4 floors · 32 apartments · 31,600 sq ft · built 1905 · class C1 · owner of record: Dempsey Patrick Hayes
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Overdue | Registration expired 2026-09-01 |
| Gas piping inspection (2026 cycle) Likely applies Local Law 152 · During 2026 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 8 is on the 2026 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2026 in 70 days | Due this year |
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 70 days | Keep the report on file (not filed with DOB) |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 70 days | Annual |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 86 days | Annual |
| Energy and water benchmarking Likely applies Local Law 84 · May 1 each year What this isBuildings over 25,000 sq ft (this lot shows 31,600 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page | May 1, 2027 in 191 days | Annual filing |
| Building emissions report Likely applies Local Law 97 · May 1 each year (extensions available) What this isCovered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page | May 1, 2027 in 191 days | Annual filing |
| Annual boiler inspection (1 boiler) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-08-26 (Accepted). Agency page | On file | 2026 reports accepted |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Jul 20, 2026 | Construction CLASS - 2 ON ARRIVAL AT 630 LINCOLN PLACE, I OBSERVED THREE CARS (TWO WITHOUT LICENSE PLATES & ONE WITH LICENSE PLATE 4760 CE FORD: CONNECTICUT PLATES) LOCATED AT EXPOSURE 1 ON LAWN OF PROPERTY. UNIDENTIFIED CARS WERE RE #39196830J | Nov 16, 2026 PENDING | $1,250 |
| Issued | Violation | Status |
|---|---|---|
| Apr 29, 2021 | FAILURE TO POST ENERGY GRADE/SCORE FAILURE TO DISPLAY ENERGY EFFICIENCY SCORE AND ENERGY EFFICIENCY GRADE AS PER ADCODE SEC. 28-309.12.3 #2003046 | DOB VIOLATION - ACTIVE |
| Nov 8, 2019 | LOW PRESSURE BOILER VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2017 INSPECTION REPORT #05607 | DOB VIOLATION - ACTIVE |
| Aug 2, 2019 | FAILURE TO BENCHMARK FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4 #01044 | DOB VIOLATION - ACTIVE |
| May 2, 2019 | FAILURE TO BENCHMARK FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4 #01956 | DOB VIOLATION - ACTIVE |
| Mar 16, 1999 | LOCAL LAW 62/91 - BOILERS #15076 | DOB VIOLATION - ACTIVE |
| Aug 16, 1993 | LOCAL LAW 62/91 - BOILERS #36149 | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Oct 8, 2026 | GHG Emissions - LL97 FTF-EN-LL97321 FAILURE TO FILE A COMPLIANCE REPORT AS REQUIRED BY AD CODE SEC. 28-321.3 IN ACCORDANCE WITH 1 RCNY § 103-17(B). | Active |
| Jun 24, 2026 | GHG Emissions - LL97 FTF-EN-LL97321 | Active |
| Apr 29, 2021 | Energy Grade - LL33 FTP-EN-EGRDEA | Active |
| Nov 8, 2019 | Boiler LBLVIO VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2017 INSPECTION REPORT | Active |
| Aug 2, 2019 | Benchmarking - LL84 FTF-EN-BENCH | Active |
| May 2, 2019 | Benchmarking - LL84 FTF-EN-BENCH | Active |
| Mar 16, 1999 | Boiler LL6291 | Active |
| Issued | Class | Violation | Correct by |
|---|---|---|---|
| Feb 10, 2022 | A | Apt 3 · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL WALLS AND CEILINGS THROUGHOUT IN THE ENTIRE APARTMENT LOCATED AT APT 3, 1st STORY, 2nd APARTMENT FROM WEST AT NORTH , SECTION ''EAST'' | May 16, 2022 |
| Feb 10, 2022 | A | Apt 3 · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD FLOOR IN THE PRIVATE HALLWAY LOCATED AT APT 3, 1st STORY, 2nd APARTMENT FROM WEST AT NORTH , SECTION ''EAST'' | May 16, 2022 |
| Feb 10, 2022 | A | Apt 3 · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE ALL WOOD FLOOR IN THE ENTIRE APARTMENT LOCATED AT APT 3, 1st STORY, 2nd APARTMENT FROM WEST AT NORTH , SECTION ''EAST'' | May 16, 2022 |
| Feb 10, 2022 | C | Apt 3 · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 3, 1st STORY, 2nd APARTMENT FROM WEST AT NORTH , SECTION ''EAST'' | Mar 8, 2022 |
| Aug 26, 2019 | B | § 27-2021 ADM CODE PROVIDE SUFFICIENT, PROPER AND SEPARATE METAL RECEPTACLES FOR THE DEPOSIT OF GARBAGE, RUBBISH AND OTHER WASTE MATERIAL AND ARRANGE FOR COLLECTION AND DISPOSAL OF SUCH MATERIAL. | Sep 30, 2019 |
| Aug 26, 2019 | B | § 27-2005, 2007 ADM CODE AND DEPT. RULES AND REGULATIONS. REMOVE THE ENCUMBRANCE OBSTRUCTING EGRESS FROM FIRE ESCAPES FLOWER POTS AT 3RD AND 4TH STORY BALCONY WEST STACK AT BUILDING FRONT | Sep 30, 2019 |
| Aug 26, 2019 | B | § 27-2005, 2006, 2037 HMC: PROPERLY REPAIR AND ABATE UNSAFE ELECTRIC WIRING CONDITION CONSISTING OF EXPOSED ELECTRICAL WIRES AT EAST WEST AND SOUTH WALL AT PUBLIC HALL, 1st STORY | Sep 30, 2019 |
| Jun 24, 2011 | B | SECTION 27-2010, 2011, 2012 ADM CODE REMOVE THE ACCUMULATION OF REFUSE AND/OR RUBBISH AND MAINTAIN IN A CLEAN CONDITION THE ...,,.WOOD DEBRIS AT EAST YARD | Jul 29, 2011 |
| Jul 1, 2008 | B | D26-10.01 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE ASPHALT FLASHING PARAPET WALLS ROOF FRONT EAST WEST NORTH. | Aug 5, 2008 |
| Date | Source | What | Now |
|---|---|---|---|
| Oct 8, 2026 | DOB Safety | GHG Emissions - LL97: FAILURE TO FILE A COMPLIANCE REPORT AS REQUIRED BY AD CODE SEC. 28-321.3 IN ACCORDANCE WITH 1 RCNY § 103-17(B). | Open |
| Jul 20, 2026 | ECB | Construction: ON ARRIVAL AT 630 LINCOLN PLACE, I OBSERVED THREE CARS (TWO WITHOUT LICENSE PLATES & ONE WITH LICENSE PLATE 4760 CE FORD: CONNECTICUT PLATES) LOCATED AT EXPOSURE 1 ON LAWN OF PROPERTY. UNIDENTIFIED CARS WERE RE | Open |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Oct 22, 2026, 6:12 PM ET. BBL 3012590029.