4 floors · 33,331 sq ft · built 1961 · class M1 · owner of record: Van Court Jewish Ctr
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Gas piping inspection (2026 cycle) Likely applies Local Law 152 · During 2026 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 8 is on the 2026 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2026 in 56 days | Due this year |
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 56 days | Keep the report on file (not filed with DOB) |
| Energy and water benchmarking Likely applies Local Law 84 · May 1 each year What this isBuildings over 25,000 sq ft (this lot shows 33,331 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page | May 1, 2027 in 177 days | Annual filing |
| Building emissions report Likely applies Local Law 97 · May 1 each year (extensions available) What this isCovered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page | May 1, 2027 in 177 days | Annual filing |
| Annual boiler inspection (1 boiler) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-03-04 (Accepted). Agency page | On file | 2026 reports accepted |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Mar 16, 2026 | Construction CLASS - 1 ALTERED/CHANGED BUILDING OCCUPIED WITHOUT A VALID CERTIFICATE OF OCCUPANCY - 28-118.3.1 / 28-118.3.2. AT TIME OF INSPECTION, OBSERVED THE 2ND AND 3RD FLOORS ARRANGED AND OCCUPIED AS A DAY CARE / UPK CENTER WITH #39180588Y | Oct 23, 2026 DEFAULT | $6,280 |
| Jan 29, 2025 | Construction CLASS - 2 FAILURE TO COMPLY WITH COMMISSIONER'S ORDER CONTAINED IN SUMMONS #39085979X ISSUED ON 05/10/2023, AND FAILURE TO FILE A CERTIFICATE OF CORRECTION PURSUANT TO 28.201.1 AND 1 RCNY 102-01(D)(2). AN ACCEPTABLE CERT #37032943M | Apr 15, 2027 DEFAULT | $1,280 |
| Aug 21, 2024 | Construction CLASS - 2 FAILURE TO MAINTAIN BUILDING IN CODE COMPLAINT MANNER. NOTED AT 3RD FLOOR, EAST AND WEST EGRESS STAIRWELLS HAVE CRACKED & SEPARATING CONCRETE CASING ALONG BEAM AND SPALLING PLASTER ON WALLS & CEILINGS OF THE ST #39122689H | Nov 1, 2024 IN VIOLATION | $0 |
| Aug 21, 2024 | Construction CLASS - 1 ALTERED/CHANGE BUILDING OCCUPIED WITHOUT A VALID CERTIFICATE OF OCCUPANCY AS PER 28-118.3.1 - 28-118.3.2. NOTED 2ND & 3RD FLOOR OF THE BUILDING ARRANGED & OCCUPIED AS DAY CARE/UPK CENTER WITH CLASSROOMS, TEACHE #39122697H | Dec 27, 2024 IN VIOLATION | $0 |
| May 10, 2023 | Boilers CLASS - 2 FOUND BOILER ROOM NOT FIRE RATED, DISCHARGE PIPES MISSING AT BACK FLOW PREVENTER AND AT BLOW DOWN VALVE, COMBUSTION AIR FAN NOT CORRECT, IT'S EXHAUSTING NOT PROVIDING AIR TO BOILER ROOM, CORRODED AUTO VENT VALV #39085979X | Jul 21, 2023 STIPULATION/IN-VIO | $0 |
| Jul 22, 2011 | Construction CLASS - 2 REISSUE#34855898K 2 FLR CAFETERIA DOORS ARE MISSING LEAVING DOOR FRAME.REM:REPLACE MISSING DOORS. #34918620L | Sep 16, 2011 POP/IN-VIO | $0 |
| Jun 29, 2010 | Construction CLASS - 2 REISSUE: 34770186J, 34675630Y, 34592745H 2ND FL INTERIOR DOORS TO CAFETERIA ARE MISSING REMEDY: REPLACE MISSING DOORS #34855898K | Sep 17, 2010 WRITTEN OFF | $0 |
| Mar 12, 2009 | Construction CLASS - 2 REISSUE: 34645630Y INTERIOR DOORS ARE MISSING LOCATED AT THE CAFETERIA ON THE 2ND FLR LEVEL. REMEDY: REPLACE MISSING DOORS. #34770186J | May 15, 2009 WRITTEN OFF | $0 |
| May 8, 2008 | Construction Hazardous 27-127 REISSUE 34592745H CAFETERIA DOORS ARE MISSING LOCATED AT THE 2ND FLOOR LEAVING THE DOOR FRAME REM REPLACE MISSING DOORS #34645630Y | Jun 27, 2008 WRITTEN OFF | $0 |
| Aug 24, 2007 | Construction Hazardous INTERIOR DOORS ARE MISSING TO THE 2ND FL LEVEL.LEAVING DOOR FRAMES.REMEDY;REPLACE MISSING DOORS #34592745H | Nov 16, 2007 WRITTEN OFF | $0 |
| Issued | Violation | Status |
|---|---|---|
| Aug 21, 2024 | CONSTRUCTION NOTED AT EXP#1, BRICK FACADE AT GROUND LEVEL, ADJACENT TO MAIN ENTRANCE HAS SECTION OF BRICKS THAT ARE BOWING OUTWARDS APPORX.1 INCH, WITH HORIZONTAL & STEP CRACKS ALONG THE FACADE'S VARIOUS LOCATIONS. NYSPE REPORT REQUESTED. #24-02347 | DOB VIOLATION - ACTIVE |
| Jan 13, 1997 | LOCAL LAW 10/81 - ELEVATOR #02183 | DOB VIOLATION - ACTIVE |
| Dec 3, 1993 | PUBLIC ASSEMBLY #0801W | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Oct 31, 2025 | Gas Piping - LL152 FTF-PL-PER Cycle 1, Sub-cycle C (premises is in Community District 8) | Active |
| Oct 25, 2024 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2023 External Inspection Affirmation of Correction for LP Device | Active |
None open.
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)