AT SOUTH LOCATED AT APT 1R, 1st STORY, 1st APARTMENT FROM NORTH AT EAST | Oct 25, 2024 |
| Jul 24, 2023 | A | Apt 1R · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE FOYER , THE 2nd ROOM FROM NORTH AT WEST LOCATED AT APT 1R, 1st STORY, 1st APARTMENT FROM EAST AT SOUTH | Oct 27, 2023 |
| Jul 24, 2023 | C | Apt 1R · § 27-2056.7, 27-2056.8, 27-2056.9 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY PERFORMING ACTIVITIES NECESSARY TO ABATE TESTED LEAD-BASED PAINT FROM REQUIRED WINDOW AND/OR DOOR FRICTION SURFACES FOR APARTMENT AND MAKE FLOORS SMOOTH A | Aug 17, 2023 |
| Jul 24, 2023 | B | Apt 1R · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING IN THE FOYER LOCATED AT APT 1R, 1st STORY, 1st APARTMENT FROM EAST AT SOUTH | Aug 28, 2023 |
| Jul 24, 2023 | B | Apt 1R · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING, WEST WALL IN THE 2nd ROOM FROM NORTH AT WEST LOCATED AT APT 1R, 1st STORY, 1st APARTMENT FROM EAST AT SOUTH | Aug 28, 2023 |
| Jul 3, 2023 | A | Apt 1R · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE KITCHEN LOCATED AT APT 1R, 1st STORY, 1st APARTMENT FROM SOUTH AT WEST | Oct 6, 2023 |
| Mar 15, 2021 | B | § 27-2005, 2006, 2037 HMC: PROPERLY REPAIR AND ABATE UNSAFE ELECTRIC WIRING CONDITION CONSISTING OF EXPOSED ELECTRIC WIRING AT CEILING AT CELLAR | Apr 19, 2021 |
| Mar 15, 2021 | B | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE FIRE RETARDANT PLASTER AT CEILING AT CELLAR | Apr 19, 2021 |
| Jul 23, 2020 | A | § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT CEILING AT PUBLIC HALL, 2nd STORY | Oct 26, 2020 |
| Jul 23, 2020 | B | § 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK OVER CEILING AT PUBLIC HALL, 2nd STORY | Aug 27, 2020 |
| Jul 23, 2020 | A | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE FIRE RETARDANT CEILING AT PUBLIC HALL, 2nd STORY | Oct 26, 2020 |
| Jan 30, 2020 | C | Apt 2F · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 2F, 2nd STORY, 1st APARTMENT FROM SOUTH AT WEST | Feb 20, 2020 |
| Jan 30, 2020 | C | Apt 2F · § 27-2005, 2006, 2037 HMC: PROPERLY REPAIR AND ABATE UNSAFE ELECTRIC WIRING CONDITION CONSISTING OF EXPOSED WIRES TO LIGHT SWITCH AT WEST WALL IN THE FOYER LOCATED AT APT 2F, 2nd STORY, 1st APARTMENT FROM SOUTH AT WEST | Feb 7, 2020 |
| Jul 31, 2017 | A | Apt 1F · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE CEILING IN THE 4th ROOM FROM EAST AT NORTH LOCATED AT APT 1F, 1st STORY, 1st APARTMENT FROM EAST AT SOUTH | Nov 3, 2017 |
| Jun 7, 2017 | A | § 300 M/D LAW FILE PLANS AND APPLICATION AND LEGALIZE THE FOLLOWING ALTERATION OR RESTORE TO THE LEGAL CONDITION EXISTING PRIOR TO THE MAKING OF SAID ALTERATION WOOD PARTITION ERECTED CREATING ROOM EAST AND WEST CELLAR. | Sep 10, 2017 |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Nov 5, 2026, 4:26 AM ET. BBL 3035950017.